IP Library › Granted Patent US 7,072,805
Granted Patent B2
US 7,072,805 · App. 10/688,293 · Granted Jul 4, 2006

Mechanism for on-line prediction of future performance measurements in a computer system

Assignee: International Business Machines Corporation
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,072,805
App. No.
10/688,293
Granted
Jul 4, 2006
Kind
B2
Abstract

Disclosed are a method and system for predicting future values of a target metric associated with a task executed on a computer system. The method includes the steps of, over a given period of time, measuring at least one defined metric, transforming that measurement into a value for a predictor source metric, and using the value for the predictor source metric to obtain a predicted future value for said target metric. The preferred embodiment of this invention provides a flexible performance multi-predictor to solve the problem of providing accurate future behavior predictions for adaptive reconfiguration systems. The multi-predictor makes predictions about future workload characteristic by periodically reading available hardware counters. Also disclosed is a method and system for periodically reconfiguring an adaptive computer system by rescheduling tasks based on future behavior predictions.

Claims (7)

1. A method of predicting future values of a target metric associated with a task executed on a computer system, comprising the steps:

over a given period of time, measuring at least one defined metric; transforming said measurement into a value for a predictor source metric; and

using the value for the predictor source metric to obtain a predicted future value for said target metric;

wherein the using step includes the step of providing a set of possible future values, including the steps of:

i) identifying values that the target metric had at different times;

ii) for each of said identified values of the target metric, determining the value that the source metric had before the time at which the target metric had the identified value; and

iii) using said identified values of the target metric as the possible future values.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 17, 2003
From: CASCAVAL, GHEORGHE C.; DUESTERWALD, EVELYN; DWARKADAS, SANDHYA
To: INTERNATIONAL BUSINESS MACHINES CORPORATION
Reel/Frame 014626/0188 →
Continuity (1)
Related Publication 20050086029A1 · Apr 21, 2005