IP Library Granted Patent US 6,953,391
Granted Patent B1
US 6,953,391 · App. 10/901,678 · Granted Oct 11, 2005

Methods for reducing slurry usage in a linear chemical mechanical planarization system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,953,391
App. No.
10/901,678
Granted
Oct 11, 2005
Kind
B1
Abstract

Methods for dispensing slurry in a linear chemical mechanical planarization (CMP) system are provided. One method involves the use of a pulsing flow of slurry instead of a continuous flow of slurry. Another method involves spraying a mist of slurry onto the polishing pad. Yet another method involves controlling the gap between the nozzles from which the slurry is dispensed and the top surface of the polishing pad. Each of these methods reduces the amount of slurry used during a CMP operation.

Claims (16)

1. In a linear chemical mechanical planarization system, a method for dispensing slurry, comprising:

spraying a mist of slurry onto a polishing pad, wherein the mist of slurry is generated by flowing slurry through a plurality of nozzles in the presence of a pressurizing agent comprising a gas selected from the group consisting of nitrogen, helium, and argon.

2. The method of claim 1 , wherein the plurality of nozzles is disposed on a showerhead.

3. In a chemical mechanical planarization system, a method for dispensing slurry, comprising:

(a) spraying a mist of slurry onto a polishing pad for a first period of time;

(b) stopping the spraying of the mist of slurry for a second period of time; and

(c) repeating operations (a) and (b) at least once during a CMP operation.

4. The method of claim 3 , wherein the first period of time and the second period of time are substantially the same.

5. The method of claim 3 , wherein the first period of time is about 5 seconds and the second period of time is about 5 seconds.

6. The method of claim 3 , wherein the first period of time is about 10 seconds and the second period of time is about 10 seconds.

7. The method of claim 3 , wherein the first period of time is about 20 seconds and the second period of time is about 20 seconds.

8. The method of claim 3 , wherein the first period of time is about 10 seconds and the second period of time is about 20 seconds.

9. The method of claim 3 , wherein operations (a) and (b) are alternately repeated during a CMP operation.

10. A chemical mechanical planarization system, comprising:

a polishing pad; and

a slurry manifold including at least one showerhead having a plurality of nozzles configured to spray a mist of slurry onto a top surface of the polishing pad, wherein the slurry manifold is coupled in flow communication with a pressurizing agent comprising a gas selected from the group consisting of nitrogen, helium, and argon.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 23, 2011
From: LAM RESEARCH CORPORATION
To: APPLIED MATERIALS, INC.
Reel/Frame 026006/0750 →