IP Library Granted Patent US 7,055,333
Granted Patent B2
US 7,055,333 · App. 11/124,444 · Granted Jun 6, 2006

High pressure CO

Assignee: The BOC Group, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,055,333
App. No.
11/124,444
Granted
Jun 6, 2006
Kind
B2
Abstract

A batch process and apparatus for producing a pressurized liquid carbon dioxide stream includes distilling a feed stream of carbon dioxide vapor off of a liquid carbon dioxide supply; introducing the carbon dioxide vapor feed stream into at least one purifying filter; condensing the purified feed stream within a condenser to form an intermediate liquid carbon dioxide stream; introducing the intermediate liquid carbon dioxide stream into at least one high-pressure accumulation chamber; heating the high pressure accumulation chamber to pressurize the liquid carbon dioxide contained therein to a delivery pressure; delivering a pressurized liquid carbon dioxide stream from the high-pressure accumulation chamber; and, discontinuing delivery of the pressurized liquid carbon dioxide stream for replenishing the high pressure accumulation chamber.

Claims (17)

1. A batch process for producing a pressurized liquid carbon dioxide stream comprising:

distilling a feed stream comprising carbon dioxide vapor off a liquid carbon dioxide supply;

introducing the carbon dioxide vapor feed stream into at least one purifying filter;

condensing the purified feed stream within a condenser to form an intermediate liquid carbon dioxide stream;

accumulating the intermediate liquid carbon dioxide stream in a receiver prior to introduction into the high-pressure accumulation chamber;

introducing the intermediate liquid carbon dioxide stream into the at least one high-pressure accumulation chamber;

heating said high pressure accumulation chamber to pressurize the liquid carbon dioxide contained therein to a delivery pressure;

delivering a pressurized liquid carbon dioxide stream from the high-pressure accumulation chamber; and,

discontinuing delivery of the pressurized liquid carbon dioxide stream for replenishing the high pressure accumulation chamber.

2. The process of claim 1 , further comprising venting the high-pressure accumulation chamber to the condenser to facilitate introduction of the intermediate liquid carbon dioxide stream into the high-pressure accumulation chamber.

3. The process of claim 1 , further comprising passing the pressurized liquid carbon dioxide stream through a particle filter prior to delivery to a cleaning process.

4. The process of claim 1 , wherein said feed stream is condensed within said condenser through indirect heat exchange with a refrigerant stream.

5. The process of claim 1 , wherein the condenser is integral with the receiver.

6. The process of claim 1 , further comprising detecting when the high-pressure accumulation chamber requires replenishment of liquid carbon dioxide.

7. The process of claim 1 , wherein the high-pressure accumulation chamber is electrically heated.

8. The process of claim 1 , wherein the carbon dioxide vapor feed stream is introduced into a coalescing filter.

9. The process of claim 1 , wherein the carbon dioxide vapor feed stream is introduced into a particle filter.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 7, 2019
From: MESSER LLC
To: MESSER INDUSTRIES USA, INC.
Reel/Frame 049983/0990 →
CHANGE OF NAME Recorded Jul 2, 2019
From: THE BOC GROUP, INC.
To: LINDE, INC.
Reel/Frame 049649/0128 →
MERGER Recorded Jul 2, 2019
From: LINDE, INC.
To: LINDE LLC
Reel/Frame 049649/0131 →
CHANGE OF NAME Recorded Jul 2, 2019
From: LINDE LLC
To: MESSER LLC
Reel/Frame 049649/0193 →
Continuity (3)
Division 1067084800 · Sep 25, 2003
Provisional Application 6041564100 · Oct 2, 2002
Related Publication 20050198971A1 · Sep 15, 2005