US 7,305,276 · App. 11/163,793 · Granted Dec 4, 2007

Method, system, and computer program product for controlling the flow of material in a manufacturing facility using an extended zone of control

Assignee: International Business Machines Corporation
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,305,276
App. No.
11/163,793
Granted
Dec 4, 2007
Kind
B2
Abstract

The present invention provides a method, system, and computer program product for controlling the flow of material in a manufacturing facility using an extended zone of control. A method in accordance to an embodiment of the present invention comprises establishing an extended zone of control including a high impact tool set and at least one other tool set, analyzing projected job arrivals at the high impact tool set, and adjusting a flow of material between the high impact tool set and the at least one other tool set based on the analysis of projected job arrivals at the high impact tool set.

Claims (15)

1. A method for controlling a flow of material in a manufacturing facility, comprising:

establishing an extended zone of control including a high impact tool set, at least one upstream tool set, and at least one key downstream tool set, wherein the upstream tool set comprises a tool set that processes a job that is expected to arrive at the high impact tool set within a specified period of time;

analyzing projected job arrivals from each upstream tool set at the high impact tool set;

adjusting a flow of material between the high impact tool set, each upstream tool set, and each key downstream tool set based on the analysis of projected job arrivals at the high impact tool set, the adjusting comprising adjusting a flow of material between the high impact tool set and each key downstream tool set to prevent starvation of each key downstream tool set and excess work in progress build up at each key downstream tool set.

2. The method of claim 1 , wherein the high impact tool set and each uptream and key downstream tool set includes a local control agent.

3. The method of claim 1 , wherein the high impact tool set comprises a tool set that restricts an overall throughput of the manufacturing facility if not scheduled properly.

4. A system for controlling a flow of material in a manufacturing facility, comprising:

a system for establishing an extended zone of control including a high impact tool set, at least one upstream tool set, and at least one key downstream tool set, wherein the upstream tool set comprises a tool set that processes a job that is expected to arrive at the high impact tool set within a specified period of time;

a game planner for analyzing projected job arrivals from each upstream tool set at the high impact tool set and for adjusting a flow of material between the high impact tool set, each upstream tool set, and each key downstream tool set based on the analysis of projected job arrivals at the high impact tool set, the adjusting comprising adjusting a flow of material between the high impact tool set and each key downstream tool set to prevent starvation of each key downstream tool set and excess work in progress build up at each key downstream tool set.

5. The system of claim 4 , wherein the high impact tool set and each uptream and key downstream tool set includes a local control agent.

6. The system of claim 4 , wherein the high impact tool set comprises a tool set that restricts an overall throughput of the manufacturing facility if not scheduled properly.

7. A program product stored on a computer readable medium for controlling a flow of material in a manufacturing facility, the computer readable medium comprising program code for performing the following steps:

establishing an extended zone of control including a high impact tool set, at least one upstream tool set, and at least one key downstream tool set, wherein the upstream tool set comprises a tool set that processes a job that is expected to arrive at the high impact tool set within a specified period of time;

analyzing projected job arrivals from each upstream tool set at the high impact tool set; and

adjusting a flow of material between the high impact tool set, each upstream tool set, and each key downstream tool set based on the analysis of projected job arrivals at the high impact tool set, the adjusting comprising adjusting a flow of material between the high impact tool set and each key downstream tool set to prevent starvation of each key downstream tool set and excess work in progress build up at each key downstream tool set.

Assignments (3)
CHANGE OF NAME Recorded Oct 6, 2017
From: GOOGLE INC.
To: GOOGLE LLC
Reel/Frame 044142/0357 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 13, 2011
From: INTERNATIONAL BUSINESS MACHINES CORPORATION
To: GOOGLE INC.
Reel/Frame 026894/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 31, 2005
From: BURDA, RICHARD G.; DEGBOTSE, ALFRED T.; DENTON, BRIAN T.; FORDYCE, KENNETH J.; MILNE, ROBERT J.
To: INTERNATIONAL BUSINESS MACHINES CORPORATION
Reel/Frame 016707/0052 →
Continuity (1)
Related Publication 20070100486A1 · May 3, 2007