IP Library Granted Patent US 7,770,655
Granted Patent B2
US 7,770,655 · App. 11/458,411 · Granted Aug 10, 2010

Conductor casing installation by anchor handling/tug/supply vessel

Assignee: InterMoor Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,770,655
App. No.
11/458,411
Granted
Aug 10, 2010
Kind
B2
Abstract

An anchor handling/tug/supply (AHTS) vessel is employed to engage conductor casings with the seafloor. The conductor casings initially penetrate the seafloor to a first depth under their own weight. The conductor casings may optimally be further engaged with the seafloor to a second depth by the application of suction to the interiors thereof or by the use of a drop hammer. The conductor casings are driven to grade by a hydraulic pile driving hammer deployed from the deck of the AHTS vessel the previously deployed conductor casings to grade before being recovered to the deck of the AHTS vessel.

Claims (42)

1. A method of installing conductor casings at a designated location on the seafloor comprising the steps of:

providing a plurality of conductor casings;

providing a vessel having a winch mounted thereon;

providing an elongate flexible member selected from the group consisting of cables, chains and ropes;

winding the elongate flexible member onto the winch;

providing a barge;

initially positioning the plurality of conductor casings on the barge;

connecting the distal end of the elongate flexible member to a first of the plurality of conductor casings on the barge;

removing the first conductor casing from the barge and thereafter utilizing the winch and the elongate flexible member to lower the first conductor casing to the seafloor at a predetermined drilling location thereon;

utilizing the weight of the first conductor casing to initially embed the conductor casing into the seafloor;

providing a source of suction;

connecting the source of suction to the first of the conductor casings following the initial embedding thereof in the seafloor and thereby further embedding the conductor casings into the seafloor;

removing the distal end of the elongate flexible member from the first conductor casing and attaching the distal end to a second conductor casing;

removing the second conductor casing from the barge and thereafter utilizing the winch and the elongate flexible member to lower the second conductor casing to the seafloor at a predetermined drilling location thereon to from an array of conductor casings on the seafloor;

utilizing the weight of the second conductor casing to initially embed the conductor casing into the seafloor;

connecting the source of suction to the second of the conductor casings following the initial embedding thereof in the seafloor and thereby further embedding the conductor casing into the seafloor;

removing the distal end of the elongate flexible member from the second conductor and placing the remainder of the plurality of conductors into predetermined drilling locations with the winch and elongate flexible members to form an array of conductor casings initially embedded into the seafloor under the weight of the casings and then further embedded into the seafloor under the application of suction to the conductor casings;

providing a hydraulic pile driving hammer;

initially positioning the hydraulic pile driving hammer on the vessel;

after the array of conductor casings has been formed, utilizing the winch and the elongate flexible member to lower the hydraulic pile driving hammer into engagement with each of the conductor casings in the array; and

utilizing the hydraulic pile driving hammer deployed from the vessel to further embed the plurality of conductor casings in the array.

2. A method of installing conductor casings at a designated location on the seafloor comprising the steps of:

providing a plurality of conductor casings;

providing a vessel having a winch mounted thereon;

providing an elongate flexible member selected from the group consisting of cables, chains and ropes;

winding the elongate flexible member onto the winch;

providing a barge;

initially positioning the plurality of conductor casings on the barge;

connecting the distal end of the elongate flexible member to a top plate attached to a first of the plurality of conductor casings on the barge;

removing the first conductor casing from the barge and thereafter utilizing the winch and the elongate flexible member to lower the first conductor casing to the seafloor at a predetermined drilling location thereon;

utilizing the weight of the first conductor casing to initially embed the conductor casing into the seafloor;

providing a source of suction;

connecting the source of suction to the top plate on the first of the conductor casings following the initial embedding thereof in the seafloor and thereby further embedding the conductor casings into the seafloor;

removing the top plate and distal end of the elongate flexible member from the first conductor casing and attaching the distal end to a top plate attached to a second conductor casing;

removing the second conductor casing from the barge and thereafter utilizing the winch and the elongate flexible member to lower the second conductor casing to the seafloor at a predetermined drilling location thereon to from an array of conductor casings on the seafloor;

utilizing the weight of the second conductor casing to initially embed the conductor casing into the seafloor;

connecting the source of suction to the top plate on the second conductor casing following the initial embedding thereof in the seafloor and thereby further embedding the conductor casing into the seafloor;

removing the top plate and distal end of the elongate flexible member from the second conductor and placing the remainder of the plurality of conductors into predetermined drilling locations with the winch and elongate flexible members to form an array of conductor casings initially embedded into the seafloor under the weight of the casings and then further embedded into the seafloor under the application of suction to the conductor casings;

providing a hydraulic pile driving hammer;

initially positioning the hydraulic pile driving hammer on the vessel;

after the array of conductor casings has been formed, utilizing the winch and the elongate flexible member to lower the hydraulic pile driving hammer into engagement with each of the conductor casings in the array; and

utilizing the hydraulic pile driving hammer deployed from the vessel to further embed the plurality of conductor casings in the array.

Assignments (4)
SECURITY INTEREST Recorded Apr 4, 2024
From: INTERMOOR, INC.; DEEPWATER CORROSION SERVICES, INC.
To: GLAS TRUST CORPORATION LIMITED, AS SECURITY AGENT
Reel/Frame 067008/0882 →
RELEASE OF SECURITY INTEREST Recorded Mar 26, 2024
From: LLOYDS TSB BANK PLC
To: INTERMOOR, INC.
Reel/Frame 066899/0107 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 7, 2006
From: VAN LUIPEN, PIETER; ZAMBONI, ECKHARD
To: INTERMOOR, INC.
Reel/Frame 018060/0752 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 19, 2006
From: WILDE, GORDON ROBERT
To: INTERMOOR, INC.
Reel/Frame 017956/0139 →
Continuity (2)
Provisional Application 6070087900 · Jul 20, 2005
Related Publication 20070017680A1 · Jan 25, 2007