IP Library Granted Patent US 7,702,436
Granted Patent B2
US 7,702,436 · App. 11/541,241 · Granted Apr 20, 2010

System and method of troubleshooting aircraft system failures

Assignee: Standard Aero (San Antonio), Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,702,436
App. No.
11/541,241
Granted
Apr 20, 2010
Kind
B2
Abstract

A method of determining a preferred order of implementing maintenance tasks and determining a plurality of maintenance tasks related to a received maintenance request is disclosed. A first expected cost of implementing the plurality of maintenance tasks in a first order and a second expected cost of implementing the plurality of maintenance tasks in a second order are determined. An implementation order for the plurality of maintenance tasks is selected based at least in part on the first and second expected costs. Expected costs may be determined based at least in part on the cost of implementing each maintenance task and based on the probability that the problem has not yet been addressed by preceding tasks.

Claims (53)

1. A method comprising:

receiving a maintenance request associated with a mechanical system;

determining a plurality of maintenance tasks related to the maintenance request;

determining a first expected cost of implementing the plurality of maintenance tasks in a first order;

determining a second expected cost of implementing the plurality of maintenance tasks in a second order, wherein the second order is different from the first order; and

automatically selecting an implementation order from the first order and the second order based at least in part on a comparison of the first expected cost and the second expected cost.

2. The method of claim 1 , wherein the mechanical system includes an aircraft engine.

3. The method of claim 1 , wherein at least one of the first expected cost and the second expected cost is determined based at least in part on historical data.

4. The method of claim 1 , wherein the implementation order with a lower expected cost is automatically selected.

5. A method comprising:

identifying a plurality of tasks to repair a mechanical system;

determining a cost of implementing each task of the plurality of tasks;

determining a probability that each task of the plurality of tasks will repair the mechanical system;

determining a proposed order of implementing the plurality of tasks; and

determining an expected cost of repairing the mechanical system based on the cost of implementing each task and a probability that the mechanical system has not been repaired by preceding tasks in the proposed order, wherein the probability that the mechanical system has not been repaired by preceding tasks is based on the probability that each task of the plurality of tasks will repair the mechanical system.

6. A maintenance system comprising:

a work scope generator to determine a plurality of maintenance tasks based at least in part on symptoms of a mechanical system and to determine an implementation order of the plurality of maintenance tasks based on an expected cost of troubleshooting the mechanical system,

wherein the implementation order is determined by the work scope generator based at least in part on a probability that each maintenance task of the plurality of maintenance tasks will correct the symptoms of the mechanical system and based at least in part on a cost of implementing each maintenance task of the plurality of maintenance tasks.

7. The maintenance system of claim 6 , further comprising a database of maintenance tasks associated with symptoms of the mechanical system.

8. The maintenance system of claim 6 , further comprising historical maintenance data accessible to the work scope generator, wherein the probability of each maintenance task resolving the symptoms of the mechanical system is determined at least partially based on the historical maintenance data.

9. The maintenance system of claim 6 , further comprising historical maintenance data accessible to the work scope generator, wherein the cost of implementing each task is determined at least partially based on the historical maintenance data.

10. A computer readable medium tangibly embodying a program of instructions to manipulate a computing system to:

receive a maintenance request associated with a mechanical system;

determine a plurality of maintenance tasks related to the maintenance request;

determine a first expected cost of implementing the plurality of maintenance tasks in a first order;

determine a second expected cost of implementing the plurality of maintenance tasks in a second order, wherein the second order is different from the first order; and

automatically select an implementation order from the first order and the second order based at least in part on a comparison of the first expected cost and the second expected cost.

11. A computer readable medium tangibly embodying a program of instructions to manipulate a computing system to:

determine a cost of implementing each task of a plurality of tasks to repair a mechanical system;

determine a probability that each task of the plurality of tasks will repair the mechanical system;

determine a proposed order of implementing the plurality of tasks; and

determine an expected cost to repair the mechanical system based on the cost of implementing each task and a probability that the mechanical system has not been repaired by preceding tasks in the proposed order, wherein the probability that the mechanical system has not been repaired by the preceding tasks is based on the probability that each task of the plurality of tasks will repair the mechanical system.

12. The computer readable medium of claim 11 , wherein the program of instructions further manipulates the computing system to determine a plurality of proposed orders of implementing the plurality of tasks and to determine the expected cost to repair the mechanical system based on each of the plurality of proposed orders.

13. The computer readable medium of claim 12 , wherein the program of instructions further manipulates the computing system to identify one of the plurality of proposed orders with the lowest expected cost to repair the mechanical system.

14. The method of claim 1 , further comprising:

determining a first expected time to implement the plurality of maintenance tasks in the first order; and

determining a second expected time to implement the plurality of maintenance tasks in the second order,

wherein the implementation order is automatically selected based on the comparison of the first expected cost and the second expected cost and based on a comparison of the first expected time to implement the plurality of maintenance tasks in the first order and the second expected time to implement the plurality of maintenance tasks in the second order.

15. The method of claim 14 , wherein the implementation order with the lowest expected cost under a threshold time to implement the plurality of maintenance tasks is automatically selected.

16. The method of claim 14 , wherein the implementation order with the shortest implementation time below a threshold cost is automatically selected.

17. The method of claim 1 , wherein the first expected cost and the second expected cost include at least one of costs associated with the plurality of maintenance tasks, costs associated with one or more replacement parts, and costs associated with the mechanical system being out of service.

18. The method of claim 1 , further comprising:

determining a probability that each maintenance task of the plurality of maintenance tasks will repair the mechanical system;

determining a cost of implementing each maintenance task of the plurality of maintenance tasks; and

for each maintenance task in the first order,

determining an overall probability that one or more maintenance tasks that precede a particular maintenance task in the first order have repaired the mechanical system based on the probability associated with each of the one or more maintenance tasks that precede the particular maintenance task in the first order; and

determining an expected cost of implementing the particular maintenance task in the first order based on the overall probability and based on the cost of implementing the particular maintenance task,

wherein the first expected cost of implementing the plurality of maintenance tasks in the first order is determined based on the expected cost of implementing each maintenance task in the first order.

19. The method of claim 18 , further comprising:

for each maintenance task in the second order,

determining an overall probability that one or more maintenance tasks that precede a particular maintenance task in the second order have repaired the mechanical system based on the probability associated with each of the one or more maintenance tasks that precede the particular maintenance task in the second order; and

determining an expected cost of implementing the particular maintenance task in the second order based on the overall probability and based on the cost of implementing the particular maintenance task,

wherein the second expected cost of implementing the plurality of maintenance tasks in the second order is determined based on the expected cost of implementing each maintenance task in the second order.

Assignments (12)
RELEASE OF SECURITY INTEREST Recorded Apr 10, 2019
From: JEFFERIES FINANCE LLC, AS COLLATERAL AGENT
To: STANDARD AERO (SAN ANTONIO) INC.
Reel/Frame 048846/0017 →
RELEASE OF SECURITY INTEREST Recorded Apr 10, 2019
From: BANK OF AMERICA, N.A., AS COLLATERAL AGENT
To: ASSOCIATED AIR CENTER, L.P.; STANDARDAERO BUSINESS AVIATION SERVICES, LLC; STANDARDAERO COMPONENT SERVICES, INC. (FORMERLY TSS AVIATION, INC.); STANDARD AERO (SAN ANTONIO) INC.; PAS TECHNOLOGIES INC.
Reel/Frame 048846/0284 →
CORRECTIVE ASSIGNMENT TO CORRECT THE NAME OF THE RECEIVING PARTY PREVIOUSLY RECORDED ON REEL 036083 FRAME 0736. ASSIGNOR(S) HEREBY CONFIRMS THE RELEASE OF PATENT SECURITY INTEREST R032251 F0178. Recorded Jul 24, 2015
From: BARCLAYS BANK PLC, AS COLLATERAL AGENT
To: STANDARD AERO (SAN ANTONIO) INC., AS PLEDGOR
Reel/Frame 036180/0918 →
RELEASE OF PATENT SECURITY INTEREST R029382 F0879 Recorded Jul 9, 2015
From: BARCLAYS BANK PLC, AS COLLATERAL AGENT
To: STANDARD AERO (SAN ANTONIO) INC., AS PLEDGOR
Reel/Frame 036083/0529 →
RELEASE OF PATENT SECURITY INTEREST R029382 F0966 Recorded Jul 9, 2015
From: BANK OF AMERICA, N.A., AS COLLATERAL AGENT; BARCLAYS BANK PLC, AS COLLATERAL AGENT
To: STANDARD AERO (SAN ANTONIO) INC., AS PLEDGOR
Reel/Frame 036083/0699 →
RELEASE OF PATENT SECURITY INTEREST R032251 F0178 Recorded Jul 9, 2015
From: BARCLAYS BANK PLC, AS COLLATERAL AGENT
To: STANDARD AERO (SAN ANTONIO) IN., AS PLEDGOR
Reel/Frame 036083/0736 →
SECURITY INTEREST Recorded Jul 7, 2015
From: STANDARD AERO (SAN ANTONIO) INC.
To: BANK OF AMERICA, N.A.,AS COLLATERAL AGENT
Reel/Frame 036092/0037 →
PATENT SECURITY AGREEMENT Recorded Jul 7, 2015
From: STANDARD AERO (SAN ANTONIO) INC.
To: JEFFERIES FINANCE LLC AS COLLATERAL AGENT
Reel/Frame 036073/0748 →
SECURITY AGREEMENT Recorded Feb 12, 2014
From: STANDARD AERO (SAN ANTONIO) INC.
To: BARCLAYS BANK PLC, AS COLLATERAL AGENT
Reel/Frame 032251/0178 →
PATENT SECURITY AGREEMENT Recorded Nov 29, 2012
From: STANDARD AERO (SAN ANTONIO) INC.
To: BARCLAYS BANK PLC
Reel/Frame 029382/0879 →
PATENT SECURITY AGREEMENT Recorded Nov 29, 2012
From: STANDARD AERO (SAN ANTONIO) INC.
To: BANK OF AMERICA, N.A.
Reel/Frame 029382/0966 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 29, 2006
From: WINGENTER, RONALD
To: STANDARD AERO (SAN ANTONIO), INC.
Reel/Frame 018371/0797 →
Continuity (1)
Related Publication 20080082229A1 · Apr 3, 2008