IP Library Granted Patent US 8,043,755
Granted Patent B2
US 8,043,755 · App. 11/587,140 · Granted Oct 25, 2011

Fuel cell based power generation systems and methods of operating the same

Assignee: NuCellSys GmbH
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,043,755
App. No.
11/587,140
Granted
Oct 25, 2011
Kind
B2
Abstract

A power generation system has a fuel cell stack and at least one condensation point in the system at which water present after shutdown of the power generation system can condense or collect. Drying after shutdown is improved by maintaining a temperature gradient between the condensation point and at least one other component in the power generation system after shutdown. In one embodiment, the temperature gradient is maintained by housing the fuel cell stack in a thermally insulated container and arranging the condensation point outside of the insulating container. In another embodiment, drying after shutdown is accomplished with an adsorption unit having a water-adsorbing material arranged in a desired location within the power generation system.

Claims (25)

1. A fuel cell based power generation system comprising:

a first component that is operable to condense water present in the power generation system after an operational shutdown of the system, the first component having a first temperature after said operational shutdown;

at least one other component having a second temperature that is higher than the first temperature of the first component after said operational shutdown, said at least one other component comprising a fuel cell stack having at least one fuel cell; and

a subsystem to maintain a temperature gradient between the first component and the at least one other component for a period of time after the operational shutdown; wherein,

the subsystem comprises a first thermal insulator that houses the at least one other component;

the first component is situated outside the first thermal insulator, and attenuates weakening of the temperature gradient; and

the first component is a condenser.

2. The power generation system of claim 1 , wherein the at least one other component is selected from the group of components consisting of a sensor, a valve, and a fan.

3. The power generation system of claim 1 , further comprising:

a thermal bridge coupling the first thermal insulator to a second component of the power generation system, the second component being located outside of the first thermal insulator.

4. The power generation system of claim 3 wherein the thermal bridge is operable to selectively transfer heat from the first thermal insulator to the second component.

5. The power generation system of claim 1 , further comprising: a water adsorbing material located within the power generation system to attract at least some water present within the system after the operational shutdown of the system.

6. The power generation system of claim 1 , wherein the subsystem comprises a fan to cool the first component.

7. The power generation system according to claim 1 , wherein the fuel cell stack of the at least one other component is in fluid communication with the first component.

8. A fuel cell based power generation system comprising:

a first component that is operable to condense water present in the power generation system after an operational shutdown of the system, the first component having a first temperature after said operational shutdown;

at least one other component having a second temperature that is higher than the first temperature of the first component after said operational shutdown, said at least one other component comprising a fuel cell stack having at least one fuel cell; and

a subsystem to maintain a temperature gradient between the first component and the at least one other component for a period of time after the operational shutdown; wherein,

the subsystem comprises a first thermal insulator that houses the at least one other component;

the first component is situated outside the first thermal insulator, and attenuates weakening of the temperature gradient; and

the subsystem further comprises a second thermal insulator that houses a second component.

9. The power generation system of claim 8 , wherein the second component is selected from the group of components consisting of a sensor, a valve, and a fan.

10. The power generation system of claim 8 , further comprising a thermal bridge coupling the first thermal insulator to the second thermal insulator to allow heat transfer therebetween.

11. The power generation system according to claim 10 , wherein the thermal bridge is made of a thermally conductive material.

12. The power generation system according to claim 11 , wherein the thermally conductive material is copper.

Assignments (4)
NUNC PRO TUNC ASSIGNMENT Recorded Jul 19, 2023
From: MERCEDES-BENZ CUSTOMER SOLUTIONS GMBH
To: CELLCENTRIC GMBH & CO. KG
Reel/Frame 064308/0963 →
CHANGE OF NAME Recorded Jul 19, 2023
From: NUCELLSYS GMBH
To: MERCEDES-BENZ FUEL CELL GMBH
Reel/Frame 064336/0808 →
CHANGE OF NAME Recorded Jul 19, 2023
From: MERCEDES-BENZ FUEL CELL GMBH
To: MERCEDES-BENZ CUSTOMER SOLUTIONS GMBH
Reel/Frame 064854/0489 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 22, 2007
From: LIMBECK, UWE
To: NUCELLSYS GMBH
Reel/Frame 019326/0485 →
Priority Claims (1)
DE 10 2004 020 029 · Apr 23, 2004 · national
Continuity (2)
Provisional Application 60631705 · Nov 30, 2004
Related Publication 20070287037A1 · Dec 13, 2007