IP Library Granted Patent US 7,670,085
Granted Patent B2
US 7,670,085 · App. 11/606,404 · Granted Mar 2, 2010

In situ immobilization of subsurface contamination

Assignee: Vista Engineering Technologies LLC
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,670,085
App. No.
11/606,404
Granted
Mar 2, 2010
Kind
B2
Abstract

Vertical migration of a plume of subsurface contamination in the vadose zone to the groundwater is prevented by forming and maintaining one or more desiccation layers in the vadose zone in or above a layer of contamination. Horizontal barrier layers are produced by injecting dry air at a specific elevation in one borehole and removing the air at another borehole. These horizontal layers act as an impermeable barrier to the vertical migration of dissolved contaminants.

Claims (24)

1. A method for preventing vertical migration of a subsurface contamination plume in the vadose zone to the groundwater comprising the steps of forming at least two desiccation layers in the vadose zone, including a first desiccation layer in the plume and a second desiccation layer above the plume, wherein the desiccation layers are formed by using a drying method to remove saturation moisture from the desiccation layers.

2. The method of claim 1 wherein the drying method uses a blower to introduce a gas into the vadose zone and a pump to withdraw the gas from the vadose zone.

3. The method of claim 1 using two desiccation layers.

4. The method of claim 1 wherein at least one desiccation layer is maintained by using the drying method in an intermittent manner after the desiccation layer is formed.

5. The method of claim 1 wherein the drying method includes at least two boreholes, and a gas is introduced into the vadose zone at a first specified elevation in a first borehole and the gas is removed at a second specified elevation in a second borehole.

6. The method of claim 5 wherein the specified elevation is the same in both boreholes.

7. The method of claim 5 wherein the gas is air.

8. The method of claim 5 wherein where the gas is dried air.

9. The method of claim 5 wherein where the gas is heated air.

10. The method of claim 5 wherein where the drying method includes at least three boreholes.

11. The method of claim 5 wherein the number of boreholes used to introduce the gas is different than the number of boreholes used to withdraw the gas.

12. The method of claim 5 wherein the drying method uses a blower to introduce the gas into the vadose zone at at least one borehole and a pump to withdraw the gas from at least one borehole.

13. The method of claim 12 wherein a plurality of blowers and pumps are used.

14. The method of claim 10 wherein at least one blower is used to introduce the gas into the vadose zone at a first specified elevation in at least one borehole and at least two pumps are used to withdraw the gas from the vadose zone at specified elevations from at least two boreholes.

15. The method of claim 10 wherein at least two blowers are used to introduce the gas to the vadose zone at specified elevations in at least two boreholes and at least one pump is used to withdraw the gas from the vadose at a specified elevation from at least one borehole.

16. A method for preventing vertical migration of a subsurface contamination plume in the vadose zone to the groundwater comprising the steps of forming at least three desiccation layers in the vadose zone, including a first desiccation layer above the plume, a second desiccation layer in the plume, and a third desiccation layer below the plume, wherein the desiccation layers are formed by using a drying method to remove saturation moisture from the desiccation layers.

17. The method of claim 16 wherein the drying method uses at least two boreholes, and a gas is introduced into the vadose zone at a first specified elevation in a first borehole and the gas is removed at a second specified elevation in a second borehole.

18. The method of claim 16 wherein the drying method uses a blower to introduce the gas into the vadose zone and a pump to withdraw the gas from the vadose zone.

19. The method of claim 16 wherein at least one desiccation layer is maintained by using the drying method in an intermittent manner after the desiccation layer is formed.

20. A method for preventing vertical migration of a subsurface contamination plume in the vadose zone to the groundwater comprising the steps of forming at least two desiccation layers in the vadose zone, including a first desiccation layer in the plume and a second desiccation layer below the plume, wherein the desiccation layers are formed by using a drying method to remove saturation moisture from the desiccation layers.

21. The method of claim 20 wherein the drying method uses at least two boreholes, and a gas is introduced into the vadose zone at a first specified elevation in a first borehole and the gas is removed at a second specified elevation in a second borehole.

22. The method of claim 20 wherein the drying method uses a blower to introduce the gas into the vadose zone and a pump to withdraw the gas from the vadose zone.

23. The method of claim 20 wherein at least one desiccation layer is maintained by using the drying method in an intermittent manner after the desiccation layer is formed.

24. The method of claim 20 using two desiccation layers.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 18, 2015
From: VISTA ENGINEERING TECHNOLOGIES, INC.
To: KURION, INC.
Reel/Frame 037332/0629 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 19, 2007
From: BRATTON, WESLEY L.; MARESCA, JR., JOSEPH W.; LOWRY, WILLIAM E.; KABACK, DAWN SAMARA
To: VISTA ENGINEERING TECHNOLOGIES LLC
Reel/Frame 019034/0280 →
Continuity (2)
Provisional Application 6074030600 · Nov 28, 2005
Related Publication 20070154267A1 · Jul 5, 2007