IP Library Granted Patent US 7,963,724
Granted Patent B2
US 7,963,724 · App. 11/882,454 · Granted Jun 21, 2011

Method of providing a support column

Assignee: Geopier Foundation Company, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,963,724
App. No.
11/882,454
Granted
Jun 21, 2011
Kind
B2
Abstract

A primary earth penetrating mandrel formed of a hollow shell steel plate octagonal in cross-section has an upper end and a blunt lower end joined by an upwardly and outwardly tapered wall. The mandrel is driven downwardly in the earth to simultaneously form a vertical tapered cavity while compacting the sidewall of the cavity to provide structural integrity. The mandrel is then moved upwardly from the bottom of the cavity and aggregate is deposited in the bottom of the cavity following which the mandrel is lowered so that its blunt lower end engages the deposited aggregate and densifies the aggregate by vertical vibratory action and static force with these steps being repeated until the pier top is near the surface of the earth at which time the upper aggregate portions are densified by either the primary mandrel or a secondary mandrel having a substantially larger lower end surface than the lower end surface of the primary mandrel. A second embodiment includes a conduit in the primary mandrel for injecting concrete or grout into aggregate previously deposited in the cavity.

Claims (43)

1. A method of forming an aggregate pier comprising the steps of:

(a) driving a downwardly tapered mandrel having a flat lower end surface and a tapered edge around the periphery of the flat lower end surface, with the width of the flat lower end surface and tapered edge being no greater than the width of the mandrel at a lower end thereof, into the ground by a power driven apparatus to form a downwardly tapered cavity to a desired depth for said aggregate pier, while outwardly compacting the sidewalls of the cavity as the cavity is being formed;

(b) moving the tapered mandrel upwardly a sufficient distance to permit access to the lower end of the cavity;

(c) depositing a layer of aggregate in the lower end of the cavity;

(d) lowering the tapered mandrel downwardly in the cavity so that the flat lower end of the mandrel engages the aggregate in the cavity and densifies the aggregate in the cavity, and displaces a portion of the aggregate laterally into the adjacent wall of the cavity by force applied by the flat lower end and tapered edge of the mandrel; and

(e) repeating steps (b), (c) and (d) until a pier component of a desired height is formed.

2. The method as described in claim 1 , wherein the compacting of the sidewall of the cavity is sufficient to maintain structural integrity of the cavity sidewalls during steps (b), (c), (d) and (e).

3. The method as described in claim 1 , wherein step (a) is effected by application of vertical vibration energy and vertical static force to the tapered mandrel.

4. The method as described in claim 3 , wherein the vertical vibration energy is provided by a vibratory hammer.

5. The method as described in claim 1 , wherein the tapered mandrel has a plurality of rigid panels flaring upwardly and outwardly above the flat lower end and defining the downward taper of the tapered mandrel.

6. The method of claim 1 , wherein step (d) is effected by application of static force and vertical vibration to the tapered mandrel while in contact with the aggregate.

7. The method of claim 1 , wherein the mandrel is moved a distance in step (b) sufficient to position the flat lower end of the mandrel at or near the top of the cavity.

8. The method of as described in claim 1 , including forming the upper end of the pier subsequent to step (e) by compacting aggregate near the top end of the cavity with a secondary tamping mandrel having a blunt lower end surface of greater area than the area of the area of the flat lower end surface of the downwardly tapered mandrel.

9. The method of claim 8 , wherein the secondary tamping mandrel is a hollow shell including a smaller diameter bottom guide portion and a top cylindrical portion having a diameter exceeding the diameter of the upper end of the downwardly tapered mandrel and wherein the smaller diameter portion is connected to the top portion by an outwardly flared canted portion and the small diameter lower portion has a transverse smaller lower end surface with the diameter of the lower portion being approximately the same as the diameter of the top of the cavity formed by the upper end of the downwardly tapered mandrel.

10. The method of claim 8 , wherein the secondary tamping mandrel has a conical surface facing downwardly to engage the upper end of the previously formed cavity.

11. The method as described in claim 8 , wherein the secondary tamping mandrel is vibrated vertically by a vibratory hammer while concurrently applying static force to the aggregate near the top of the pier.

12. The method as described in claim 8 , wherein the secondary tamping mandrel is a beveled mandrel that is vibrated vertically by a hydraulic hammer while being concurrently urged downwardly by static force.

13. The method as described in claim 1 , wherein the tapered mandrel is a unitary hollow steel shell structure including a plurality of planar panels flaring upwardly and outwardly from and above the flat lower end surface of the mandrel.

14. The method of claim 1 , wherein the tapered mandrel includes a peripheral circular flange at its upper end which extends completely around the top of the mandrel to inhibit upward movement of surficial soil during mandrel penetration to an embedded position.

15. The method of claim 1 , wherein the tapered mandrel includes a tapered lower section and a straight-sided untapered upper section.

16. A method of forming a stiffened pier comprising in combination the steps of:

(a) forming a cavity in the soil by inserting a tapered probe to displace the soil;

(b) filling the cavity, at least in part, with aggregate or aggregate with cementitious grout while lifting the probe at least partially out of the cavity and discharging the aggregate from the probe; and

(c) re-introducing the probe at least once into the aggregate discharged into the cavity to compact the aggregate and to displace a portion of the aggregate laterally into the adjacent soil to densify the soil, wherein the probe is moved only partially up the cavity length while concurrently discharging aggregate following which the probe is pressed downwardly into the aggregate to compact and displace the aggregate laterally into the adjacent soil and repeating the foregoing procedure at different elevations within the pier being formed until the full length of the pier has been formed.

17. The method of claim 16 , wherein cementitious grout is mixed with the aggregate.

18. The method of claim 16 , including re-introducing the tapered probe at least twice at approximately the same elevation after raising the probe and discharging the aggregate in order to cause greater densification of soil, greater lateral displacement of the aggregate and a larger effective diameter of the pier being formed.

19. A method of forming an aggregate pier comprising the steps of:

(a) driving downwardly into pier site soil a tapered mandrel which tapers inwardly from its upper end to a blunt lower end and having an open lower end initially covered by a sacrificial cap to form a downwardly tapered cavity to a desired depth for said aggregate pier while supporting a sidewall of the cavity;

(b) moving the tapered mandrel upwardly to a top of said cavity so as to separate said sacrificial cap from said open end of the mandrel while delivering loose aggregate through said open end of the mandrel and depositing said delivered aggregate to the cavity so as to support said sidewall below said upwardly moved mandrel;

(c) driving downwardly into said deposited aggregate a tapered mandrel having a blunt lower end surface so that said blunt lower end of the mandrel compacts said deposited aggregate and densifies said soil;

(d) moving said tapered mandrel having the blunt lower end surface upwardly from said compacted aggregate and depositing additional loose aggregate in said cavity; and

(e) repeating said steps (c) and (d) until a pier component of a desired height is formed.

20. The method according to claim 19 , wherein said depth of the pier is approximately 10 to 20 feet.

21. The method according to claim 19 , wherein said step (c) compacts said deposited aggregate to a depth of approximately 5 to 15 feet.

22. The method according to claim 19 , further comprising, after said step (b) of moving the tapered mandrel upwardly to the top of the cavity, a step of affixing the blunt lower end surface to the mandrel.

23. The method according to claim 19 , further comprising, after said step (b) of moving the tapered mandrel upwardly to the top of the cavity, a step of replacing the mandrel having the open lower end with a mandrel having a blunt lower end surface.

24. A method of forming an aggregate pier comprising the steps of:

(a) driving downwardly into pier site soil a tapered mandrel which tapers inwardly from its upper end to a blunt lower end and having an open lower end initially covered by a sacrificial cap to form a downwardly tapered cavity to a desired depth for said aggregate pier while supporting a sidewall of the cavity;

(b) moving the tapered mandrel upwardly to a top of said cavity so as to separate said sacrificial cap from said open end of the mandrel while delivering loose aggregate through said open end of the mandrel and depositing said delivered aggregate to the cavity so as to support said sidewall below said upwardly moved mandrel;

(c) repeating said steps (a) and (b) at a different portion of the pier site so as to form a plurality of said aggregate deposited cavities;

(d) driving downwardly into said aggregate deposited cavity a tapered mandrel having a blunt lower end surface so that said blunt lower end of the mandrel compacts said deposited aggregate and densifies said soil;

(e) moving said tapered mandrel having the blunt lower end surface upwardly from said compacted aggregate and depositing additional loose aggregate in said cavity; and

(f) repeating said steps (d) and (e) at each of said plurality of aggregate deposited cavities until a plurality of pier components of a desired height is formed.

Assignments (22)
RELEASE OF SECURITY INTEREST Recorded Apr 26, 2022
From: WHITEHORSE CAPITAL MANAGEMENT, LLC
To: TENSAR CORPORATION, LLC; TENSAR CORPORATION; TENSAR INTERNATIONAL CORPORATION; GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY, INC.; TENSAR TECHNOLOGIES LIMITED
Reel/Frame 059804/0298 →
RELEASE OF SECURITY INTEREST Recorded Apr 26, 2022
From: ALTER DOMUS (US) LLC
To: TENSAR CORPORATION, LLC; TENSAR CORPORATION; TENSAR INTERNATIONAL CORPORATION; GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY, INC.; TENSAR TECHNOLOGIES LIMITED
Reel/Frame 059804/0380 →
PATENT SECURITY AGREEMENT (SECOND LIEN) Recorded Nov 23, 2020
From: GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY INC.; TENSAR CORPORATION, LLC; TENSAR INTERNATIONAL CORPORATION; TENSAR CORPORATION
To: ALTER DOMUS (US) LLC, AS COLLATERAL AGENT
Reel/Frame 054504/0843 →
RELEASE OF SECURITY INTEREST IN PATENT RIGHTS (FIRST LIEN) Recorded Nov 23, 2020
From: WILMINGTON TRUST, NATIONAL ASSOCIATION
To: GEOPIER FOUNDATION COMPANY, INC.; NORTH AMERICAN GREEN INC.; TENSAR CORPORATION; TENSAR CORPORATION, LLC (FORMERLY KNOWN AS THE TENSAR CORPORATION); TENSAR HOLDINGS, LLC (FORMERLY KNOWN AS TENSAR HOLDINGS CORPORATION); TENSAR INTERNATIONAL CORPORATION; GEOTECHNICAL REINFORCEMENT INC.
Reel/Frame 055354/0098 →
RELEASE OF SECURITY INTEREST IN PATENT RIGHTS (SECOND LIEN) Recorded Nov 23, 2020
From: WILMINGTON TRUST, NATIONAL ASSOCIATION
To: GEOPIER FOUNDATION COMPANY, INC.; NORTH AMERICAN GREEN INC.; TENSAR CORPORATION; TENSAR CORPORATION, LLC (FORMERLY KNOWN AS THE TENSAR CORPORATION); TENSAR HOLDINGS, LLC (FORMERLY KNOWN AS TENSAR HOLDINGS CORPORATION); TENSAR INTERNATIONAL CORPORATION; GEOTECHNICAL REINFORCEMENT INC.
Reel/Frame 055354/0341 →
SECURITY INTEREST Recorded Nov 20, 2020
From: GEOPIER FOUNDATION COMPANY, INC.
To: WHITEHORSE CAPITAL MANAGEMENT, LLC, AS COLLATERAL AGENT
Reel/Frame 054427/0621 →
ASSIGNMENT OF PATENT SECURITY AGREEMENT Recorded Apr 3, 2020
From: UBS AG
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 052311/0566 →
ASSIGNMENT OF PATENT SECURITY AGREEMENT Recorded Apr 3, 2020
From: UBS AG
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 052311/0625 →
SECOND LIEN PATENT SECURITY AGREEMENT Recorded Aug 13, 2014
From: GEOPIER FOUNDATION COMPANY INC.
To: UBS AG, STAMFORD BRANCH
Reel/Frame 033532/0699 →
FIRST LIEN PATENT SECURITY AGREEMENT Recorded Aug 13, 2014
From: GEOPIER FOUNDATION COMPANY INC.
To: UBS AG, STAMFORD BRANCH
Reel/Frame 033532/0807 →
RELEASE OF FIRST LIEN INTELLECTUAL PROPERTY SECURITY AGREEMENT (RELEASES RF 028149/0521) Recorded Aug 7, 2014
From: TCO FUNDING CORP.
To: TENSAR HOLDINGS, LLC; TENSAR CORPORATION; TENSAR CORPORATION, LLC; TENSAR INTERNATIONAL, LLC; TENSAR INTERNATIONAL CORPORATION; TENSAR POLYTECHNOLOGIES, INC.; GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY, INC.; NORTH AMERICAN GREEN, INC.
Reel/Frame 033500/0443 →
RELEASE OF SECOND LIEN INTELLECTUAL PROPERTY SECURITY AGREEMENT (RELEASES RF 025703/0466) Recorded Aug 7, 2014
From: AMERICAN CAPITAL LTD.
To: TCO FUNDING CORP.
Reel/Frame 033500/0499 →
RELEASE OF SECOND LIEN AFTER-ACQUIRED INTELLECTUAL PROPERTY SECURITY AGREEMENT (SECOND SUPPLEMENTAL FILING) (RELEASES RF 025703/0433) Recorded Aug 7, 2014
From: TCO FUNDING CORP.
To: TENSAR CORPORATION, LLC; TENSAR INTERNATIONAL CORPORATION; GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY, INC.
Reel/Frame 033500/0517 →
RELEASE OF COLLATERAL ASSIGNMENT OF INTELLECTUAL PROPERTY SECURITY (RELEASES RF 028177/0029) Recorded Aug 7, 2014
From: GENERAL ELECTRIC CAPITAL CORPORATION
To: TCO FUNDING CORP.
Reel/Frame 033500/0564 →
RELEASE OF SECURITY INTEREST Recorded May 8, 2012
From: CREDIT SUISSE AG, CAYMAN ISLANDS BRANCH
To: TENSAR HOLDINGS, LLC; TENSAR CORPORATION; TENSAR CORPORATION, LLC; TENSAR INTERNATIONAL CORPORATION; TENSAR POLYTECHNOLOGIES, INC.; GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY, INC.; NORTH AMERICAN GREEN, INC.
Reel/Frame 028173/0228 →
COLLATERAL ASSIGNMENT OF INTELLECTUAL PROPERTY SECURITY RECORDED AT REEL/FRAME 028149/0521 Recorded May 8, 2012
From: TCO FUNDING CORP.
To: GENERAL ELECTRIC CAPITAL CORPORATION, AS ADMINISTRATIVE AGENT AND COLLATERAL AGENT
Reel/Frame 028177/0029 →
FIRST LIEN INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded May 3, 2012
From: TENSAR HOLDINGS, LLC; TENSAR CORPORATION; TENSAR CORPORATION, LLC; TENSAR INTERNATIONAL, LLC; TENSAR INTERNATIONAL CORPORATION; TENSAR POLYTECHNOLOGIES, INC.; GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY, INC.; NORTH AMERICAN GREEN, INC.
To: TCO FUNDING CORP.
Reel/Frame 028149/0521 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 24, 2011
From: WISSMANN, KORD J.; MOXHAY, ALAN L.; FOX, NATHANIEL S.
To: GEOPIER FOUNDATION COMPANY, INC.
Reel/Frame 025857/0961 →
SECOND LIEN AFTER-ACQUIRED INTELLECTUAL PROPERTY SECURITY AGREEMENT (SECOND SUPPLEMENTAL FILING) Recorded Jan 26, 2011
From: TENSAR CORPORATION, LLC; TENSAR INTERNATIONAL CORPORATION; GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY, INC.
To: TCO FUNDING CORP.
Reel/Frame 025703/0433 →
SECOND LIEN COLLATERAL ASSIGNMENT OF INTELLECTUAL PROPERTY SECURITY Recorded Jan 26, 2011
From: TCO FUNDING CORP.
To: AMERICAN CAPITAL, LTD.
Reel/Frame 025703/0466 →
ASSIGNMENT OF SECURITY INTEREST RECORDED AT REEL/FRAME 025609/0407 Recorded Jan 11, 2011
From: TCO FUNDING CORP.
To: CREDIT SUISSE AG, CAYMAN ISLANDS BRANCH
Reel/Frame 025619/0626 →
SECURITY AGREEMENT Recorded Jan 10, 2011
From: TENSAR CORPORATION, LLC; TENSAR INTERNATIONAL CORPORATION; GEOCOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY, INC.
To: TCO FUNDING CORP.
Reel/Frame 025609/0407 →
Continuity (4)
Continuation In Part 11101599 · Apr 8, 2005
Provisional Application 60622363 · Oct 27, 2004
Provisional Application 60623350 · Oct 29, 2004
Related Publication 20080031694A1 · Feb 7, 2008