IP Library Granted Patent US 7,992,280
Granted Patent B2
US 7,992,280 · App. 11/970,064 · Granted Aug 9, 2011

Method of casting metal anti-shift collars for stabilizer bar

Assignee: MSSC US
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,992,280
App. No.
11/970,064
Granted
Aug 9, 2011
Kind
B2
Abstract

A method of processing a stabilizer bar assembly includes casting a metal anti-shift collar onto a prefabricated stabilizer bar. The metal anti-shift collar may be a zinc alloy, an aluminum alloy, or a magnesium alloy, for example.

Claims (14)

1. A method of processing a stabilizer bar assembly, comprising:

casting a first metal anti-shift collar onto a prefabricated stabilizer bar, wherein the first metal anti-shift collar has a uniform diameter between terminal ends and includes a first collar surface for contacting a first bushing; and

casting a second metal anti-shift collar having a second collar surface for contacting the first bushing onto the prefabricated stabilizer bar.

2. The method as recited in claim 1 , including casting a zinc alloy as the first and second metal anti-shift collar.

3. The method as recited in claim 1 , including casting an aluminum alloy as the first and second metal anti-shift collar.

4. The method as recited in claim 1 , including casting a magnesium alloy as the first and second metal anti-shift collar.

5. The method as recited in claim 1 , including casting the first and second metal anti-shift collar in an annular shape.

6. The method as recited in claim 1 , including casting the first and second metal anti-shift collar onto a painted surface of the prefabricated stabilizer bar.

7. The method as recited in claim 1 , wherein the casting includes injecting molten metal into a cavity having a shape corresponding to at least one the metal anti-shift collars, solidifying the molten metal into at least one the metal anti-shift collars, and cooling the at least one metal anti-shift collar to cause shrinkage of the at least one metal anti-shift collar around the prefabricated stabilizer bar.

8. The method as recited in claim 1 , wherein the casting includes locating a section of the prefabricated stabilizer bar in a casting die having a cavity with a shape that corresponds to at least one of the metal anti-shift collars, closing the casting die around the section of the prefabricated stabilizer bar, and injecting a molten metal into the cavity.

9. The method as recited in claim 1 , wherein the terminal ends of the metal first anti-shift collar are axially opposing.

10. A method of processing a stabilizer bar assembly, comprising:

casting a first metal anti-shift collar and a second metal anti-shift collar onto a stabilizer bar, wherein the first metal anti-shift collar includes a first collar surface oriented to contact a first bushing and the second metal anti-shift collar includes a second collar surface oriented for contacting the first bushing.

11. The method as recited in claim 10 , wherein the first metal anti-shift collar is symmetric about a plane perpendicular to an axis of the stabilizer bar.

Assignments (2)
CHANGE OF NAME Recorded Mar 30, 2011
From: MERITOR SUSPENSION SYSTEMS COMPANY, U.S.
To: MSSC US
Reel/Frame 026047/0448 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 7, 2008
From: FADER, JOSEPH A.; MEDEIROS, LEO
To: MERITOR SUSPENSION SYSTEMS COMPANY, U.S.
Reel/Frame 020324/0660 →
Continuity (1)
Related Publication 20090174165A1 · Jul 9, 2009