IP Library Granted Patent US 8,187,869
Granted Patent B2
US 8,187,869 · App. 12/126,708 · Granted May 29, 2012

Biogas installation for production of biogas from biomass, and methods for operation of the biogas installation

Assignee: Bekon Energy Technologies GmbH & Co., KG
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,187,869
App. No.
12/126,708
Granted
May 29, 2012
Kind
B2
Abstract

A biogas installation for production of biogas from biomass and methods for starting and shutting down a fermenter are disclosed. When biomass in a fermenter is used up, biogas production must stop, the fermented biomass removed, and the fermenter filled with fresh biomass. Biogas production and utilisation is maintained for as long as possible. When the methane concentration in the biogas outlet falls below an upper limit, the biogas line is disconnected. The biogas/off-gas mixture is fed out via an exhaust chimney until the methane concentration has fallen to a lower limit. The fermenter to be shut down is purged with fresh air, and the off-gas/biogas/fresh air mixture is fed out via the exhaust chimney until the carbon-dioxide concentration in the off-gas/biogas/fresh air mixture has fallen to a first limit. The fermenter is then opened to unload the consumed biomass and load fresh biomass.

Claims (20)

1. Biogas installation for production of biogas having

at least one fermenter which operates on the principle of dry fermentation for production of biogas in the batch mode with a biogas outlet and a purging gas inlet;

a biogas line that can be connected to the biogas outlet;

an off-gas line by means of which off-gas containing carbon dioxide can be supplied to the purging gas inlet;

an off-gas chimney which can be connected to the biogas outlet via a first biogas/off-gas line;

an off-gas flare which can be connected via a second biogas/off-gas line to the biogas outlet;

a fresh air line which can be connected to the purging gas inlet;

a control device configured to

connect the biogas outlet to the biogas line or to the bio off-gas chimney via the first biogas/off-gas line or to the off-gas flare via the second biogas/off-gas line,

connect the purging gas inlet to the off-gas line upon starting or shutting down the fermenter, and

connect the purging gas inlet to the fresh air line upon shutting down the fermenter; and

a measurement device which is connected to the control device and has a first measurement sensor for detection of the methane concentration and a second measurement sensor for detection of the carbon-dioxide concentration in the gas mixture emerging from the at least one fermenter.

2. Biogas installation according to claim 1 , characterised in that the measurement device is arranged in the biogas outlet.

3. Biogas installation according to claim 1 , characterised in that a plurality of fermenters are provided, whose biogas outlets open into the common biogas line, and in that the first measurement sensor for detection of the methane concentration is arranged in the common biogas line.

4. Biogas installation according to claim 3 , characterised in that the biogas outlets can be connected selectively via a common biogas/off-gas line to the off-gas chimney or to the off-gas flare, and in that the second measurement sensor for detection of the carbon-dioxide concentration is arranged in the common biogas/off-gas line.

5. Biogas installation according to claim 1 , characterised in that the off-gas line supplies exhaust gas from an internal combustion engine.

6. Biogas installation according to claim 1 , characterised in that the biogas line connects to a biogas utilisation device which produces off-gas containing carbon dioxide.

7. Biogas installation according to claim 6 , characterised in that the biogas utilisation device comprises a cogeneration system.

8. Biogas installation according to claim 6 , characterised in that the biogas utilisation device comprises a fuel cell.

9. Biogas installation according to claim 6 , characterised in that the biogas utilisation device comprises a gas processing device.

Assignments (3)
CHANGE OF NAME Recorded Sep 25, 2017
From: BEKON HOLDING AG
To: BEKON GMBH
Reel/Frame 044001/0984 →
MERGER AND CHANGE OF NAME Recorded Sep 25, 2017
From: BEKON ENERGY TECHNOLOGIES GMBH & CO. KG; BEKON HOLDING AG
To: BEKON HOLDING AG
Reel/Frame 044039/0293 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 18, 2008
From: LUTZ, PETER
To: BEKON ENERGY TECHNOLOGIES GMBH & CO. KG
Reel/Frame 021116/0688 →
Priority Claims (1)
DE 10 2007 024 911 · May 29, 2007 · national
Continuity (1)
Related Publication 20080299634A1 · Dec 4, 2008