IP Library Granted Patent US 8,117,748
Granted Patent B2
US 8,117,748 · App. 12/248,108 · Granted Feb 21, 2012

Ballize in tension camshaft assembly process

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,117,748
App. No.
12/248,108
Granted
Feb 21, 2012
Kind
B2
Abstract

A method may include locating first and second lobe members of a camshaft on a first shaft. The first shaft may include an annular wall defining a bore. The first lobe member may be located on a first portion of the first shaft and may define a first end of the camshaft. The second lobe member may be located on a second portion of the first shaft and may define a second end of the camshaft. The first shaft may be fixed from axial displacement and a tool may be displaced through the bore of the first shaft to fix the first lobe member to the first shaft. The fixing may include the first shaft being free from axial restraint in a first axial direction extending from the first portion of the first shaft to the second portion of the first shaft.

Claims (25)

1. A method comprising:

locating a first lobe member of a camshaft on a first shaft having an annular wall defining a bore, the first lobe member being located on a first portion of the first shaft and defining a first end of the camshaft;

locating a second lobe member on a second portion of the first shaft, the second lobe member defining a second end of the camshaft;

fixing the first shaft from axial displacement, the fixing including the first shaft being free from axial restraint in a first axial direction extending from the first portion of the first shaft to the second portion of the first shaft; and

displacing a tool through the bore of the first shaft from the first portion of the first shaft to the second portion of the first shaft to fix the first lobe member to the first shaft, the tool including an outer radial surface engaged with an inner radial surface of the bore, the tool applying an outward radial force to the inner radial surface of the bore and displacing the annular wall into engagement with the first lobe member as the tool is displaced through the bore, the entirety of the first shaft located axially outward from the first portion toward the second portion being free from axial restraint during the displacing.

2. The method of claim 1 , wherein the first shaft is continuously in axial tension along a length of the shaft during the displacing, the first shaft being in axial tension from the first portion to a location of the tool within the shaft during the displacing.

3. The method of claim 1 , wherein the material forming the first shaft is continuously forced axially outward in the first axial direction during the displacing.

4. The method of claim 1 , wherein an axial force applied to the first shaft by the tool is in a single direction during the displacing.

5. The method of claim 1 , wherein the first shaft includes an end portion extending axially outward from the first lobe member in a second axial direction opposite the first axial direction, the fixing including fixing the first shaft from axial displacement at the end portion.

6. The method of claim 5 , wherein the fixing includes supporting the end portion of the first shaft in a bore of a fixture and securing a stop member to the end portion of the first shaft, the fixture being located axially between the stop member and the first lobe member, the stop member abutting the fixture and preventing axial displacement of the first shaft relative to the fixture during the displacing.

7. The method of claim 5 , wherein an outer surface of the end portion of the first shaft includes a threading, the fixing including threading the end portion into a threaded bore of a fixture to axially secure the first shaft relative to the fixture.

8. The method of claim 5 , further comprising removing the end portion from the first shaft after the displacing.

9. The method of claim 1 , wherein the displacing the tool includes forcing a spherical member through the bore.

10. The method of claim 1 , further comprising locating a third lobe member on the first shaft, locating a second shaft within the bore of first shaft and fixing the third lobe member for rotation with the second shaft, the third lobe member being rotatable on the first shaft and the second shaft being rotatable within the first shaft.

11. A method comprising:

locating a series of lobe members of a camshaft on a first shaft having an annular wall defining a bore, a first of the lobe members being located on a first portion of the first shaft and defining a first end of the camshaft, a remainder of the lobe members being located on the first shaft in a first axial direction outward from the first lobe member, the first shaft including an end portion extending outward from the first lobe member in a second axial direction opposite the first axial direction;

fixing the end portion of first shaft to a fixture, the fixing limiting axial displacement between the first shaft and the fixture, the fixing including the first shaft being free from axial restraint in the first axial direction; and

displacing a tool through the bore of the first shaft in the first axial direction to fix at least one of the lobe members to the first shaft, the tool including an outer radial surface engaged with an inner radial surface of the bore, the tool applying an outward radial force to the inner radial surface of the bore and displacing the annular wall into engagement with at least one of the lobe members as the tool is displaced through the bore, an entirety of the first shaft located axially outward from the first portion in the first axial direction being free from axial restraint during the displacing.

12. The method of claim 11 , wherein the fixing includes supporting the end portion of the first shaft in a bore of the fixture and securing a stop member to the end portion of the first shaft, the fixture being located axially between the stop member and the first lobe member, the stop member abutting the fixture and preventing axial displacement of the first shaft relative to the fixture during the displacing.

13. The method of claim 11 , wherein an outer surface of the end portion of the first shaft includes a threading and the fixture includes a bore having a threading, the fixing including threading the end portion of the first shaft into the bore of the fixture to axially secure the first shaft relative to the fixture.

14. The method of claim 11 , further comprising removing the end portion from the first shaft after the displacing.

15. The method of claim 11 , wherein the first shaft is continuously in axial tension along a length of the shaft including an axially outward extent of the shaft from the first portion in the first axial direction during the displacing, the first shaft being in axial tension from the first portion to a location of the tool within the shaft during the displacing.

16. The method of claim 11 , wherein the material forming the first shaft is continuously forced axially outward during the displacing.

17. The method of claim 11 , wherein the displacing the tool includes forcing a spherical member through the bore.

18. The method of claim 11 , further comprising locating an additional series of lobe members on the first shaft, locating a second shaft within the bore of first shaft and fixing the additional series of lobe members for rotation with the second shaft, the additional series of lobe members being rotatable on the first shaft and the second shaft being rotatable within the first shaft.

Assignments (12)
RELEASE OF SECURITY INTEREST Recorded Nov 7, 2014
From: WILMINGTON TRUST COMPANY
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 034384/0758 →
CHANGE OF NAME Recorded Feb 10, 2011
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 025781/0245 →
SECURITY AGREEMENT Recorded Nov 8, 2010
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: WILMINGTON TRUST COMPANY
Reel/Frame 025324/0515 →
RELEASE OF SECURITY INTEREST Recorded Nov 5, 2010
From: UAW RETIREE MEDICAL BENEFITS TRUST
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025315/0046 →
RELEASE OF SECURITY INTEREST Recorded Nov 4, 2010
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025245/0909 →
SECURITY AGREEMENT Recorded Aug 28, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UAW RETIREE MEDICAL BENEFITS TRUST
Reel/Frame 023162/0237 →
SECURITY AGREEMENT Recorded Aug 27, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 023156/0313 →
RELEASE OF SECURITY INTEREST Recorded Aug 21, 2009
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023126/0914 →
RELEASE OF SECURITY INTEREST Recorded Aug 21, 2009
From: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023155/0769 →
SECURITY AGREEMENT Recorded Apr 16, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
Reel/Frame 022554/0538 →
SECURITY AGREEMENT Recorded Feb 3, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 022201/0363 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 9, 2008
From: CLEVER, GLENN E.; FAWCETT, JAMES
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 021653/0094 →