IP Library Granted Patent US 7,918,379
Granted Patent B2
US 7,918,379 · App. 12/282,510 · Granted Apr 5, 2011

Process for working metal material and structures

Assignees: Osaka University; Osaka Municipal Technical Research Institute; Tokyu Car Corporation
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,918,379
App. No.
12/282,510
Granted
Apr 5, 2011
Kind
B2
Abstract

In a first step, friction stir welding is performed, while supplying a filler into a joining portion, in order to prevent the coarsening of crystal grains of metal materials in a subsequent fusion processing. Then, a fusion processing such as MIG welding is performed. The filler to be added to the joining portion includes a substance that does not chemically react with the metal materials and has a melting point higher than a melting point of the metal materials and a substance in which a misfit with the metal materials is within ±15%. As a result, the coarsening of crystal grains by the fusion processing is inhibited and the joint strength can be increased.

Claims (29)

1. A method for processing metal materials, comprising:

a first step of disposing two metal materials opposite each other in a joining portion, inserting a rod-shaped rotary tool into the joining portion, rotating the rotary tool, and joining the two metal materials, while supplying into the joining portion a filler that does not chemically react with the metal materials and has a melting point higher than a melting point of the metal materials; and

a second step of further performing a fusion processing in the joining portion, wherein the filler supplied in the first step is dispersed during the fusion processing.

2. A method for processing metal materials, comprising:

a first step of disposing two metal materials opposite each other in a joining portion, inserting a rod-shaped rotary tool into the joining portion, rotating the rotary tool, and joining the two metal materials, while supplying into the joining portion a filler in which either an integer multiple or 1/integer multiple of a length (a′) of a crystal edge of a unit crystal lattice is within ±15% a length (a) of a crystal edge of a unit crystal lattice of the metal materials; and

a second step of further performing a fusion processing in the joining portion, wherein the filler supplied in the first step is dispersed during the fusion processing.

3. A method for processing metal materials, comprising:

a first step of disposing two metal materials opposite each other in a joining portion, inserting a rod-shaped rotary tool into the joining portion, rotating the rotary tool, and joining the two metal materials, while supplying into the joining portion a filler that does not chemically react with the metal materials and has a melting point higher than a melting point of the metal materials and a filler in which either an integer multiple or 1/integer multiple of a length (a′) of a crystal edge of a unit crystal lattice is within ±15% a length (a) of a crystal edge of a unit crystal lattice of the metal materials; and

a second step of further performing a fusion processing in the joining portion, wherein the filler supplied in the first step is dispersed during the fusion processing.

4. The method for processing metal materials according to claim 1 , wherein, in the first step, the rotary tool is moved, while being rotated, along a longitudinal direction of the joining portion and the two metal materials are joined.

5. The method for processing metal materials according to claim 1 , wherein, in the first step, the supply of the filler into the joining portion is performed by placing the filler in the joining portion prior to inserting the rotary tool into the joining portion.

6. The method for processing metal materials according to claim 2 , wherein, in the first step, the supply of the filler into the joining portion is performed by ejecting the filler to a location of a moving destination of the rotary tool in the joining portion, as the rotary tool moves.

7. The method for processing metal materials according to claim 6 , wherein, in the first step, the joining portion is processed into a groove that is opened in a direction facing the rotary tool before the rotary tool is moved in the joining portion.

8. The method for processing metal materials according to claim 1 , wherein, in the first step, the supply of the filler into the joining portion is performed by ejecting the filler into the joining portion from inside the rotary tool.

9. The method for processing metal materials according to claim 1 , wherein, in the first step, the supply of the filler into the joining portion is performed by introducing the filler in advance into a material of the rotary tool and rotating the rotary tool, thereby supplying the filler into the joining portion as the rotary tool wears down.

10. A structure formed by processing two or more metal materials by a first step of disposing two metal materials opposite each other in a joining portion, inserting a rod-shaped rotary tool into the joining portion, rotating the rotary tool, and joining the two metal materials, while supplying into the joining portion a filler that does not chemically react with the metal materials and has a melting point higher than a melting point of the metal materials; and

a second step of further performing a fusion processing in the joining portion, wherein the filler supplied in the first step is dispersed during the fusion processing.

11. The method for processing metal materials according to any claim 2 , wherein, in the first step, the rotary tool is moved, while being rotated, along a longitudinal direction of the joining portion and the two metal materials are joined.

12. The method for processing metal materials according to claim 2 , wherein, in the first step, the supply of the filler into the joining portion is performed by placing the filler in the joining portion prior to inserting the rotary tool into the joining portion.

13. The method for processing metal materials according to claim 2 , wherein, in the first step, the supply of the filler into the joining portion is performed by ejecting the filler into the joining portion from inside the rotary tool.

14. The method for processing metal materials according to claim 2 , wherein, in the first step, the supply of the filler into the joining portion is performed by introducing the filler in advance into a material of the rotary tool and rotating the rotary tool, thereby supplying the filler into the joining portion as the rotary tool wears down.

15. The method for processing metal materials according to claim 3 , wherein, in the first step, the rotary tool is moved, while being rotated, along a longitudinal direction of the joining portion and the two metal materials are joined.

16. The method for processing metal materials according to claim 3 , wherein, in the first step, the supply of the filler into the joining portion is performed by placing the filler in the joining portion prior to inserting the rotary tool into the joining portion.

17. The method for processing metal materials according to claim 3 , wherein, in the first step, the supply of the filler into the joining portion is performed by ejecting the filler to a location of a moving destination of the rotary tool in the joining portion, as the rotary tool moves.

18. The method for processing metal materials according to claim 17 , wherein, in the first step, the joining portion is processed into a groove that is opened in a direction facing the rotary tool before the rotary tool is moved in the joining portion.

19. The method for processing metal materials according to claim 3 , wherein, in the first step, the supply of the filler into the joining portion is performed by ejecting the filler into the joining portion from inside the rotary tool.

20. The method for processing metal materials according to claim 3 , wherein, in the first step, the supply of the filler into the joining portion is performed by introducing the filler in advance into a material of the rotary tool and rotating the rotary tool, thereby supplying the filler into the joining portion as the rotary tool wears down.

21. The method for processing metal materials according to claim 8 , wherein the ejected filler is supplied via a channel provided inside the rotary tool.

22. The method for processing metal materials according to claim 9 , wherein the rotary tool is composed of porous TiC.

Assignments (4)
CORRECTIVE ASSIGNMENT TO CORRECT THE APPLICATION NUMBER 12058681 PREVIOUSLY RECORDED AT REEL: 044794 FRAME: 0113. ASSIGNOR(S) HEREBY CONFIRMS THE MERGER. Recorded Mar 28, 2018
From: OSAKA MUNICIPAL TECHNICAL RESEARCH INSTITUTE
To: OSAKA RESEARCH INSTITUTE OF INDUSTRIAL SCIENCE AND TECHNOLOGY
Reel/Frame 045738/0075 →
MERGER Recorded Feb 1, 2018
From: OSAKA MUNICIPAL TECHNICAL RESEARCH INSTITUTE
To: OSAKA RESEARCH INSTITUTE OF INDUSTRIAL SCIENCE AND TECHNOLOGY
Reel/Frame 044794/0113 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 3, 2012
From: TOKYU CAR CORPORATION
To: JAPAN TRANSPORT ENGINEERING COMPANY
Reel/Frame 029391/0274 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 10, 2008
From: FUKUSUMI, MASAO; MORISADA, YOSHIAKI; ISHIKAWA, TAKESHI; FUJII, HIDETOSHI
To: OSAKA UNIVERSITY; OSAKA MUNICIPAL TECHNICAL RESEARCH INSTITUTE; TOKYU CAR CORPORATION
Reel/Frame 021510/0529 →
Priority Claims (1)
JP 2006-066456 · Mar 10, 2006 · national
Continuity (1)
Related Publication 20090068492A1 · Mar 12, 2009