IP Library Granted Patent US 7,785,036
Granted Patent B2
US 7,785,036 · App. 12/331,585 · Granted Aug 31, 2010

Installation method for a preventative booming for oil containment boom with a spiral configuration

Assignee: Oceanpact Servicos Maritimos Ltda.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,785,036
App. No.
12/331,585
Granted
Aug 31, 2010
Kind
B2
Abstract

The present invention refers to an installation method for a preventive booming for pollution containment in aquatic environments, such as rivers, lakes, lagoons, bays, or ocean, more specifically for the pollution caused by oil spills. It comprises a plurality of containment boom sections that form a preventive booming in a spiral configuration, allowing the transit of supply and service boats. The preventative booming does not impair the ordinary operation of a platform or offshore installation at the same time that it prevents the immediate exit of the supernatant oil.

Claims (5)

1. A method for installation of a preventive booming, in which the preventive booming is in a fixed position and comprises a plurality of containment boom sections, said method comprising:

connecting boom sections to each other through their connection points, wherein the connection points each comprise one or more floaters or buoys, and wherein at least some of the connection points are attached to at least two anchors or grapnels on the seabed, at least one anchor or grapnel being located inside the containment area defined by the containment boom sections and at least one anchor or grapnel being located outside the containment area defined by the containment boom sections, wherein the preventive booming has a spiral configuration with an opening for entrance and exit of vessels.

2. The method according to claim 1 , wherein the opening of the preventive booming for the entrance and exit of vessels is at least ten times the breadth of the largest vessel that will transit.

3. The method according to claim 1 , wherein the opening of the preventive booming for the entrance and exit of vessels is at least twice the length of the largest vessel that will transit.

4. The method according to claim 1 , wherein the distance between a platform or offshore installation and the containment boom is at least five times the length of the largest vessel that will operate inside the preventive booming in at least 180° from the opening.

Assignments (2)
CHANGE OF NAME Recorded Oct 20, 2017
From: OCEANPACT SERVIÇOS MARÍTIMOS LTDA
To: OCEANPACT SERVIÇOS MARÍTIMOS S.A.
Reel/Frame 044715/0954 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 15, 2010
From: PINHEIRO DE ANDRADE, FLAVIO N
To: OCEANPACT SERVICOS MARITIMOS LTDA.
Reel/Frame 024690/0353 →
Priority Claims (1)
BR 0705792 · Dec 10, 2007 · national
Continuity (1)
Related Publication 20090145854A1 · Jun 11, 2009