IP Library Granted Patent US 8,508,081
Granted Patent B2
US 8,508,081 · App. 12/379,729 · Granted Aug 13, 2013

Live conductor stringing and splicing method and apparatus

Inventors: Clifford William Devine (Oliver, CA); Daniel Neil O'Connell (Oliver, CA)
Assignee: Quanta Associates, L.P.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,508,081
App. No.
12/379,729
Granted
Aug 13, 2013
Kind
B2
Abstract

A method and apparatus for handling and/or stringing energized conductor for a high voltage power line conductor for a high voltage power line is provided. The method includes bringing components and workers to the same electrical potential and transferring power from one contractor to another. Associated apparatus is also described.

Claims (30)

1. Method of installing a conductor along a power transmission system ( 100 ), wherein the system ( 100 ) carries power at least at 44 kV, without interrupting delivery of downstream power, comprising the following stringing steps:

moving an energized first conductor ( 180 ) to a temporary position; stringing a second conductor ( 184 ) in a position formerly occupied by the first conductor ( 180 ) while the first conductor ( 180 ) is energized wherein said second conductor is at all times treated as an energized conductor in accordance with the further stringing steps setout below due to induced current in said second conductor; and transferring a power load carried by the first conductor ( 180 ) to the second conductor ( 184 ),

wherein said stringing steps further include the steps of:

a) providing a pulling line having at least a non-conductive end,

b) connecting said non-conductive end of said pulling line to a leading end of said second conductor,

c) providing first and second equal potential zones at opposite ends of a stringing path where along said second conductor is to be strung, wherein said first and second equal potential zones are grounded to their respective first and second adjacent areas of earth,

d) electrically connecting said pulling line to said first equal potential zone, electrically connecting said second conductor to said second equal potential zone, and connecting said non-conductive end of said pulling line to said second conductor,

e) electrically connecting first pulling equipment at said first-equal potential zone to said first equal potential zone and electrically connecting pay-out equipment at said second equal potential zone to said second equal potential zone,

f) pulling said pulling line along said stringing path using said pulling and payout equipment so as to pull said pulling line into said first equal potential zone while paying-out said second conductor,

whereby said first conductor is replaced with said second conductor without interrupting said power load and without risk of a ground circulating current electrically connecting between first and second equal potential zones.

2. The method of claim 1 , further comprising removing the first conductor ( 180 ).

3. The method of claim 2 , further comprising constructing a temporary position supported by temporary support structure ( 112 ).

4. The method of claim 3 , further comprising removing the temporary support structure ( 112 ) once the power load is transferred to the second conductor ( 184 ) and the first conductor ( 180 ) has been removed.

5. The method of claim 1 , further comprising repeating the method for another conductor ( 180 ) carrying a load having a different phase (A, B, C) in a power system ( 100 ).

6. The method of claim 1 , further comprising attaching a first long jumper ( 182 ) between the first conductor ( 180 ) and a third conductor ( 102 ) connected to an energy source and attaching a second long jumper ( 182 ) between the first conductor ( 180 ) and a fourth conductor ( 102 ) connected to a load before moving the first conductor ( 180 ) to the temporary position and further wherein the first and second long jumpers ( 182 ) are long enough to permit the first conductor ( 180 ) to be moved from its original position to the temporary position.

7. The method of claim 1 , including using a transfer buss ( 118 ) to transfer the power load carried by the first conductor ( 180 ) to the second conductor ( 184 ).

8. The method of claim 7 , wherein the transfer buss ( 118 ) includes at least one of an air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ).

9. The method of claim 8 , further comprising connecting the transfer buss ( 110 ) to a third conductor ( 102 ) connected to an energy source and the second conductor ( 184 ) when the at least one of an air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ) is in an open position.

10. The method of claim 9 , further comprising connecting a second transfer buss ( 118 ) to a fourth conductor ( 102 ) connected to a load and the second conductor ( 184 ) when a second at least one of an air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ) is in an open position.

11. The method of claim 10 , further comprising closing the at least one of an air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ) and the second at least one of an air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ).

12. The method of claim 11 , further comprising isolating the first conductor ( 180 ).

13. The method of claim 12 , wherein isolating the first conductor ( 180 )+comprises: attaching one end of a transfer buss ( 118 ) having at least one an air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ) to the first conductor ( 180 ) when the at least one of the air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ) are in an open position; attaching a second end of the transfer buss ( 118 ) to the fourth conductor ( 102 ) when the at least one of the air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ) are in an open position; closing the at least one of the air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ); removing a jumper ( 182 ) connecting the first conductor ( 180 ) to the fourth conductor ( 102 ); and opening the at least one of the air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ) thereby causing current to no longer flow in the first conductors ( 180 ).

14. The method of claim 13 , further comprising:

attaching one end of a transfer buss ( 118 ) having at least one an air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ) to the first conductor ( 180 ) when the at least one of the air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ) are in an open position;

attaching a second end of the transfer buss ( 118 ) to the third conductor ( 102 ) when the at least one of the air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ) are in an open position;

closing the at least one of the air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 );

removing a jumper ( 182 ) connecting the first conductor ( 180 ) to the third conductor ( 102 ); and

opening the at least one of the air break switch ( 140 ), a hot stick installed jumper, and a circuit breaker ( 142 ) thereby causing the first conductor ( 180 ) to be de-energized and isolated.

15. The method of claim 14 , farther comprising removing the transfer busses ( 118 ).

16. The method of claim 14 , further comprising repeating the method for conductors ( 180 ) of other phases (A, B, C) in a system ( 100 ).

Assignments (4)
TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENTS Recorded Oct 15, 2020
From: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
To: QUANTA ASSOCIATES, L.P.
Reel/Frame 054085/0516 →
NUNC PRO TUNC ASSIGNMENT Recorded Aug 30, 2011
From: DEVINE, CLIFFORD W.; O'CONNELL, DANIEL N.
To: QUANTA SERVICES OF CANADA LTD.
Reel/Frame 026831/0215 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 30, 2011
From: QUANTA SERVICES OF CANADA LTD.
To: QUANTA ASSOCIATES L.P.
Reel/Frame 026831/0599 →
NOTICE OF GRANT OF SECURITY INTEREST IN PATENTS Recorded Aug 3, 2011
From: QUANTA ASSOCIATES, L.P.
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 026691/0789 →
Continuity (3)
Continuation In Part 10927467 · Aug 27, 2004
Provisional Application 60498707 · Aug 29, 2003
Related Publication 20090195083A1 · Aug 6, 2009