IP Library › Granted Patent US 8,789,587
Granted Patent B2
US 8,789,587 · App. 12/394,395 · Granted Jul 29, 2014

Monitoring of downhole parameters and tools utilizing fiber optics

Inventors: Paulo Tubel (The Woodlands, TX); Brian Bidigare (Kingwood, TX); Michael Johnson (Flower Mound, TX); John Harrell (Waxahachie, TX); Benn Voll (Houston, TX)
Assignee: Baker Hughes Incorporated
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,789,587
App. No.
12/394,395
Granted
Jul 29, 2014
Kind
B2
Abstract

A method and system for monitoring and controlling an injection operation is disclosed. A plurality of distributed fiber optic sensors is located in a production well. Fluid is injected into an injection well spaced apart from the production well. A parameter of a formation between the production well and the injection well is determined from measurements from the formation obtained using the fiber optic sensors. At least one of an injection of fluid into the injection well and a flow into the production well is controlled in response to the determined parameter.

Claims (23)

1. A method of monitoring and controlling an injection operation, comprising:

locating in a production well a plurality of distributed fiber optic sensors;

injecting a fluid in an injection well formed spaced apart from the production well;

determining a parameter of the formation between the production well and the injection well from a measurement of an acoustic signal generated in the formation obtained using the fiber optic sensors; and

controlling a flow of fluid into the production well in response to the parameter determined from the measurement of the acoustic signal generated in the formation.

2. The method of claim 1 wherein the fiber optic sensors comprise strain sensors and the determined parameter comprises a depletion of hydrocarbons.

3. The method of claim 2 further comprising estimating a stress distribution at the production well.

4. The method of claim 1 wherein the fiber optic sensors comprise acoustic sensors and the determined parameter comprises at least one of; (i) a seismic map, (ii) an extent of fracturing of the formation, and (iii) a sealing character of a fault.

5. The method of claim 4 further comprising using a seismic source at a surface location to generate acoustic waves in the formation.

6. The method of claim 4 further comprising using a seismic source in the injection well to generate an acoustic wave in the formation.

7. The method of claim 1 further comprising using a flow controller for controlling at least one of: (i) the injection of fluid, and (ii) the flow into the production well.

8. A system configured to monitor and control an injection operation, the system comprising:

an injection well spaced apart from a production well, the injection well configured to have a device for injecting a fluid into the formation;

a plurality of fiber optic sensors disposed in a production well, the fiber optic sensors configured to measure an acoustic signal generated in the formation in response to the injection of the fluid; and

at least one processor configured to:

(i) determine from the measured acoustic signal a parameter of the formation between the production well and the injection well; and

(ii) control a flow into the production well in response to the parameter determined from the measured acoustic signal.

9. The system of claim 8 wherein the fiber optic sensors comprise strain sensors and the parameter determined by the at least one processor further comprises a depletion of hydrocarbons.

10. The system of claim 8 wherein the at least one processor is further configured to estimate a stress distribution at the production well.

11. The system of claim 8 wherein the fiber optic sensors comprise acoustic sensors and the parameter determined by the at least one processor further comprises at least one of: (i) a seismic map, (ii) an extent of fracturing of the formation, and (iii) a sealing character of a fault.

12. The system of claim 11 further comprising a seismic source at a surface location configured to generate acoustic waves in the formation.

13. The system of claim 11 further comprising a seismic source in the injection well configured to generate an acoustic wave in the formation.

14. The system of claim 8 further comprising a flow controller configured to control at least one of: (i) the injection of fluid, and (ii) the flow into the production well.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 27, 2009
From: TUBEL, PAULO; BIDIGARE, BRIAN; JOHNSON, MICHAEL; HARRELL, JOHN; VOLL, BENN
To: BAKER HUGHES INCORPORATED
Reel/Frame 022323/0078 →
Continuity (11)
Division 10447855 · May 29, 2003
Division 09872591 · Jun 1, 2001
Division 09070953 · May 1, 1998
Division 09070953 · May 1, 1998
Provisional Application 60045354 · May 2, 1997
Provisional Application 60048989 · Jun 9, 1997
Provisional Application 60052042 · Jul 9, 1997
Provisional Application 60062953 · Oct 10, 1997
Provisional Application 60073425 · Feb 2, 1998
Provisional Application 60079446 · Mar 26, 1998
Related Publication 20090188665A1 · Jul 30, 2009