IP Library Granted Patent US 8,430,161
Granted Patent B2
US 8,430,161 · App. 12/468,181 · Granted Apr 30, 2013

Mitigation of elemental sulfur deposition during production of hydrocarbon gases

Inventors: Derry Eddy (Calgary, CA); Kean Zemlak (Calgary, CA)
Assignee: BP Corporation North America Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,430,161
App. No.
12/468,181
Granted
Apr 30, 2013
Kind
B2
Abstract

Methods of producing a sour hydrocarbon gas via production tubing intersecting a reservoir, are described, one method including contacting an underground reservoir with an aqueous composition optionally comprising an additive, the reservoir comprising hydrocarbons and sulfur compounds; displacing the composition into the reservoir by forcing a fluid (which may be a non-hydrocarbon gas, or inert gas, or nitrogen, or argon, or mixture thereof), into the reservoir, or into the production tubing; and producing at least some of the hydrocarbons and sulfur compounds from the reservoir through the production tubing, the composition wetting the production tubing and preventing substantial deposition of elemental sulfur thereon.

Claims (19)

1. A method of producing a sour hydrocarbon gas from a reservoir, the method comprising:

a) injecting an aqueous composition consisting essentially of water into a well within the reservoir so as to contact at least a portion of the reservoir with the aqueous composition, the well having production tubing, and the reservoir comprising hydrocarbons and sulfur compounds;

b) injecting an inert gas into the well to force the aqueous composition further into the reservoir;

c) producing at least some of the hydrocarbons and sulfur compounds mixed with the aqueous composition from the reservoir; and

d) repeating (a) through (c) wherein the aqueous composition consists of only water and no additives, the aqueous composition consisting of only water and no additives wetting the production tubing and preventing substantial deposition of elemental sulfur on the production tubing.

2. The method of claim 1 wherein the inert gas comprises gaseous nitrogen.

3. The method of claim 1 wherein (c) occurs in two or more sub-steps where the well is brought back online at a first flow rate, and then the flow rate is ramped up.

4. The method of claim 1 , further comprising injecting an organic or inorganic solvent into the well within the reservoir prior to (a).

5. The method in accordance with claim 1 wherein the producing is carried out at conditions sufficient to produce a water-saturated hydrocarbon gas stream with entrained liquid water.

6. The method in accordance with claim 1 comprising shutting in the reservoir after (b).

7. The method in accordance with claim 1 , further comprising monitoring the hydrocarbon gas being produced for one or more indications of elemental sulfur being deposited on the production tubing after (c).

8. The method in accordance with claim 1 wherein (a) comprises injecting the aqueous composition into the well through the production tubing, the annulus, or combinations thereof.

9. The method in accordance with claim 1 wherein the production tubing comprises one or more mandrels and wherein (a) comprises injecting the aqueous composition into the well through the one or more mandrels.

10. The method in accordance with claim 1 wherein the temperature of the aqueous composition is at least high enough during the contacting to prevent hydrate formation.

11. The method in accordance with claim 1 wherein the reservoir has a temperature above the melting point of sulfur, and the aqueous composition has a surface injection temperature high enough so that when the composition reaches the reservoir, the temperature of the aqueous composition upon contact with the production tubing is above the melting point of sulfur to prevent freezing of elemental sulfur, and so that the water will mobilize any liquid sulfur and push it back further into the reservoir.

12. The method of claim 2 wherein the gaseous nitrogen is produced onsite using an onsite nitrogen generator.

13. The method of claim 2 comprising delivering liquid nitrogen to a well location in a cryogenic pressurized tank, either on a pump truck itself or brought out in a separate bulker, and feeding the liquid nitrogen into a liquid nitrogen pumping unit to pressurize and move the liquid through a heating device to produce the gaseous nitrogen.

14. The method of claim 1 wherein the aqueous composition in (a) comprises one or more additives.

15. The method of claim 14 wherein the one or more additives comprises a surfactant, an alkali salt, or combinations thereof.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 19, 2009
From: EDDY, DERRY; ZEMLAK, KEAN
To: BP CORPORATION NORTH AMERICA INC.
Reel/Frame 022701/0042 →
Continuity (2)
Provisional Application 61054729 · May 20, 2008
Related Publication 20090288822A1 · Nov 26, 2009