Tether handling for airborne electricity generators
A power generation system ( 20 ) including an airborne electricity generator ( 30 ), a tether assembly ( 40 ) configured to carry electricity from the generator to land, the tether assembly having a first end portion ( 42 ) coupled to the generator, and a winch assembly ( 50 ) configured to reel the tether assembly onto a drum ( 52 ), wherein the winch assembly is configured to apply a reel tension to the tether assembly reeled onto the drum that is lower than a tension in the first end portion of the tether assembly.
1. A method of handling a tether coupled to an airborne electricity generator, the method comprising:
flying the airborne electricity generator at a first altitude;
reducing tension in the tether substantially autorotating the airborne electricity generator in a descent from the first altitude, wherein autorotating includes employing an upward flow of air through rotors of the airborne electricity generator to rotate the rotors and provide lift during the descent; and
reeling the tether onto a drum.
2. The method of claim 1 , wherein reeling the tether onto a drum comprises reeling the tether onto the drum during substantially autorotating the airborne electricity generator.
3. The method of claim 1 , wherein flying an airborne electricity generator at a first altitude comprises flying the airborne electricity generator to a deployment altitude that is greater than the first altitude.
4. The method of claim 3 , further comprising:
after achieving the deployment altitude, clamping the tether at a desired deployed length;
flying the airborne electricity generator from the deployment altitude to the first altitude; and
generating electricity with the airborne electricity generator at the first altitude, the electricity conducted down the tether to a ground-based station.
5. A method of handling a tether coupled to an airborne electricity generator, the method comprising;
flying the airborne electricity generator at a first altitude;
reducing tension in the tether while flying the airborne electricity generator; and
reeling the tether onto a drum, wherein reeling the tether onto the drum comprises introducing the tether to the drum at an approximately level reel angle up to approximately 10degrees.
6. A method of handling a tether coupled to an airborne electricity generator, the method comprising;
flying the airborne electricity generator at a first altitude;
reducing tension in the tether while flying the airborne electricity generator; and
reeling the tether onto a drum, wherein the tether comprises a load bearing cable attached to the airborne electricity generator and a conducting cable attached to the airborne electricity generator, and reeling the tether onto a drum comprises reeling the load bearing cable onto a first drum and reeling the conducting cable onto a second drum.
7. The method of claim 6 , wherein reeling the conducting cable onto the second drum is started before reeling the load bearing cable onto the first drum.