IP Library Granted Patent US 8,055,478
Granted Patent B2
US 8,055,478 · App. 12/570,644 · Granted Nov 8, 2011

Maintenance minder for forced air heater

Assignees: Pinnacle Products International, Inc.; SP Elemech
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,055,478
App. No.
12/570,644
Granted
Nov 8, 2011
Kind
B2
Abstract

The present invention includes a frame that is quickly and easily assembled and disassembled. The frame may be used for supporting a portable forced air heater, or other similar equipment. Handles, supports, and optionally a wheel assembly is assembled to two core members using snap lock buttons. In a preferred embodiment, the portable forced air heater includes a maintenance clock for measuring and recording operational parameters of a portable forced air heater, and for notifying a user that maintenance is required.

Claims (25)

1. An apparatus for identifying when maintenance is required for a forced air heater, the apparatus comprising:

an activity sensor that detects when the heater is in operation and transmits operating data to a memory that records data from the activity sensor;

a timer that tracks a running time of the heater;

a controller for generating display information and for determining whether maintenance is required for the heater based on predetermined values, at least one of the predetermined values being a maximum total running time between maintenance that is compared with the tracked running time of the heater; and

a display controlled by the controller and configured for displaying the display information supplied by the controller to indicate when maintenance is required.

2. The apparatus of claim 1 , wherein the controller includes a reset to reset the display after maintenance has been performed.

3. Apparatus of claim 1 , wherein the controller compares a last maintenance date with a current date to determine whether maintenance is required.

4. The apparatus of claim 1 , wherein the sensor monitors a temperature of the heater to determine the running time.

5. The apparatus of claim 1 , wherein the sensor monitors an electrical current to determine the running time.

6. A portable forced air heater comprising:

a frame comprising:

at least one core member, having at least one mating end, that is connected to an industrial implement;

at least one projecting member, having at least one mating end that complements the core member's mating end, and is sized appropriately for the industrial implement; and

at least two mating lock elements, one of which is associated with the core member and one of which is associated with the projecting member; and

an apparatus for identifying when maintenance is required comprising:

a sensor configured for sensing when the heater is operating and for transmitting operating data;

a memory configured for recording data from the sensor;

a timer that tracks a running time of the heater;

a controller for generating display information and for determining whether maintenance is required for the heater based on predetermined values, at least one of the predetermined values being a maximum total running time between maintenance that is compared with the tracked running time of the heater; and

a display controlled by the controller and configured for displaying the display information supplied by the controller to indicate when maintenance is required.

7. A maintenance minder for a forced air heater, the minder comprising:

a memory for storing maintenance information;

an activity sensor that detects when a heater is in operation and transmits operating data, including a tracked running time of the heater, to the memory;

a controller determining when maintenance is required, based upon the operating data and the stored maintenance information, including comparison of the tracked running time of the heater against a predetermined maximum total running time between maintenance, and for generating maintenance related information; and

a display that receives and displays the maintenance related information generated by the controller.

Assignments (9)
SECURITY INTEREST Recorded Aug 2, 2021
From: PINNACLE CLIMATE TECHNOLOGIES, INC. F/K/A PINNACLE PRODUCTS INTRENATIONAL, INC.; SCHAEFER VENTILATION EQUIPMENT CORP.; PPI ACQUISITION GROUP, INC.
To: INVESTORS BANK, AS AGENT
Reel/Frame 057051/0822 →
RELEASE OF SECURITY INTEREST Recorded Oct 26, 2017
From: FIFTH THIRD BANK
To: PINNACLE CLIMATE TECHNOLOGIES, INC.
Reel/Frame 043960/0279 →
SECURITY AGREEMENT Recorded Sep 25, 2017
From: PINNACLE CLIMATE TECHNOLOGIES, INC.
To: STERLING NATIONAL BANK
Reel/Frame 043988/0679 →
CHANGE OF NAME Recorded Apr 13, 2016
From: PINNACLE PRODUCTS INTERNATIONAL, INC.
To: PINNACLE CLIMATE TECHNOLOGIES, INC.
Reel/Frame 038426/0961 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2016
From: MCCALLEY, STEVE; HWANG, K. S.
To: PINNACLE PRODUCTS INTERNATIONAL, INC.; SP ELEMECH
Reel/Frame 037488/0753 →
SECURITY INTEREST Recorded Nov 17, 2015
From: PINNACLE PRODUCTS INTERNATIONAL, INC.
To: FIFTH THIRD BANK
Reel/Frame 037063/0620 →
SECURITY INTEREST Recorded Oct 12, 2015
From: PINNACLE PRODUCTS INTERNATIONAL, INC.
To: SPELL CAPITAL MEZZANINE PARTNERS SBIC, LP
Reel/Frame 036774/0989 →
SECURITY INTEREST Recorded Jun 11, 2015
From: PINNACLE PRODUCTS INTERNATIONAL, INC.
To: FIFTH THIRD BANK
Reel/Frame 035890/0382 →
RELEASE OF SECURITY INTEREST Recorded Jun 9, 2015
From: CITIZENS BANK OF PENNSYLVANIA
To: PINNACLE PRODUCTS INTERNATIONAL, INC.
Reel/Frame 035871/0342 →
Continuity (2)
Division 11711220 · Feb 27, 2007
Related Publication 20100033335A1 · Feb 11, 2010