IP Library Patent Application 12726961
Patent Application
App. No. 12/726,961

Non-Smoking Connector Pipe

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
12/726,961
Abstract

A process for producing a fume free connector pipe is disclosed. The connector pipe is placed in a curing oven at a start temperature, the oven having a convective air CFM and an intake/exhaust air CFM. The oven temperature is increased over an increase time period to a hold temperature and the connector pipe is heated at the hold temperature for a hold time period then removed from the curing oven after a total amount of time, the total amount of time being the increase time period plus the hold time period.

Claims (47)

1 . A non-smoking connector pipe manufacturing process comprising the steps of:

fabricating a connector pipe;

applying a coating to the connector pipe;

completing a first, room temperature, cure;

placing the connector pipe in a curing oven for a second cure at a start temperature, the oven having a convective air CFM and an intake/exhaust air CFM;

increasing the oven temperature over an increase time period to a hold temperature;

heating the connector pipe at the hold temperature for a hold time period; and

removing the connector pipe from the curing oven after a total heating time, the total heating time consisting of the increase time period plus the hold time period.

2 . The process of claim 1 wherein the second cure is about 0.15 lbs. per minute or less.

3 . The process of claim 1 wherein the total heating time is about thirty minutes or less.

4 . The process of claim 1 wherein the connector pipe is introduced into the oven at a start temperature of about 400 degrees F.; the hold temperature is about 450 degrees F.; the increase time period is about fifteen minutes to about a seventeen minutes; the hold time period is about thirteen to about fifteen minutes; the convective air CFM is about 125 CFM and intake/exhaust air CFM is about 75 CFM.

5 . The process of claim 4 wherein the increase time period is about fifteen minutes and the hold time period is about fifteen minutes.

6 . The process of claim 4 wherein the increase time period is about seventeen minutes and the hold time period is about thirteen minutes.

7 . The process of claim 1 wherein the total heating time is about twenty-five minutes or less.

8 . The process of claim 7 wherein the connector pipe is introduced into the oven at a start temperature of about 400 degrees F.; the hold temperature is about 450 degrees F.; the increase time period is about fifteen minutes; the hold time period is about ten minutes; the convective air CFM is about 210 CFM and intake/exhaust air CFM is about 75 CFM.

9 . The process of claim 1 wherein the total heating time is about twenty minutes or less.

10 . The process of claim 1 wherein the connector pipe is introduced into the oven at a start temperature of about 350 degrees F.; the hold temperature is about 415 degrees F.; the increase time period is about ten minutes to about eleven minutes; the hold time period is about nine to about ten minutes; the convective air CFM is about 210 CFM and intake/exhaust air CFM is about 75 CFM.

11 . The process of claim 10 wherein the increase time period is about eleven minutes and the hold time period is about nine minutes.

12 . The process of claim 10 wherein the increase time period is about ten minutes and the hold time period is about ten minutes.

13 . A non-smoking connector pipe curing process comprising the steps of:

completing a first, room temperature, cure;

placing the connector pipe in a curing oven for a second cure at a start temperature, the oven having a convective air CFM and an intake/exhaust air CFM;

increasing the oven temperature over an increase time period to a hold temperature;

heating the connector pipe at the hold temperature for a hold time period; and

removing the connector pipe from the curing oven after a total amount of time, the total amount of time consisting of the increase time period plus the hold time period.

14 . The process of claim 13 wherein the second cure is about 0.15 lbs. per minute or less.

15 . The process of claim 13 wherein the total heating time is about thirty minutes or less.

16 . The process of claim 13 wherein the connector pipe is introduced into the oven at a start temperature of about 400 degrees F.; the hold temperature is about 450 degrees F.; the increase time period is about fifteen minutes to about a seventeen minutes; the hold time period is about thirteen to about fifteen minutes; the convective air CFM is about 125 CFM and intake/exhaust air CFM is about 75 CFM.

17 . The process of claim 16 wherein the increase time period is about fifteen minutes and the hold time period is about fifteen minutes.

18 . The process of claim 16 wherein the increase time period is about seventeen minutes and the hold time period is about thirteen minutes.

19 . The process of claim 13 wherein the total heating time is about twenty-five minutes or less.

20 . The process of claim 19 wherein the connector pipe is introduced into the oven at a start temperature of about 400 degrees F.; the hold temperature is about 450 degrees F.; the increase time period is about fifteen minutes; the hold time period is about ten minutes; the convective air CFM is about 210 CFM and intake/exhaust air CFM is about 75 CFM.

21 . The process of claim 13 wherein the total heating time is about twenty minutes or less.

22 . The process of claim 13 wherein the connector pipe is introduced into the oven at a start temperature of about 350 degrees F.; the hold temperature is about 415 degrees F.; the increase time period is about ten minutes to about eleven minutes; the hold time period is about nine to about ten minutes; the convective air CFM is about 210 CFM and intake/exhaust air CFM is about 75 CFM.

23 . The process of claim 22 wherein the increase time period is about eleven minutes and the hold time period is about nine minutes.

24 . The process of claim 22 wherein the increase time period is about ten minutes and the hold time period is about ten minutes.

25 . A non-smoking connector pipe cure comprising:

a first, room temperature, cure; and

a second cure comprising

placing the connector pipe in a curing oven at a start temperature, the oven having a convective air CFM and an intake/exhaust air CFM;

increasing the oven temperature over an increase time period to a hold temperature;

heating the connector pipe at the hold temperature for a hold time period; and

removing the connector pipe from the curing oven after a total heating time, the total heating time consisting of the increase time period plus the hold time period.

26 . The connector pipe cure of claim 25 wherein the second cure is about 0.15 lbs. per minute or less.

27 . The connector pipe cure of claim 25 wherein the connector pipe is introduced into the oven at a start temperature of about 350 degrees F.; the hold temperature is about 415 degrees F.; the increase time period is about ten minutes to about eleven minutes; the hold time period is about nine to about ten minutes; the convective air CFM is about 210 CFM and intake/exhaust air CFM is about 75 CFM.

28 . The connector pipe cure of claim 27 wherein the increase time period is about eleven minutes and the hold time period is about nine minutes.

29 . The connector pipe cure of claim 27 wherein the increase time period is about ten minutes and the hold time period is about ten minutes.

Assignments (2)
SECURITY AGREEMENT Recorded Jul 26, 2012
From: OLYMPIA CHIMNEY SUPPLY, INC.
To: MANUFACTURERS AND TRADERS TRUST COMPANY
Reel/Frame 028646/0101 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 18, 2010
From: PENATZER, STEVEN
To: OLYMPIA CHIMNEY SUPPLY
Reel/Frame 024102/0785 →