IP Library Granted Patent US 8,414,780
Granted Patent B2
US 8,414,780 · App. 12/735,461 · Granted Apr 9, 2013

Method and system for removing slag, particularly slag that occurs during synthesis gas extraction, from a slag bath container

Inventors: Johannes Kowoll (Bochum, DE); Eberhard Kuske (Soest, DE)
Assignee: ThyssenKrupp Uhde GmbH
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,414,780
App. No.
12/735,461
Granted
Apr 9, 2013
Kind
B2
Abstract

With a method for removing slag, particularly slag that occurs during synthesis gas extraction, from a slag bath situated in a pressurized container, into a collection container for the slag, below the slag bath in the direction of gravity, a device for breaking up the slag is provided below the slag bath, and a sluice valve is provided between the containers. A space filled with a gas bubble, which space stands in contact with the liquid in the containers, particularly a ring space or a separate container, is provided, in which the pressure of the gas bubble is regulated by supplying gas. At least a part of the water situated in the slag sluice/collection space flows through the slag bath valve when the latter is opened, in the direction of the slag bath, counter to the direction of gravity.

Claims (9)

1. A method for removing slag that occurs during synthesis gas extraction, from a slag bath situated in a pressurized container, into a collection container for the slag, below the slag bath in the direction of gravity, comprising the following steps:

providing a device for breaking up the slag below the slag bath;

providing a sluice valve between the containers;

providing a space filled with a gas bubble under a regulative pressure, wherein the space stands in contact with a liquid in the containers;

assigning installations to the collection container for regulating a flow of a slag/water stream;

cooling the slag/water stream by providing a narrowed flow channel following the installations, counter to the direction of gravity;

producing a short, intensive counter-stream to counter the slag/water stream in the collection container to loosen any wedged slag bridges, by feeding in colder water, wherein the duration of the short, intensive counter-stream is a few seconds;

regulating the pressure of the gas bubble by supplying gas, in such a manner that at least a part of the water situated in the collection container flows through the sluice valve when the sluice valve is opened, in the direction of the slag bath;

providing a filling process at a temperature with fresh water, wherein during the filling process and before emptying the collection container, the temperature is adjusted by feed of the fresh water to a desired temperature, and after the desired temperature has been reached, an outlet valve is opened and the slag/water stream is passed to an encapsulated settling pan to produce settled slag that is equipped with devices for discharging the settled slag and with devices for drawing off vapors.

Assignments (2)
CHANGE OF NAME Recorded Feb 27, 2013
From: UHDE GMBH
To: THYSSENKRUPP UHDE GMBH
Reel/Frame 029884/0325 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 19, 2010
From: KOWOLL, JOHANNES; KUSKE, EBERHARD
To: UHDE GMBH
Reel/Frame 024716/0515 →
Priority Claims (1)
DE 10 2008 005 704 · Jan 24, 2008 · national
Continuity (1)
Related Publication 20100288711A1 · Nov 18, 2010