IP Library Granted Patent US 8,109,723
Granted Patent B2
US 8,109,723 · App. 12/850,204 · Granted Feb 7, 2012

Device and method for controlling wind turbine

Assignee: Mitsubishi Heavy Industries, Ltd.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,109,723
App. No.
12/850,204
Granted
Feb 7, 2012
Kind
B2
Abstract

In a conventional technique, a shutdown sequence indicating a sequential operation from a start of the feathering of a wind turbine to the stop is started in response to an alert signal caused by an external factor. In the present invention, when the alert is called off during the shutdown sequence, the shutdown sequence is stopped, and the recovery control by which the pitch angle of the wind turbine blade is controlled toward the fine state is performed. By such a control, the stop period of the wind turbine under the shutdown can be shortened, so that the decrease in the operating rate of the wind farm can be suppressed.

Claims (15)

1. A control apparatus of a wind turbine comprising:

an alert obtaining part configured to obtain a signal indicating an alert;

a shutdown sequence storage part configured to store a sequential operation from a start of a feathering to a stop of the wind turbine as a shutdown sequence;

a shutdown start part configured to start the shutdown sequence in response to the signal indicating the alert; and

a recovery part configured to perform a recovery control when the alert is called off during the shutdown sequence, wherein by the recovery control, the shutdown sequence is stopped, and a control toward a fine state by which a pitch angle of a wind turbine blade is controlled toward a fine is performed.

2. The control apparatus of the wind turbine according to claim 1 , wherein when the wind turbine is disconnected during the recovery control, after the control by which the pitch angle of the wind turbine blade is controlled toward the fine state is started, the wind turbine is put into synchronization operation when a rotational speed of the wind turbine becomes higher than a predetermined synchronization standard.

3. The control apparatus of the wind turbine according to claim 1 , wherein the shutdown sequence is an operation in which the feathering of the wind turbine is started, and after that, the wind turbine is disconnected when the rotational speed of the wind turbine becomes lower than a predetermined standard, and after that, a control of the wind turbine is stopped.

4. A control method of a wind turbine comprising:

obtaining a signal indication an alert;

starting a shutdown sequence indicating a sequential operation from a start of a feathering to a stop of the wind turbine in response to the signal indicating the alert; and

performing a recovery control when the alert is called off during the shutdown sequence, wherein by the recovery control, the shutdown sequence is stopped, and a control toward a fine state by which a pitch angle of a wind turbine blade is controlled toward a fine is performed.

5. The control method of the wind turbine according to claim 4 , further comprising:

putting the wind turbine into synchronization operation when a rotational speed of the wind turbine becomes higher than a predetermined synchronization standard,

wherein the putting is performed when the wind turbine is disconnected in the recovery control, after the control by which the pitch angle of the wind turbine blade is controlled toward the fine state is started.

6. The control method of the wind turbine according to claim 4 , wherein the shutdown sequence is an operation in which the feathering of the wind turbine is started, and after that, the wind turbine is disconnected when the rotational speed of the wind turbine becomes lower than a predetermined standard, and after that, a control of the wind turbine is stopped.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 17, 2010
From: BABA, MITSUYA
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 025003/0524 →
Continuity (2)
Continuation PCTJP2010058905 · May 26, 2010
Related Publication 20110293418A1 · Dec 1, 2011