IP Library › Granted Patent US 8,757,254
Granted Patent B2
US 8,757,254 · App. 12/857,699 · Granted Jun 24, 2014

Adjustment of mud circulation when evaluating a formation

Inventors: Steven G. Villreal (Houston, TX); Julian J. Pop (Houston, TX); Vladimir Vaynshteyn (Sugar Land, TX)
Assignee: Schlumberger Technology Corporation
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,757,254
App. No.
12/857,699
Granted
Jun 24, 2014
Kind
B2
Abstract

A method for controlling drilling fluid rate in a wellbore is disclosed. A drill string is disposed into the well and connected to a formation testing or sampling tool. Drilling fluid is circulated at a first rate through the drill string. Data related to the wellbore, a formation about the wellbore or the formation sampling tool is transmitted to a processor. Upon analysis of the data, the drilling fluid circulation rate is changed to a second rate that is different from the first rate.

Claims (19)

1. A method for controlling drilling fluid rate in a wellbore comprising:

deploying a drill string into the well, the drill string connected to a formation testing or sampling tool;

circulating drilling fluid at a first rate through the drill string;

transmitting a measurement related to the formation testing or sampling tool to a surface processor wherein the measurement relates to a power level of a power supply powering the formation testing or sampling tool; and

changing the circulation rate of the drilling fluid to a second rate based on the power level of the formation testing or sampling tool being below a predetermined level, wherein the first rate is at a rate sufficient to conduct mud pulse telemetry, the second rate is higher than the first rate and too high to conduct mud pulse telemetry.

2. The method of claim 1 wherein the surface processor automatically, without human intervention, performs the step of changing the circulation rate of the drilling fluid to the second rate based on the measurement.

3. The method of claim 1 wherein the drilling fluid passes through a turbine to generate power to directly or indirectly power the formation testing or sampling tool.

4. The method of claim 3 wherein the measurement is a power consumption of the formation testing or sampling tool and further wherein the second rate is a minimum rate to power the formation testing or sampling tool.

5. The method of claim 1 wherein the measurement is transmitted to the surface processor via wired drill pipe telemetry comprising a plurality of pipe joints communicatively coupled for transmitting data.

6. A method for controlling drilling fluid rate in a wellbore comprising:

deploying a drill string into the well, the drill string connected to a formation testing or sampling tool;

circulating drilling fluid at a first rate through the drill string;

transmitting a measurement related to the formation testing or sampling tool to a surface processor wherein the measurement relates to an operating temperature of the formation testing or sampling tool; and

changing the circulation rate of the drilling fluid to a second rate based on the operating temperature exceeding a predetermined level or is at or near a maximum operating temperature, wherein the first rate is at a rate sufficient to conduct mud pulse telemetry, the second rate is higher than the first rate and too high to conduct mud pulse telemetry.

7. A method for controlling drilling fluid rate in a wellbore comprising:

deploying a drill string into the well, the drill string connected to a formation testing or sampling tool;

circulating drilling fluid at a first rate through the drill string;

obtaining a measurement related to contamination of formation fluid with the formation testing or sampling tool wherein the measurement relates to the contamination level of extracted fluid; and

changing the circulation rate of the drilling fluid to a second rate based on the contamination level of extracted fluid being below a predetermined level in order minimize contamination while still permitting the formation testing or sampling tool to have adequate power to obtain the measurement, wherein the first rate is at a rate sufficient to conduct mud pulse telemetry, the second rate is higher than the first rate and too high to conduct mud pulse telemetry.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 21, 2010
From: VILLAREAL, STEVEN G.; POP, JULIAN J.; MEEK, DALE; LATRILLE, FREDERIC; VAYNSHTEYN, VLADIMIR
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 025175/0195 →
Continuity (2)
Provisional Application 61234789 · Aug 18, 2009
Related Publication 20110198076A1 · Aug 18, 2011