IP Library Granted Patent US 8,997,686
Granted Patent B2
US 8,997,686 · App. 12/893,554 · Granted Apr 7, 2015

System for and method of fast pulse gas delivery

Inventor: Junhua Ding (Tewksbury, MA)
Assignee: MKS Instruments, Inc.
C23C16/52C23C16/448C23C16/45523C23C16/45561G05D7/0647
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,997,686
App. No.
12/893,554
Granted
Apr 7, 2015
Kind
B2
Abstract

A system for and method of delivering pulses of a desired mass of gas to a tool is described. A system for delivering pulses of a desired mass of gas to a process chamber or tool, comprising: a gas delivery chamber; a first valve arranged so as to control the flow of gas into the gas delivery chamber; a second valve arranged so as control the flow of gas leaving the gas delivery chamber so that the gas can leave the gas delivery chamber in pulses, each of a selected mass as a function of the initial pressure of the gas in the gas delivery chamber and the duration of the respective pulse; and a pressure control arrangement configured and arranged so as to control the flow of gas into the gas delivery chamber so as to precharge the gas in the gas delivery chamber to an initial pressure set point prior to delivering the pulses of gas such that the variance of the starting pressure of the gas in the gas delivery chamber is controlled prior to delivering the pulses of gas, and the repeatability of the mass delivery is improved as a function of the duration of each of the pulses.

Claims (22)

1. A system for delivering pulses of a desired mass of gas to a process chamber or tool, comprising:

a gas delivery chamber;

a first valve arranged so as to control the flow of gas into the gas delivery chamber;

a second valve arranged so as control the flow of gas leaving the gas delivery chamber so that the gas can leave the gas delivery chamber in pulses, each of a selected mass as a function of the initial pressure of the gas in the gas delivery chamber; and

a pressure control arrangement configured and arranged so as to control the pressure of the gas flowing into the gas delivery chamber so as to precharge the gas in the gas delivery chamber to a substantially-constant initial starting pressure set point prior to delivering each of the pulses of gas, such that variance in the starting pressure of the gas in the gas delivery chamber is controlled prior to delivering each of the pulses of gas, thus improving the repeatability of the mass delivery as a function of the duration of each of the pulses,

wherein the pressure control arrangement includes an antechamber constructed and arranged so as to receive the gas and selectively coupled to provide the substantially-constant pressure gas supply through the first valve into the gas delivery chamber so as to control the variance of the initial pressure of the gas in the gas delivery chamber before delivery of each of the pulses of gas.

2. A system according to claim 1 , further including a pressure transducer arranged so as to provide a pressure signal as a function of the pressure within the gas delivery chamber, wherein the pressure control arrangement includes a controller for controlling the flow of gas into the gas delivery system as a function of the pressure signal.

3. A system according to claim 1 , further including a temperature sensor arranged so as to provide a temperature signal as a function of the gas temperature within the gas delivery chamber, wherein the pressure control arrangement includes a controller for controlling the flow of gas into the gas delivery system as a function of the temperature signal.

4. A system according to claim 1 , wherein the pressure control arrangement includes a first controller configured and arranged so as to control the flow of gas into and out of the gas delivery chamber as a function of the pressure within the gas delivery chamber.

5. A system according to claim 1 , wherein the pressure control arrangement is further configured and arranged so as to control the first valve so as to control the flow of gas from the antechamber into the gas delivery chamber so as to control the variance of the initial pressure of the gas in the gas delivery chamber before delivery of pulses of gas.

6. A system according to claim 1 , further including a first pressure transducer arranged so as to provide a first pressure signal as a function of the pressure within the gas delivery chamber, and a second pressure transducer arranged so as to provide a second pressure signal as a function of the pressure within the antechamber, wherein the pressure control arrangement includes a controller for controlling the flow of gas into the gas delivery system as a function of the first and second pressure signals.

7. A system according to claim 6 , further including a third valve arranged so as to control the flow into the antechamber, and wherein the pressure control arrangement is configure and arranged so as to control the third valve so as to control the flow of gas into the antechamber as a function of the second pressure signal, control the first valve so as to control the flow of fluid from the antechamber into the gas delivery chamber as a function of the first and second pressure signals, and control the flow of gas leaving the gas delivery chamber as a function of the first pressure signal.

8. A system according to claim 7 , wherein the controller arrangement includes a first controller configured and arranged so as to control the first and second valves, and a second controller configured and arranged so a to control the third valve, and a third controller configured and arranged so as to control the first and second controllers.

9. A system according to claim 1 , wherein the antechamber is selectively coupled to the gas delivery chamber so as to charge the gas delivery chamber with the gas through the first valve.

10. A system according to claim 1 , wherein the controller arrangement is configured and arranged so as to control the third valve so as to maintain the pressure in the antechamber at a select pressure.

11. A system according to claim 10 , wherein the initial pressure set point in the gas delivery chamber is a function of gas type and the selected mass of the pulse of gas to be delivered.

12. A system according to claim 1 , wherein the system is for delivering pulses of a desired mass of gas to a wafer in a process chamber or tool.

13. A system according to claim 1 , wherein the system is for delivering pulses of a desired mass of gas to a substrate in a process chamber or tool.

14. A system according to claim 1 , wherein the system is for delivering pulses of a desired mass of gas to a semiconductor tool.

15. A system according to claim 1 , wherein the system is for delivering pulses of a desired mass of gas to a semiconductor processing chamber.

16. A system according to claim 1 , wherein the system is for delivering pulses of a desired mass of gas to a plasma etching machine.

17. A system according to claim 1 , wherein the pressure control arrangement causes the first valve to close when the initial starting pressure set point is reached.

Assignments (9)
RELEASE OF SECURITY INTEREST Recorded Aug 24, 2022
From: BARCLAYS BANK PLC
To: MKS INSTRUMENTS, INC.; NEWPORT CORPORATION; ELECTRO SCIENTIFIC INDUSTRIES, INC.
Reel/Frame 063009/0001 →
RELEASE OF SECURITY INTEREST Recorded Aug 24, 2022
From: BARCLAYS BANK PLC
To: MKS INSTRUMENTS, INC.; NEWPORT CORPORATION; ELECTRO SCIENTIFIC INDUSTRIES, INC.
Reel/Frame 062739/0001 →
SECURITY INTEREST Recorded Aug 19, 2022
From: MKS INSTRUMENTS, INC.; NEWPORT CORPORATION; ELECTRO SCIENTIFIC INDUSTRIES, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 061572/0069 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE U.S. PATENT NO.7,919,646 PREVIOUSLY RECORDED ON REEL 048211 FRAME 0312. ASSIGNOR(S) HEREBY CONFIRMS THE PATENT SECURITY AGREEMENT (ABL). Recorded Jan 14, 2021
From: ELECTRO SCIENTIFIC INDUSTRIES, INC.; MKS INSTRUMENTS, INC.; NEWPORT CORPORATION
To: BARCLAYS BANK PLC, AS COLLATERAL AGENT
Reel/Frame 055668/0687 →
PATENT SECURITY AGREEMENT (ABL) Recorded Feb 1, 2019
From: ELECTRO SCIENTIFIC INDUSTRIES, INC.; MKS INSTRUMENTS, INC.; NEWPORT CORPORATION
To: BARCLAYS BANK PLC, AS COLLATERAL AGENT
Reel/Frame 048211/0312 →
RELEASE OF SECURITY INTEREST Recorded Feb 1, 2019
From: DEUTSCHE BANK AG NEW YORK BRANCH
To: MKS INSTRUMENTS, INC.; NEWPORT CORPORATION
Reel/Frame 048226/0095 →
SECURITY AGREEMENT Recorded May 4, 2016
From: MKS INSTRUMENTS, INC.; NEWPORT CORPORATION
To: DEUTSCHE BANK AG NEW YORK BRANCH
Reel/Frame 038663/0265 →
SECURITY AGREEMENT Recorded May 4, 2016
From: MKS INSTRUMENTS, INC.; NEWPORT CORPORATION
To: BARCLAYS BANK PLC; BARCLAYS BANK PLC
Reel/Frame 038663/0139 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 1, 2010
From: DING, JUNHUA
To: MKS INSTRUMENTS, INC.
Reel/Frame 025228/0442 →
Continuity (1)
Related Publication 20120073672A1 · Mar 29, 2012