IP Library Granted Patent US 8,718,845
Granted Patent B2
US 8,718,845 · App. 12/899,450 · Granted May 6, 2014

Energy management system for heavy equipment

Inventors: Michael Gordon Onsager (Franklin, WI); Joseph Helfrich (Milwaukee, WI); Dave L. Perugini (Kenosha, WI); Wayne George Chmiel (Norway, WI); Peter James Miller (Brookfield, WI)
Assignee: Caterpillar Global Mining LLC
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,718,845
App. No.
12/899,450
Granted
May 6, 2014
Kind
B2
Abstract

Heavy equipment includes a body, an electrical bus, and working components coupled to the body and powered by electricity conveyed via the electrical bus. The heavy equipment further includes a generator set providing an electrical output to the electrical bus, an energy storage element configured to be coupled to the electrical bus, and a computerized controller coupled to the energy storage element. The computerized controller includes a logic module for coupling the energy storage element to the electrical bus in advance of a predicted increase in demand upon the electrical bus, where the increase in demand is anticipated by the computerized controller as forthcoming based upon extrapolation, at least in part, from data related to a previous operation of the heavy equipment.

Claims (17)

1. Heavy equipment designed to operate in a substantially repetitive cycle, comprising:

a work implement;

an actuator for operating the work implement;

an electrical bus;

a power source connected to the electrical bus for powering the actuator;

a capacitor configured to be connected to the electrical bus for receiving power from the power source during a portion of the substantially repetitive cycle and for augmenting the power source during another portion of the substantially repetitive cycle;

a computerized controller comprising a logic module for connecting the capacitor to the electrical bus in advance of a predicted demand on the electrical bus to maintain a substantially constant voltage on the electrical bus during the predicted demand and prevent a drop in voltage on the electrical bus that would otherwise result from the predicted demand, wherein the predicted demand is anticipated by the computerized controller as forthcoming based upon extrapolation, at least in part, from data related to a past operation of the heavy equipment.

2. The heavy equipment of claim 1 , wherein the data used by the computerized controller for anticipation of the predicted demand comprises data corresponding to a previous iteration of the substantially repetitive cycle.

3. The heavy equipment of claim 1 , wherein the data used by the computerized controller for anticipation of the predicted demand comprises data corresponding to an immediately preceding operation of the heavy equipment.

4. The heavy equipment of claim 3 , wherein the data used by the computerized controller for anticipation of the predicted demand comprises data corresponding to immediately preceding iterations of the substantially repetitive cycle by the heavy equipment.

5. The heavy equipment of claim 1 , wherein the power source comprises a generator set.

6. The heavy equipment of claim 1 , wherein the capacitor receives power from the power source to charge the capacitor when demand on the electrical bus is less than an electrical output of the power source.

7. The heavy equipment of claim 6 , wherein the computerized controller is configured to decouple the capacitor from the electrical bus when the capacitor is fully charged.

8. The heavy equipment of claim 1 , wherein the capacitor comprises an ultra-capacitor.

9. The heavy equipment of claim 1 , wherein the actuator comprises a linear actuator.

10. The heavy equipment of claim 1 , wherein the power source provides power to the electrical bus at a substantially constant rate regardless of a present loading of the work implement.

11. The heavy equipment of claim 6 , wherein the power source is operated such that the substantially constant rate of power provided by the power source is insufficient to provide power for the predicted demand during the substantially repetitive cycle.

Assignments (2)
CHANGE OF NAME Recorded Nov 12, 2013
From: BUCYRUS INTERNATIONAL, INC.
To: CATERPILLAR GLOBAL MINING LLC
Reel/Frame 031620/0113 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 7, 2010
From: ONSAGER, MICHAEL GORDON; HELFRICH, JOSEPH; PERUGINI, DAVE L.; CHMIEL, WAYNE GEORGE; MILLER, PETER JAMES
To: BUCYRUS INTERNATIONAL, INC.
Reel/Frame 025109/0903 →
Continuity (1)
Related Publication 20120089280A1 · Apr 12, 2012