IP Library Granted Patent US 8,331,186
Granted Patent B2
US 8,331,186 · App. 12/986,993 · Granted Dec 11, 2012

Fuse programming schemes for robust yield

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,331,186
App. No.
12/986,993
Granted
Dec 11, 2012
Kind
B2
Abstract

A program circuit generates first and second currents to program the fuse. The second current is higher than the first current. A control circuit controls generating the first and second currents in succession.

Claims (26)

1. A method comprising:

applying a fuse program voltage to a first end of a fuse;

generating a first current provided by one or more program devices connected to a second end of the fuse for a first time period with an intention to program the fuse; and

generating a second current higher than the first current by the one or more program devices for a second time period with an intention to program the fuse.

2. The method of claim 1 further comprising:

determining if the first current successfully programs the fuse before generating the second current.

3. The method of claim 1 further comprising:

determining if the second current successfully programs the fuse after generating the second current.

4. The method of claim 1 wherein generating the first current comprises:

generating a first program enable signal to turn on the one or more program devices.

5. The method of claim 1 wherein generating the second current comprises:

generating a second program enable signal to turn on the one or more program devices.

6. A method comprising:

applying a first fuse program voltage to a first end of a fuse;

generating a first current provided by one or more program devices connected to a second end of the fuse for a first time period with an intention to program the fuse;

applying a second fuse program voltage to the first end of the fuse; and

generating a second current higher than the first current by the one or more program devices for a second time period with an intention to program the fuse.

7. The method of claim 6 further comprising:

determining if the first current successfully programs the fuse before applying the second fuse program voltage.

8. The method of claim 6 further comprising:

determining if the second current successfully programs the fuse after generating the second current.

9. The method of claim 6 wherein generating the first current comprises:

generating a first program enable signal to turn on the one or more program devices.

10. The method of claim 9 wherein generating the second current comprises:

generating a second program enable signal to turn on the one or more program devices.

11. The method of claim 10 wherein the first and second program enable signals are the same.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 15, 2022
From: INTEL CORPORATION
To: TAHOE RESEARCH, LTD.
Reel/Frame 061175/0176 →