IP Library Granted Patent US 8,361,930
Granted Patent B2
US 8,361,930 · App. 13/080,723 · Granted Jan 29, 2013

Sintering furnace for producing an HTSC strip

Inventor: Michael Baecker (Cologne, DE)
Assignee: BASF SE
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,361,930
App. No.
13/080,723
Granted
Jan 29, 2013
Kind
B2
Abstract

The invention relates to a method for producing a high temperature superconductor (HTSC) from a strip including an upper side precursor layer and which, for continuous sintering of the precursor layer within a furnace in the presence of a fed-in reaction gas, is drawn across a support. A furnace for performing the method is also described.

Claims (15)

1. A sintering furnace comprising:

a furnace having a furnace space;

a porous support disposed within the furnace space, the porous support configured to support a substrate having an HTSC precursor layer;

at least one inlet operable to direct reaction gas through the porous support; and

at least one outlet operable to remove reaction gas from the furnace space.

2. The sintering furnace of claim 1 , wherein the inlet is disposed within the furnace at a point below the support.

3. The sintering furnace of claim 2 , wherein:

the outlet includes a vacuum mechanism; and

the reaction gas is directed from the inlet and through the porous support, and then is drawn from the furnace space by the vacuum mechanism.

4. The sintering furnace of claim 1 , wherein the outlet comprises at least one suction mechanism disposed above the porous support, the suction mechanism extending generally parallel to the direction in which the substrate is drawn through the furnace.

5. The sintering furnace of claim 1 further comprising a heating mechanism operable to heat the gas to a predetermined temperature.

6. The sintering furnace of claim 1 further comprising a heating mechanism operable to heat the porous support.

7. The sintering furnace of claim 1 , wherein:

the substrate comprises a first surface including the precursor layer and a second surface facing the support; and

friction between the support and the second surface of the substrate is reduced by directing gas of sufficient pressure between the support and the substrate.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 13, 2012
From: ZENERGY POWER GMBH
To: BASF SE
Reel/Frame 028773/0626 →
CHANGE OF NAME Recorded Aug 7, 2012
From: TRITHOR GMBH
To: ZENERGY POWER GMBH
Reel/Frame 028736/0794 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 25, 2012
From: BAECKER, MICHAEL
To: TRITHOR GMBH
Reel/Frame 028630/0764 →
Priority Claims (1)
DE 10 2007 007 567 · Feb 15, 2007 · national
Continuity (2)
Division 12031939 · Feb 15, 2008
Related Publication 20110189621A1 · Aug 4, 2011