IP Library Granted Patent US 9,028,743
Granted Patent B2
US 9,028,743 · App. 13/143,340 · Granted May 12, 2015

Bustle pipe arrangement

Inventors: Jean-Paul Simoes (Walferdange, LU); Lionel Hausemer (Steinsel, LU); Manfred Moller (Wiesbaden-Auringen, DE); Paul Tockert (Berbourg, LU); Rudolf Hebel (Ginsheim-Gustavsburg, DE)
Assignees: Paul Wurth Refractory & Engineering GmbH; Paul Wurth S.A.
F27B1/16C21B7/163C21B9/10F27B1/12F27D1/12F27D3/16
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,028,743
App. No.
13/143,340
Granted
May 12, 2015
Kind
B2
Abstract

There is provided a bustle pipe arrangement of a shaft furnace, in particular for feeding hot gas into the shaft furnace such as e.g. a blast furnace, wherein the bustle pipe arrangement comprises a circumferential bustle pipe arranged along the outer casing of the shaft furnace, at a certain distance therefrom. The arrangement further comprises a plurality of first support arms connecting the bustle pipe to the outer casing of the shaft furnace on a first level; and a plurality of second support arms connecting the bustle pipe to the outer casing of the shaft furnace on a second level, the first level being separate from the second level. The first and second support arms are configured to support the circumferential bustle pipe. First blow channels are arranged through the first support arms for fluidly connecting the bustle pipe to the interior of the shaft furnace.

Claims (23)

1. Bustle pipe arrangement of a shaft furnace for feeding pressurized hot gas into said shaft furnace, said bustle pipe arrangement comprising:

a circumferential bustle pipe arranged along the outer casing of said shaft furnace, at a certain distance therefrom;

a plurality of first support arms connecting said bustle pipe to said outer casing of said shaft furnace on a first level;

a plurality of first blow channels arranged through said plurality of first support arms for fluidly connecting said bustle pipe to the interior of said shaft furnace;

a plurality of second support arms connecting said bustle pipe to said outer casing of said shaft furnace on a second level;

a plurality of second blow channels arranged through said plurality of second support arms for fluidly connecting said bustle pipe to the interior of said shaft furnace; and

a plurality of access ports located in wall portions of the bustle pipe, wherein each one of the plurality of access ports is located opposite to one first blow channel from the plurality of first blow channels or one second blow channel from the plurality of second blow channels, and each one of the plurality of the access ports is in linear alignment with one first blow channel from the plurality of first blow channels or one second blow channel from the plurality of second blow channels corresponding to the access port;

wherein said pluralities of first and second support arms are configured to support said circumferential bustle pipe, said bustle pipe being solely supported by said plurality of first support arms and plurality of second support arms, said first level being different from said second level.

2. Bustle pipe arrangement according to claim 1 , wherein said bustle pipe comprises a refractory lining on its inner wall and wherein said pluralities of first and/or second blow channels extend through said refractory lining of said bustle pipe.

3. Bustle pipe arrangement according to claim 1 , wherein a plunger is associated with at least one access port from said plurality of access ports for at least partially plugging at least one first blow channel from said plurality of first blow channels corresponding to the at least one access port.

4. Bustle pipe arrangement according to claim 3 , wherein said plunger has a conical nose for allowing regulation of gas flow through at least one of the first or at least one of the second blow channel from said plurality of first or second blow channels corresponding to the at least one access port.

5. Bustle pipe arrangement according to claim 3 , wherein said plunger comprises an oxide-ceramic material or a silicon infiltrated silicon carbide material.

6. Bustle pipe arrangement according to claim 1 , wherein an injection nozzle and/or an injection nozzle insert is removably arranged in at least one first blow channel of the plurality of first blow channels, or at least one second blow channel of the plurality of second blow channels.

7. Bustle pipe arrangement according to claim 6 , wherein said second support arms are arranged so as to be, on a vertical projection, arranged half-way between two neighboring first support arms.

8. Bustle pipe arrangement according to claim 1 , wherein each of said plurality of first support arms and/or each of said plurality of second support arms are formed by a piece of piping, lined internally with refractory material and having at least one first blow channel of the plurality of first blow channels and/or at least one second blow channel of the plurality of second blow channels passing there through respectively.

9. Bustle pipe arrangement according to claim 1 , wherein at least one of the first support arm of the plurality of first support arms is essentially horizontal and wherein at least one of the second support arm of the plurality of second support arms is inclined with respect to the horizontal.

10. Bustle pipe arrangement according to claim 1 , wherein at least one of the second support arm of the plurality of second support arms is arranged at an angle chosen such that the access port from the plurality of access ports associated with the second blow channel from the plurality of second blow channels arranged through the at least one second support arm is essentially on the same level as at least one access port from the plurality of the access ports associated with at least one first blow channel from the plurality of first blow channels.

11. Bustle pipe arrangement according to claim 1 , wherein at least one of the first support arms of the plurality of first support arms and at least one of the second support arms of the plurality of second support arms are both inclined at an angle of between 0 and 40° with respect to the horizontal.

12. Bustle pipe arrangement according to claim 11 , wherein said bustle pipe has an essentially round or oval cross-section.

13. The bustle pipe arrangement according to claim 1 , wherein the shaft furnace is a blast furnace.

14. The bustle pipe arrangement according to claim 8 , wherein the piece of piping is a straight piece of piping.

15. The bustle pipe arrangement according to claim 9 , wherein the at least one of second support arm is inclined at an angle between 10 and 60° with respect to the horizontal.

16. Bustle pipe arrangement according to claim 1 , wherein a plunger is associated with at least one access port from said plurality of access ports for at least partially plugging at least one second blow channel from said plurality of second blow channels corresponding to the at least one access port.

Assignments (6)
CORRECTIVE ASSIGNMENT TO CORRECT THE TYPOGRAPHICAL ERROR IN THE FIRST LISTED APPLICATION NUMBER PREVIOUSLY RECORDED AT REEL: 050592 FRAME: 0605. ASSIGNOR(S) HEREBY CONFIRMS THE APPLICATION. Recorded Oct 3, 2019
From: PAUL WURTH REFRACTORY & ENGINEERING
To: PAUL WURTH DEUTSCHLAND GMBH
Reel/Frame 050613/0940 →
CHANGE OF ADDRESS Recorded Oct 3, 2019
From: PAUL WURTH DEUTSCHLAND GMBH
To: PAUL WURTH DEUTSCHLAND GMBH
Reel/Frame 050614/0234 →
MERGER AND CHANGE OF NAME Recorded Oct 1, 2019
From: PAUL WURTH REFRACTORY & ENGINEERING GMBH; PAUL WURTH UMWELTTECHNIK GMBH
To: PAUL WURTH DEUTSCHLAND GMBH
Reel/Frame 050592/0605 →
CHANGE OF NAME Recorded Jun 18, 2019
From: PAUL WURTH UMWELTTECHNIK GMBH
To: PAUL WURTH DEUTSCHLAND GMBH
Reel/Frame 049510/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 4, 2014
From: SIMOES, JEAN-PAUL; HAUSEMER, LIONEL; TOCKERT, PAUL; MOLLER, MANFRED; HEBEL, RUDOLF
To: PAUL WURTH REFRACTORY & ENGINEERING GMBH
Reel/Frame 033026/0777 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 4, 2014
From: SIMOES, JEAN-PAUL; HAUSEMER, LIONEL; TOCKERT, PAUL; MOLLER, MANFRED; HEBEL, RUDOLF
To: PAUL WURTH S.A.
Reel/Frame 033026/0788 →
Priority Claims (1)
EP 09150052 · Jan 5, 2009 · regional
Continuity (1)
Related Publication 20110272868A1 · Nov 10, 2011