IP Library Granted Patent US 8,422,452
Granted Patent B2
US 8,422,452 · App. 13/149,264 · Granted Apr 16, 2013

Communication system and communication controlling method

Inventors: Hajime Zembutsu (Tokyo, JP); Toshiyuki Tamura (Tokyo, JP); Stefan Schmid (Heidelberg, DE); Tarik Taleb (Heidelberg, DE); Gottfried Punz (Heidelberg, DE)
Assignees: NEC Corporation; NEC Europe Ltd.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,422,452
App. No.
13/149,264
Granted
Apr 16, 2013
Kind
B2
Abstract

A communication method in LIPA/SIPTO architecture is provided which, when a user equipment (UE) is to connect from a serving area to an external network, allows re-selection of an optimal gateway. The communication method allows selecting a gateway apparatus physically or topologically close to a site, where the user equipment is attached.

Claims (25)

1. A communication method in Selected IP Traffic Offload (SIPTO) architecture, the method comprising:

a Mobility Management Entity (MME) sending a page signal to a user equipment, when deciding that it is necessary to re-select a gateway apparatus, in a case where the user equipment is in an EPS Connection Management (ECM)-IDLE state;

the user equipment, on reception of the page signal, transmitting a service request to the MME;

the MME, on reception of the service request, sending a deactivate bearer request to a base station;

the base station transmitting an RRC connection reconfiguration to the user equipment;

the user equipment transmitting a notification of completion of the RRC connection reconfiguration to the base station;

the base station transmitting a deactivate bearer response to the MME; and

the user equipment initiating a UE requested PDN connectivity procedure, the gateway apparatus being re-selected in the PDN connectivity procedure.

2. The communication method according to claim 1 , wherein the gateway apparatus includes a serving gateway apparatus (SGW) and a packet data network gateway apparatus (PGW).

3. A communication system in Selected IP Traffic Offload (SIPTO) architecture, the system comprising:

a mobility management entity (MME);

a base station; and

a user equipment, wherein

the MME sends a page signal to the user equipment, when deciding that it is necessary to re-select a gateway apparatus, in a case where the user equipment is in an EPS Connection Management (ECM)-IDLE state,

the user equipment, on reception of the page signal, transmits a service request to the MME,

the MME, on reception of the service request, sends a deactivate bearer request to the base station,

the base station transmits an RRC connection reconfiguration to the user equipment,

the user equipment transmits a notification of completion of the RRC connection reconfiguration to the base station,

the base station transmits a deactivate bearer response to the MME, and

the user equipment initiates a UE requested PDN connectivity procedure, the gateway apparatus being re-selected in the PDN connectivity procedure.

4. The communication system according to claim 3 , wherein the gateway apparatus includes a serving gateway apparatus (SGW) and a packet data network gateway apparatus (PGW).

5. A user equipment in a communication system by Selected IP Traffic Offload (SIPTO) architecture, wherein the user equipment, on reception of a page signal sent, by a mobility management entity (MME) to the user equipment, when the MME decides that it is necessary to re-select a gateway apparatus, in a case where the user equipment is in an EPS Connection Management (ECM)-IDLE state, transmits a service request to the MME,

the MME, on reception of the service request, sending a deactivate bearer request to a base station, the base station transmitting an RRC connection reconfiguration to the user equipment,

the user equipment, on receipt of the RRC connection reconfiguration from the base station, sends a notification of completion of RRC connection reconfiguration to the base station to initiate a UE requested PDN connectivity procedure to cause re-selection of a gateway apparatus to be performed in PDN connectivity procedure.

6. The user equipment according to claim 5 , wherein the gateway apparatus is a serving gateway apparatus (SGW) and a packet data network gateway apparatus (PGW).

Assignments (2)
SECURITY AGREEMENT Recorded Sep 22, 2011
From: PROMONTORY INTERFINANCIAL NETWORK, LLC; PROMNETWORK SERVICES LLC
To: EAGLEBANK
Reel/Frame 026953/0676 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 17, 2011
From: ZEMBUTSU, HAJIME; TAMURA, TOSHIYUKI; SCHMID, STEFAN; TALEB, TARIK; PUNZ, GOTTFRIED
To: NEC CORPORATION; NEC EUROPE LTD.
Reel/Frame 026765/0016 →
Priority Claims (1)
JP 2009-217757 · Sep 18, 2009 · national
Continuity (2)
Division 13131810
Related Publication 20110292912A1 · Dec 1, 2011