IP Library Granted Patent US 10,125,467
Granted Patent B2
US 10,125,467 · App. 13/172,911 · Granted Nov 13, 2018

Template for and method of installing a plurality of foundation elements in an underwater ground formation

Inventors: Boudewijn Casper Jung (Bergen op Zoom, NL); Jan Albert Westerbeek (Spijkenisse, NL)
Assignee: IHC HOLLAND IE B.V.
E02D13/04E02D13/00E02D27/42E02D27/50
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,125,467
App. No.
13/172,911
Granted
Nov 13, 2018
Kind
B2
Abstract

A template for use in installing a plurality of foundation elements, in particular anchor piles, relative to one another in an underwater ground formation is provided. The template includes a plurality of guides for the foundation elements, which guides are fixed relative to one another by means of a frame. At least one of the guides includes a sound-insulating sleeve for surrounding a foundation element during driving.

Claims (29)

1. A removable, reusable template for use in installing a plurality of foundation elements relative to one another in an underwater ground formation, comprising a plurality of guides for the foundation elements, wherein the guides are fixed relative to one another by a frame, wherein at least one of the guides comprises a sound-insulating double wall construction sleeve having at least one air chamber configured to render the template buoyant, the sleeve configured to surround a foundation element during driving, and wherein the guides are configured to be placed on the underwater ground formation during use, the sound-insulating sleeve being tubular, and extending upwardly and surrounding the foundation element from the underwater ground formation to above the water level.

2. The template according to claim 1 , wherein all of the guides comprise a sound-insulating sleeve, said sleeves extending parallel to each other.

3. The template according to claim 1 , wherein the sleeve is movable from one guide to another guide.

4. The template according to claim 1 , comprising three guides.

5. The template according to claim 1 , wherein a wall of the sleeve is made of a composite material.

6. The template according to claim 1 , wherein the sleeve comprises one or more guide elements on its inner wall.

7. The template according to claim 6 , wherein the one or more guide elements are at least near the bottom of the sleeve and in its upper half of the sleeve.

8. The template according to claim 6 , wherein the one or more guide elements comprise a noise damping material.

9. The template according to claim 1 , wherein sleeve reduces the noise input from the driving by at least 10 dB.

10. The template according to claim 1 , wherein the sleeve reduces the noise input from the driving by at least 15 dB for frequencies lower than 1000 Hz.

11. The template according to claim 1 , wherein the buoyancy of the template is at least 60%.

12. The template according to claim 1 , wherein the buoyancy of the template is at least 80%.

13. The template of claim 6 , wherein the guide elements are axially separated from each other so as to provide a guide length to guide the foundation element during driving.

14. The template of claim 1 , wherein the sleeve is configured to stand erect and have an inner wall spaced apart from the foundation element during driving.

15. A method of installing a plurality of foundation elements, relative to one another in an underwater ground formation, comprising:

placing a template comprising a plurality of guides for the foundation elements and at least one tubular sound-insulating sleeve having a double wall construction on the underwater ground formation, the sound-insulating sleeve engaging the underwater ground formation and supporting itself upon the underwater ground formation so as to extend upwardly and surround the foundation element from the underwater ground formation to above a water level,

next inserting a foundation element into the at least one sound-insulating sleeve and driving the foundation element into the underwater ground formation,

lifting the template over ends of the installed foundation elements extending above the underwater ground formation,

placing a jacket over the ends of the installed foundation elements and securing the jacket to the foundation elements;

wherein, at least during driving, the at least one sound-insulating sleeve fully surrounds the foundation element with the double wall construction from the underwater ground formation to above the water level.

16. The method according to claim 15 , wherein all of the guides comprise a sound-insulating sleeve and a foundation element is placed in each of the sleeves and driven into the underwater ground formation.

17. The method according to claim 15 , wherein, after driving a first foundation element into the underwater ground formation, the sleeve is moved to another guide or the template is rotated and placed with another of the guides over the installed foundation element and a second foundation element is placed in the sleeve and driven into the underwater ground formation.

18. The method according to claim 15 , wherein, at least during driving, the clearance between the foundation element and the sleeve is in excess of 30 cm.

19. The method according to claim 15 , wherein water is removed from the sleeve such that, at least during part of driving, at least a driver is separated from an inner wall of the sleeve by air.

20. The template according to claim 1 , wherein the outer diameter of the sleeve is smaller than the inner diameter of the at least one of the guides.

21. The method according to claim 15 , wherein the outer diameter of the at least one sound-insulating sleeve is smaller than the inner diameters of the plurality of guides.

22. A removable, re-usable template for use in installing a plurality of foundation elements relative to one another in an underwater ground formation, comprising:

a plurality of guides for the foundation elements, wherein the guides are fixed relative to one another by a frame, wherein at least one of the guides comprises a sound-insulating sleeve configured to surround a foundation element during driving, and

wherein the guides are configured to be removably placed on the underwater ground formation during use, the sound-insulating sleeve engaging the underwater ground formation and having a double wall cylinder construction supporting itself upon the underwater ground formation so as to extend upwardly and surround the foundation element from the underwater ground formation to above the water level, the double wall construction comprising at least one chamber.

Assignments (4)
NUNC PRO TUNC ASSIGNMENT Recorded Mar 9, 2023
From: IHC HOLLAND IE B.V.
To: IHC IQIP HOLDING B.V.
Reel/Frame 062936/0871 →
CHANGE OF NAME Recorded Mar 9, 2023
From: IHC IQIP HOLDING B.V.
To: IQIP HOLDING B.V.
Reel/Frame 063024/0990 →
CORRECTIVE ASSIGNMENT TO CORRECT THE STREET ADDRESS OF THE ASSIGNEE AND THE INVENTOR'S NAME PREVIOUSLY RECORDED AT REEL: 027022 FRAME: 0575. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT . Recorded Jun 1, 2018
From: JUNG, BOUDEWIJN CASPER; WESTERBEEK, JAN ALBERT
To: IHC HOLLAND IE B.V.
Reel/Frame 046286/0285 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 4, 2011
From: JUNG, BOUDEWIJN CASPER; WESTERBEEK, JAM ALBERT
To: IHC HOLLAND IE B.V.
Reel/Frame 027022/0575 →
Priority Claims (1)
EP 10168348 · Jul 2, 2010 · regional
Continuity (1)
Related Publication 20120014753A1 · Jan 19, 2012