IP Library Granted Patent US 9,376,895
Granted Patent B2
US 9,376,895 · App. 13/218,915 · Granted Jun 28, 2016

Method and apparatus for removing liquid from a gas producing well

Inventors: Joseph Fink (Washington, PA); Richard Michael Wright (Clarksburg, PA)
Assignee: Well Control Technologies, Inc.
E21B43/127F04B47/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,376,895
App. No.
13/218,915
Granted
Jun 28, 2016
Kind
B2
Abstract

A method and apparatus is used for pumping fluid at a wellhead. The apparatus has a support structure that supports a pumping assembly and removes liquid from the well site through a small diameter pipeline as a continuous flow at a constant flow rate.

Claims (45)

1. A method for pumping fluid at a wellhead comprising:

(a) preforming a well center unit comprising: a pumping assembly for pumping fluid from a well; a support structure supporting the assembly; a holding tank having an inflow port, directly connected to the pumping assembly, and an outflow port directly connected to a pipeline to remove liquid from a well site at which the well center unit is provided; and a holding tank pump, wherein the support structure defines a lower cavity and wherein the holding tank pump is positioned within the lower cavity; and,

(b) connecting the preformed well center unit to the wellhead and into the well.

2. A method as recited in claim 1 wherein the holding tank functions as a gas/liquid separation device and allows for depressurization.

3. A method as recited in claim 1 including a power source capable of operating both the pumping assembly and the holding tank pump.

4. A method as recited in claim 3 including warming the fluid in the holding tank so that the fluid will not freeze.

5. A method as recited in claim 4 wherein an exhaust heat from the power source is used to create the warming.

6. A method as recited in claim 3 including:

(a) allowing the fluid in the holding tank to separate to a liquid component, and if there is a gas component, a gas component; and

(b) removing the gas component from the holding tank through a gas outflow conduit and forcing the gas component to a gas pipeline.

7. A method as recited in claim 6 including removing the liquid component at a substantially constant flow rate from the holding tank through the out flow port, wherein the outflow port has a smaller cross-sectional area than the inflow port.

8. A method as recited in claim 7 including anchoring the well center to the wellhead.

9. A method as recited in claim 8 wherein the support structure has a removable gin pole to service the well when necessary.

10. A method as recited in claim 3 including a gas and water metering device housed underneath the support structure.

11. A method as recited in claim 3 including a gas conditioning device located underneath the support structure for preparing gas to be used as fuel for the power source.

12. A method as recited in claim 1 including anchoring the well center to the ground.

13. A method as recited in claim 1 wherein the support structure has a removable gin pole to service the well center unit when necessary.

14. A method as recited in claim 1 wherein the well center is enclosed with a guarding structure in order to prevent access from unwanted persons.

15. A well management center unit comprising:

(a) a pumping assembly for pumping fluid from a well;

(b) a support structure supporting the assembly;

(c) a holding tank having an inflow port, directly connected to the pumping assembly, and an outflow port directly connected to a pipeline to remove liquid from a well site at which the well management center unit is provided; and

(d) a holding tank pump, wherein the support structure defines a lower cavity and wherein the holding tank pump is positioned within the lower cavity.

16. A well management center unit as recited in claim 15 including a power source that operates both the pumping assembly and the holding tank pump.

17. A well management center unit as recited in claim 16 wherein an exhaust heat from power sources warms the liquid in the holding tank.

18. A well management center unit as recited in claim 15 including a removable gin pole.

19. A well management center unit as recited in claim 15 wherein the well management center is enclosed by a guarding structure.

20. A well management center as recited in claim 15 including water and gas metering apparatus within the support structure.

21. A well management center as recited in claim 15 , wherein the holding tank functions as a gas/liquid separation device.

22. A method for pumping fluid at a wellhead comprising:

(a) preforming a well center unit comprising: a pumping assembly for pumping fluid from a well; a support structure for supporting the assembly; a holding tank having an inflow port, directly connected to the pumping assembly, and an outflow port directly connected to a pipeline to remove liquid from a well site at which the well center unit is provided; and a holding tank pump, wherein the support structure defines a lower cavity and wherein the holding tank pump is positioned within the lower cavity; and,

(b) coupling the preformed well center unit to the wellhead and into the well.

23. A method for pumping fluid from a well using a single power source comprising:

(a) preforming a well center unit comprising: a pumping assembly for pumping fluid from a well; a support structure for supporting the assembly; a holding tank having an inflow port, directly connected to the pumping assembly, and an outflow port directly connected to a pipeline to remove liquid from a well site at which the well center unit is provided; a holding tank pump, wherein the support structure defines a lower cavity and wherein the holding tank pump is positioned within the lower cavity; and a power source capable of operating both the pumping assembly and the holding tank pump; and,

(b) anchoring the preformed well center unit to the ground.

24. An apparatus for elevating a pumping assembly comprising:

(a) a pumping assembly for drawing fluid from a well;

(b) a support structure supporting the pumping assembly and elevating the pumping assembly above a lower cavity defined by the support structure; and,

(c) a holding tank pump for forcing the fluid from an outflow port of a holding tank directly to a pipeline to remove liquid from a well site at which the pumping assembly is provided, wherein the holding tank pump is positioned within the lower cavity.

25. An apparatus for elevating a pumping assembly with a single power source comprising:

(a) a pumping assembly for drawing fluid from a well;

(b) a support structure supporting the pumping assembly and elevating the pumping assembly above a lower cavity defined by the support structure;

(c) a holding tank having an inflow port directly connected to the pumping assembly for receiving the fluid from the pumping assembly and an outflow port directly connected to a pipeline to remove liquid from a well site at which the pumping assembly is provided, wherein the holding tank separates the fluid into gas and liquid;

(d) a holding tank pump for forcing the liquid from the outflow port to a pipeline, wherein the holding tank pump is positioned within the lower cavity; and

(e) a power source operably connected to a well pump and the holding tank pump for driving both the well pump and the holding tank pump.

Assignments (6)
SUPPL. NO. 3 TO SECURITY AGREEMENT Recorded May 8, 2020
From: CNX RESOURCES CORPORATION; CNX GAS COMPANY LLC; CNX WATER ASSETS LLC
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 052613/0427 →
SUPPLEMENTAL SECURITY AGREEMENT Recorded Mar 9, 2018
From: CNX GAS COMPANY LLC
To: PNC BANK, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 045540/0954 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 26, 2016
From: WELL CONTROL TECHNOLOGIES, INC.
To: CNX GAS COMPANY, LLC
Reel/Frame 038823/0913 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 24, 2015
From: FINK, JOSEPH M; WRIGHT, RICHARD M
To: CNX GAS COMPANY LLC
Reel/Frame 036177/0380 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 18, 2014
From: CNX GAS COMPANY, LLC
To: WELL CONTROL TECHNOLOGIES, INC.
Reel/Frame 033340/0770 →
SECURITY INTEREST Recorded Jul 18, 2014
From: WELL CONTROL TECHNOLOGIES, INC.
To: CNX GAS COMPANY, LLC
Reel/Frame 033358/0964 →
Continuity (2)
Provisional Application 61377716 · Aug 27, 2010
Related Publication 20120048543A1 · Mar 1, 2012