IP Library Granted Patent US 8,743,566
Granted Patent B2
US 8,743,566 · App. 13/358,829 · Granted Jun 3, 2014

System and method for increasing DC power system efficiency without requiring a large battery reserve

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,743,566
App. No.
13/358,829
Granted
Jun 3, 2014
Kind
B2
Abstract

A system for increasing parallel rectifier DC power system efficiency. In one embodiment, the system includes: (1) a controller configured to sense and classify a load magnitude change into groups including large load transients and moderate load transients and (2) at least one rectifier coupled to the controller and configured to transition from a stand-by mode to an active mode upon an occurrence of one of a large load transient and a moderate load transient.

Claims (24)

1. A system for increasing parallel rectifier DC power system efficiency, comprising:

a controller configured to sense and classify a load magnitude change into groups including large load transients and moderate load transients, wherein said controller is configured to classify a load magnitude change below a predetermined threshold as a moderate load transient, and wherein said controller is configured to classify a load magnitude change above the predetermined threshold as a large load transient; and

a plurality of rectifiers coupled to said controller, wherein said controller is configured to transition at least one of the plurality of rectifiers from a stand-by mode to an active mode upon an occurrence of one of a large load transient and a moderate load transient.

2. The system as recited in claim 1 further comprising a common signal bus coupling at least one rectifier of the plurality of rectifiers to other rectifiers, said common signal bus changing state upon occurrences of said moderate load transients.

3. The system as recited in claim 1 wherein said at least one rectifier includes a pre-charge circuit configured to maintain an output capacitor of said at least one rectifier at a voltage close to a DC distribution system voltage.

4. The system as recited in claim 1 wherein said controller is a central controller, and wherein said at least one rectifier is operable in the stand-by mode, the active mode, and an inactive mode.

5. The system as recited in claim 1 wherein said groups further include a very slow load change.

6. The system as recited in claim 1 wherein all rectifiers in a stand-by mode are configured to transition from said stand-by mode to said active mode upon an occurrence of one of a large load transient and a moderate load transient.

7. The system as recited in claim 1 wherein said controller is configured to store a time of said load magnitude change.

8. The system as recited in claim 1 wherein said controller is configured to report said load magnitude change.

9. The system as recited in claim 1 wherein said controller is configured to use information regarding load magnitude changes over time to determine if said load magnitude changes are predictable.

10. The system as recited in claim 9 wherein said controller is configured to anticipate a future load magnitude change based on said information.

11. A method of increasing parallel rectifier DC power system efficiency, comprising:

sensing and classifying a load magnitude change into groups including large load transients and moderate load transients, wherein a load magnitude change below a predetermined threshold is classified as a moderate load transient, and wherein a load magnitude change above the predetermined threshold is classified as a large load transient; and

transitioning at least one rectifier of a plurality of rectifiers from a stand-by mode to an active mode upon an occurrence of one of a large load transient and a moderate load transient.

12. The method as recited in claim 11 further comprising a common signal bus coupling said at least one rectifier to other rectifiers, said common signal bus changing state upon occurrences of said moderate load transients.

13. The method as recited in claim 11 wherein said at least one rectifier includes a pre-charge circuit configured to maintain an output capacitor of said at least one rectifier at a voltage close to a DC distribution system voltage.

14. The method as recited in claim 11 wherein said controller is a central controller.

15. The method as recited in claim 11 wherein said groups further include a very slow load change.

16. The method as recited in claim 11 wherein all rectifiers in a stand-by mode are configured to transition from said stand-by mode to said active mode upon an occurrence of one of a large load transient and a moderate load transient.

17. The method as recited in claim 11 wherein said controller is configured to store a time of said load magnitude change.

18. The method as recited in claim 11 wherein said controller is configured to report said load magnitude change.

19. The method as recited in claim 11 wherein said controller is configured to use information regarding load magnitude changes over time to determine if said load magnitude changes are predictable.

20. The method as recited in claim 19 wherein said controller is configured to anticipate a future load magnitude change based on said information.

Assignments (8)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 6, 2023
From: ABB SCHWEIZ AG
To: ACLEAP POWER INC.
Reel/Frame 064819/0383 →
CORRECTIVE ASSIGNMENT TO CORRECT THE THE ADDRESS OF THE ASSIGNEE PREVIOUSLY RECORDED AT REEL: 063410 FRAME: 0501. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jul 11, 2023
From: ABB POWER ELECTRONICS INC.
To: ABB SCHWEIZ AG
Reel/Frame 064671/0156 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 20, 2023
From: ABB POWER ELECTRONICS INC.
To: ABB SCHWEIZ AG
Reel/Frame 063410/0501 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 16, 2020
From: ABB SCHWEIZ AG
To: ABB POWER ELECTRONICS INC.
Reel/Frame 052430/0136 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 29, 2019
From: GENERAL ELECTRIC COMPANY
To: ABB SCHWEIZ AG
Reel/Frame 050207/0405 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 25, 2013
From: GE POWER ELECTRONICS, INC.
To: GENERAL ELECTRIC COMPANY
Reel/Frame 029697/0592 →
CHANGE OF NAME Recorded Jan 17, 2013
From: LINEAGE POWER CORPORATION
To: GE POWER ELECTRONICS, INC.
Reel/Frame 029647/0262 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 26, 2012
From: REDDY, RAGHOTHAMA; DAVIS, ROY J.
To: LINEAGE POWER CORPORATION
Reel/Frame 027600/0334 →