Method and plant for filling bottles or containers with continuous calibration

Inventors: Fabio Forestelli (Alseno, IT); Alberto Cirio (Canelli, IT)
Assignees: FT SYSTEM S.R.L.; AROL S.P.A.
B67C3/007B67B3/26B67B3/261
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,266,706
App. No.
13/395,846
Granted
Feb 23, 2016
Kind
B2
Abstract

The present invention refers no a plant for filling bottles or containers with continuous calibration and to a continuous calibration method of such a plant. The calibration method ( 100 ) is characterized in that it comprises the steps consisting of collecting ( 110 ) at least one set of data relating to filling and/or closing parameters of containers or bottles ( 16 ) treated through the same tap or filling valve ( 15 ) of the filling plant ( 10 ) and/or through the same closing and/or capping head ( 14 ) of the filling plant ( 10 ); based on the data collected, calculating ( 120 ) statistical data associated with the tap or filling valve ( 15 ) and/or with the closing and/or capping head ( 14 ); updating ( 130 ) the statistical data based on new data collected and monitoring the progression thereof; in the case of a variation of the statistical data over time, adjusting the tap or filling valve ( 15 ) and/or the closing and/or capping head ( 14 ) associated with the statistical data so as to compensate for the variation.

Claims (12)

1. Plant ( 10 ) for filling containers comprising conveying means on which a plurality of containers ( 16 ) are moved along a direction of forward movement on a main forwarding route of said containers ( 16 ), with there being, arranged in succession along said direction of forward movement, a first station ( 11 ) for filling said containers ( 16 ), said first station comprising a plurality of filling valves ( 15 ), a second station ( 12 ) for capping said containers ( 16 ), said second station comprising a plurality of capping heads ( 14 ) and at least one third control station ( 13 ′, 13 ″) for checking at least one filling parameter, characterised in that said plant ( 10 ) comprises a tracking system ( 18 , 19 , 20 ) for tracking filling valve ( 15 ) and capping head ( 14 ) that acts upon containers ( 16 ), and a processing unit ( 21 ) connected to said at least one third control station ( 13 ′, 13 ″) for receiving filling and closing parameters of said containers ( 16 ) on which said filling valve ( 15 ) and said capping head ( 14 ) act, said processing unit ( 21 ) also being connected to means for adjusting said first station and said second station ( 11 , 12 ) suitable for controlling the operating parameters of said filling valve ( 15 ) and said capping head ( 14 ) that act upon said containers ( 16 ) based on said filling and closing parameters wherein at least one third control station ( 13 ″) is arranged along a secondary branch ( 17 ) parallel to said main forwarding route of said containers ( 16 ).

2. Plant ( 10 ) for filling containers according to claim 1 , characterised in that said conveying means comprise a plurality of discreet positions for said containers ( 16 ), said tracking system comprising a first sensor ( 18 ) suitable for detecting the passage of a first container ( 16 ), a second sensor ( 19 ) associated with a first filling valve ( 15 ), a third sensor ( 20 ) associated with a first capping head ( 14 ) and an encoder associated with said discreet conveying means so as to keep track of the instantaneous positions of said first container ( 16 ), said first filling valve ( 15 ), and said first capping head ( 14 ).

3. Plant ( 10 ) for filling containers according to claim 1 , characterised in that said at least one third control station ( 13 ′, 13 ″) comprises at least one module for measuring the filling level and at least one module for measuring the capping height and a module for measuring the removal torque and the reclosing angle of a cap.

4. Plant ( 10 ) for filling containers according to claim 3 , characterised in that said at least one third control station ( 13 ′, 13 ″) also comprises at least one measuring module selected from the group consisting of:

a module for measuring container side wall tension,

a module for measuring container gas content and/or pressure,

a module for measuring container weight, and

a module for measuring container colour.

5. Plant ( 10 ) for filling containers according to claim 1 , characterised in that said at least one third control station ( 13 ″) arranged along a secondary- branch ( 17 ) comprises at least one module from a module for measuring the removal torque and/or the reclosing angle of a container cap, a module for measuring gas content and/or pressure of a container, a module for measuring the weight of a container and a module for measuring the colour of a container.

6. Plant ( 10 ) for filling containers according to claim 1 , characterised in that said processing unit ( 21 ) comprises software means ( 22 ) suitable for implementing the method ( 100 ) for calibrating a plant ( 10 ) for filling containers by collecting ( 110 ) at least one set of data relating to filling and closing parameters of containers ( 16 ) treated through the same filling valve ( 15 ) of said filling plant ( 10 ) and through the same capping head ( 14 ) of said filling plant ( 10 );

based on said collected data, calculating ( 120 ) statistical data associated with said filling valve ( 15 ) and/or with said closing capping head ( 14 );

updating ( 130 ) said statistical data based on new data collected and monitoring the progression thereof over time; in the case of a variation over time of said statistical data, adjusting ( 140 ) said filling valve ( 15 ) and capping head ( 14 ) associated with said statistical data so as to compensate for said variation.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 23, 2012
From: FORESTELLI, FABIO; CIRIO, ALBERTO
To: FT SYSTEM S.R.L.; AROL S.P.A.
Reel/Frame 028256/0430 →
Priority Claims (1)
IT MI2009A001570 · Sep 14, 2009 · national
Continuity (1)
Related Publication 20120222387A1 · Sep 6, 2012