IP Library › Granted Patent US 9,051,811
Granted Patent B2
US 9,051,811 · App. 13/434,047 · Granted Jun 9, 2015

Barrier valve system and method of controlling same with tubing pressure

Inventor: Terry R. Bussear (Spring, TX)
Assignee: Baker Hughes Incorporated
E21B34/10E21B43/128
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,051,811
App. No.
13/434,047
Granted
Jun 9, 2015
Kind
B2
Abstract

A completion system including a barrier valve operatively arranged in a tubing string to selectively impede fluid flow through a lower completion. At least one control line is included for supplying a control line pressure for controlling operation of the barrier valve. The at least one control line is operatively arranged with the tubing string for enabling tubing pressure in the tubing string to determine the control line pressure. A method of operating a barrier valve is also included.

Claims (31)

1. A completion system comprising:

a barrier valve operatively arranged in a tubing string to selectively impede fluid flow through a lower completion; and

at least one control line extending between the tubing string and a stroker tool including a hydraulic actuator and a shifting sleeve, the stroker tool mechanically shifting the barrier valve in response to the control line pressure, the at least one control line operatively arranged with the tubing string for enabling tubing pressure in the tubing string to determine the control line pressure the system further including a plug interactive with a nipple to deliver tubing pressure to the at least one control line.

2. The completion system of claim 1 , wherein the barrier valve comprises a sliding sleeve.

3. The completion system of claim 1 , wherein the barrier valve is part of an intermediate completion assembly that also includes a packer device for both isolating the lower completion and a borehole in which the lower completion is positioned.

4. A completion system comprising:

a barrier valve operatively arranged in a tubing string to selectively impede fluid flow through a lower completion; and

at least two control lines extending between the tubing string and a stroker tool including a hydraulic actuator and a shifting sleeve, the stroker tool mechanically shifting the barrier valve in response to the control line pressure, the at least two control lines operatively arranged with the tubing string for enabling tubing pressure in the tubing string to determine the control line pressure and each of which are conditionable to respond to tubing pressure to stroke the stroker in a direction or an opposite direction.

5. A completion system comprising:

a barrier valve operatively arranged in a tubing string to selectively impede fluid flow through a lower completion; and

at least one control line extending between the tubing string and a stroker tool including a hydraulic actuator and a shifting sleeve, the stroker tool mechanically shifting the barrier valve in response to the control line pressure, the at least one control line operatively arranged with the tubing string for enabling tubing pressure in the tubing string to determine the control line pressure and wherein the system further includes a plug having a pathway defined therein that leads to tubing pressure at one end and to the at least one control line at the other end.

6. A completion system comprising:

a barrier valve operatively arranged in a tubing string to selectively impede fluid flow through a lower completion; and

at least one control line extending between the tubing string and a stroker tool including a hydraulic actuator and a shifting sleeve, the stroker tool mechanically shifting the barrier valve in response to the control line pressure, the at least one control line operatively arranged with the tubing string for enabling tubing pressure in the tubing string to determine the control line pressure, the system further comprising an upper completion operatively coupled with the barrier valve for closing the barrier valve when the upper completion is withdrawn.

7. A method of operating a barrier valve, comprising:

setting a tubing pressure in a tubing string by pressurizing a fluid;

supplying the tubing pressure to at least one control line;

setting a control line pressure in the at least one control line with the tubing pressure; and

operating a barrier valve with the control line pressure through a stroker tool that mechanically shifts the barrier valve, the barrier valve positioned as part of an intermediate completion assembly run in on a production string pressurizing up on an isolation sleeve run in with the production string for setting a packer device of the intermediate completion assembly, the method further comprising stacking at least one subsequent intermediate assembly with the intermediate completion assembly, the subsequent intermediate assembly having a subsequent barrier valve operatable by the control line pressure for functionally replacing the barrier valve.

8. The method of claim 7 , wherein the barrier valve is part of a lower completion.

9. A method of operating a barrier valve, comprising:

setting a tubing pressure in a tubing string by pressurizing a fluid;

supplying the tubing pressure to at least one control line;

setting a control line pressure in the at least one control line with the tubing pressure; and

operating a barrier valve with the control line pressure through a stroker tool that mechanically shifts the barrier valve, the barrier valve positioned as part of an intermediate completion assembly run in on a production string

pressurizing up on an isolation sleeve run in with the production string for setting a packer device of the intermediate completion assembly, the method further comprising running a plug having a pathway defined therein that leads to tubing pressure at one end and to one of the at least one control line operatively arranged to close the barrier valve at an opposite end.

10. A method of operating a barrier valve, comprising:

setting a tubing pressure in a tubing string by pressurizing a fluid;

supplying the tubing pressure to at least one control line;

setting a control line pressure in the at least one control line with the tubing pressure; and

operating a barrier valve with the control line pressure through a stroker tool that mechanically shifts the barrier valve, the barrier valve positioned as part of an intermediate completion assembly run in on a production string pressurizing up on an isolation sleeve run in with the production string for setting a packer device of the intermediate completion assembly, the method further comprising replacing the isolation sleeve with a plug, pressuring up on the tubing pressure, and directing the tubing pressure to one of the at least one control lines operatively arranged to open the barrier valve with the control line pressure.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 11, 2012
From: FRISBY, RAYMOND A.; PHILLIPS, JEFFREY S.; NELSON, ROY N.; LAUDERDALE, DONALD; BUSSEAR, TERRY R.
To: BAKER HUGHES INCORPORATED
Reel/Frame 028353/0128 →
Continuity (3)
Continuation In Part 12970559 · Dec 16, 2010
Continuation In Part 13414341 · Mar 7, 2012
Related Publication 20130075109A1 · Mar 28, 2013