IP Library Granted Patent US 8,913,406
Granted Patent B2
US 8,913,406 · App. 13/491,673 · Granted Dec 16, 2014

Paralleled power converters with auto-stagger start-up

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,913,406
App. No.
13/491,673
Granted
Dec 16, 2014
Kind
B2
Abstract

A power conversion system includes a shared output bus and a plurality of power conversion units coupled to the shared output bus. Each power conversion unit includes a power converter having a converter output coupled to the shared output bus and a delay generator that generates a start-up delay for the power converter if a pre-bias value of a bus voltage on the shared output bus is greater than a predefined threshold. Each power conversion unit also includes a voltage controller that controls the converter output subsequent to the start-up delay and maintains a current sourcing condition of the converter output during start-up of the power converter. The power conversion system also includes a load that is coupled to the shared output bus. A method of operating a power conversion unit is also provided.

Claims (37)

1. A power conversion unit, comprising:

a power converter having a converter output coupled to a shared output bus;

a delay generator configured to generate a start-up delay for the power converter, wherein the delay generator is configured to activate the start-up delay if a pre-bias value of a bus voltage on the shared output bus is greater than a predefined threshold, wherein the start-up delay is greater than a worst-case ramp time of a setpoint output voltage on the shared output bus; and

a voltage controller configured to control the converter output subsequent to the start-up delay and maintain a current sourcing condition of the converter output during start-up of the power converter.

2. The power conversion unit as recited in claim 1 wherein the start-up delay is selected from the group consisting of:

a random length of time with minimum and maximum time limits; and

a fixed length of time.

3. The power conversion unit as recited in claim 1 wherein the start-up delay is one of a set of delays including different lengths of time.

4. The power conversion unit as recited in claim 1 wherein the predefined threshold is a magnitude of the pre-bias value that allows a non-damaging start-up of the power converter.

5. The power conversion unit as recited in claim 1 further comprising an initialization check delay prior to generation of the start-up delay.

6. The power conversion unit as recited in claim 5 wherein the initialization check delay includes a fixed length of time plus a random length of time selected with minimum and maximum time limits.

7. A method of operating a power conversion unit, comprising:

measuring a bus voltage on a shared output bus prior to start-up of a power converter;

generating a start-up delay for the power converter when a pre-bias value of the bus voltage on the shared output bus is greater than a predefined threshold, wherein the start-up delay is greater than a worst-case ramp time of a setpoint output voltage on the shared output bus; and

controlling the power converter subsequent to the start-up delay to maintain a current sourcing condition during start-up of the power converter.

8. The method as recited in claim 7 wherein generating the start-up delay includes selecting the start-up delay from the group consisting of:

a random length of time with minimum and maximum time constraints; and

a fixed length of time.

9. The method as recited in claim 7 wherein generating the start-up delay includes selecting the start-up delay from a set of delays providing different lengths of time.

10. The method as recited in claim 7 wherein generating the start-up delay includes the predefined threshold being a magnitude of the pre-bias value that allows a non-damaging start-up of the power converter.

11. The method as recited in claim 7 further comprising providing an initialization check delay prior to measuring the bus voltage.

12. The method as recited in claim 11 wherein providing the initialization check delay includes the initialization check delay being a fixed length of time plus a randomly selected length of time with minimum and maximum time constraints.

13. A power conversion system, comprising:

a shared output bus;

a plurality of power conversion units coupled to the shared output bus, each power conversion unit including:

a power converter having a converter output coupled to the shared output bus,

a delay generator that generates a start-up delay for the power converter if a pre-bias value of a bus voltage on the shared output bus is greater than a predefined threshold, wherein the start-up delay is greater than a worst-case ramp time of a setpoint output voltage on the shared output bus, and

a voltage controller that controls the converter output subsequent to the start-up delay and maintains a current sourcing condition of the converter output during start-up of the power converter; and

a load that is coupled to the shared output bus.

14. The power conversion system as recited in claim 13 wherein the start-up delay is selected from the group consisting of:

a random length of time with minimum and maximum time limits; and;

a fixed length of time.

15. The power conversion system as recited in claim 13 wherein the start-up delay is one of a set of delays including different lengths of time.

16. The power conversion system as recited in claim 13 wherein the start-up delay is greater than a worst-case soft start period of the plurality of power conversion units.

17. The power conversion system as recited in claim 13 wherein the predefined threshold is a magnitude of the pre-bias value that allows a non-damaging start-up of each of the plurality of power conversion units.

18. The power conversion system as recited in claim 13 further comprising providing an initialization check delay prior to generation of the start-up delay for at least a portion of the plurality of power conversion units.

19. The power conversion system as recited in claim 18 wherein the initialization check delay includes a fixed length of time plus a randomly selected length of time with minimum and maximum time limits.

Assignments (6)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 6, 2023
From: ABB SCHWEIZ AG
To: ACLEAP POWER INC.
Reel/Frame 064819/0383 →
CORRECTIVE ASSIGNMENT TO CORRECT THE THE ADDRESS OF THE ASSIGNEE PREVIOUSLY RECORDED AT REEL: 063410 FRAME: 0501. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jul 11, 2023
From: ABB POWER ELECTRONICS INC.
To: ABB SCHWEIZ AG
Reel/Frame 064671/0156 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 20, 2023
From: ABB POWER ELECTRONICS INC.
To: ABB SCHWEIZ AG
Reel/Frame 063410/0501 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 16, 2020
From: ABB SCHWEIZ AG
To: ABB POWER ELECTRONICS INC.
Reel/Frame 052430/0136 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 29, 2019
From: GENERAL ELECTRIC COMPANY
To: ABB SCHWEIZ AG
Reel/Frame 050207/0405 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 8, 2012
From: GUTHRIE, STEPHEN; PAL, SUBARNA
To: GENERAL ELECTRIC COMPANY
Reel/Frame 028340/0114 →