IP Library Granted Patent US 9,351,204
Granted Patent B2
US 9,351,204 · App. 13/579,398 · Granted May 24, 2016

Method for controlling handover, user equipment, base station, and radio communication system

Inventor: Hiroaki Takano (Tokyo, JP)
Assignee: SONY CORPORATION
H04W36/0072H04L1/0046H04L5/0007H04L5/0053H04W72/082
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,351,204
App. No.
13/579,398
Granted
May 24, 2016
Kind
B2
Abstract

Provided is a method for controlling a handover from a first base station to a second base station by a user equipment that performs radio communication over a communication channel formed by aggregating a plurality of component carriers, wherein scheduling information on each component carrier is transmitted to the user equipment according to either of a straight scheduling method and a cross scheduling method, and the method includes at the first base station, commanding first the user equipment to perform a handover from the first base station to the second base station on a second component carrier to be operated according to the straight scheduling method in the second base station, when it is determined that a handover on a first component carrier following the cross scheduling method is to be executed.

Claims (61)

1. A method for controlling a handover from a first base station to a second base station by a user equipment that performs radio communication over a communication channel formed by carrier aggregation of a plurality of component carriers, the method comprising:

transmitting, from the first base station to the user equipment, scheduling information on each component carrier according to a scheduling information transmission method that is either one of a straight scheduling method and a cross scheduling method;

determining, by the first base station, whether a second component carrier is an extension carrier of a first component carrier to be operated according to the cross scheduling method, the second component carrier being equal to the first component carrier;

changing, by the first base station, the scheduling information transmission method on the first component carrier from the cross scheduling method to the straight scheduling method on the first component carrier before performance of the handover;

commanding, by the first base station when the second component carrier is the extension carrier of the first component carrier, the user equipment to perform the handover on the first component carrier from the first base station to the second base station according to the cross scheduling method; and

commanding, by the first base station, the user equipment to perform the handover on the second component carrier from the first base station to the second base station according to the straight scheduling method.

2. The method according to claim 1 , wherein when the second component carrier is the extension carrier of the first component carrier, the first base station further commands the user equipment to perform the handover on the second component carrier in which a channel for transmitting the scheduling information on the first component carrier is positioned before the handover on the first component carrier.

3. The method according to claim 1 , wherein

the first base station receives a change request to change the scheduling information transmission method from the user equipment, and

the first base station changes the scheduling information transmission method on the first component carrier from the cross scheduling method to the straight scheduling method according to the change request.

4. The method according to claim 1 , wherein the first base station changes the scheduling information transmission method on the first component carrier from the cross scheduling method to the straight scheduling method after a handover request is confirmed by the second base station.

5. The method according to claim 1 , wherein

the second component carrier is operated according to the straight scheduling method in the second base station after the handover is performed.

6. The method according to claim 1 , further comprising:

receiving, by the first base station, measurement information from the user equipment; and

determining, by the first base station, whether the handover is necessary according to the measurement information transmitted from the user equipment.

7. The method according to claim 1 , further comprising:

modifying, by the first base station before the determining, a scheduling information transmission method so that the second component carrier is the extension carrier of the first component carrier.

8. A user equipment, comprising:

a radio communication circuit that performs radio communication with a base station over a communication channel formed by carrier aggregation of a plurality of component carriers;

a control circuit that controls a handover from a first base station to a second base station by the radio communication circuit; and

a quality measuring circuit that measures a channel quality of the communication channel between the user equipment and the first base station, wherein

the radio communication circuit is configured to

receive, from the first base station, scheduling information on each component carrier according to a scheduling information transmission method that is either one of a straight scheduling method and a cross scheduling method,

receive a command, from the first base station when a second component carrier is an extension carrier of a first component carrier to be operated according to the cross scheduling method, the second component carrier being equal to the first component carrier, to perform the handover on the first component carrier from the first base station to the second base station according to the cross scheduling method, and

receive a command from the first base station to perform the handover on the second component carrier from the first base station to the second base station according to the straight scheduling method,

the control circuit is configured to perform the handover from the first base station to the second base station, and

the first base station changes the scheduling information transmission method on the first component carrier from the cross scheduling method to the straight scheduling method on the first component carrier before performance of the handover.

9. The user equipment according to claim 8 , wherein the radio communication circuit is configured to receive, when the second component carrier is the extension carrier of the first component carrier, the command to perform the handover on the second component carrier in which a channel for transmitting the scheduling information on the first component carrier is positioned before the handover on the first component carrier.

10. The user equipment according to claim 8 , wherein

the radio communication circuit is further configured to transmit, to the first base station, a change request to change the scheduling information transmission method, and

the first base station changes the scheduling information transmission method on the first component carrier from the cross scheduling method to the straight scheduling method according to the change request.

11. The user equipment according to claim 8 , wherein the first base station changes the scheduling information transmission method on the first component carrier from the cross scheduling method to the straight scheduling method after a handover request is confirmed by the second base station.

12. The user equipment according to claim 8 , wherein

the second component carrier is operated according to the straight scheduling method in the second base station after the handover is performed.

13. The user equipment according to claim 8 , wherein the radio communication circuit transmits the channel quality, measured by the quality measuring circuit, to the base station.

14. A base station, comprising:

a radio communication circuit that performs radio communication with a user equipment over a communication channel formed by carrier aggregation of a plurality of component carriers; and

a control circuit that controls a handover to a second base station by the user equipment, the control circuit is configured to determine whether a second component carrier is an extension carrier of a first component carrier to be operated according to the cross scheduling method, the second component carrier being equal to the first component carrier, wherein

the radio communication circuit is configured to

transmit scheduling information on each component carrier according to either one of a straight scheduling method and a cross scheduling method,

change the scheduling information transmission method on the first component carrier from the cross scheduling method to the straight scheduling method on the first component carrier before performance of the handover,

transmit, to the user equipment when the second component carrier is the extension carrier of the first component carrier, a command to perform the handover on the first component carrier from the base station to the second base station according to the cross scheduling method, and

transmit a command to the user equipment to perform the handover on the second component carrier from the base station to the second base station according to the straight scheduling method.

15. The base station according to claim 14 , wherein the radio communication circuit is configured to transmit, when the second component carrier is the extension carrier of the first component carrier, the command from the control circuit to the user equipment to perform the handover on the second component carrier in which a channel for transmitting the scheduling information on the first component carrier is positioned before the handover on the first component carrier.

16. The base station according to claim 14 , wherein

the base station receives a change request to change the scheduling information transmission method from the user equipment, and

the control circuit changes the scheduling information transmission method on the first component carrier from the cross scheduling method to the straight scheduling method according to the change request.

17. The base station according to claim 14 , wherein the control circuit changes the scheduling information transmission method on the first component carrier from the cross scheduling method to the straight scheduling method after a handover request is confirmed by the other base station.

18. The base station according to claim 14 , wherein

the second component carrier is operated according to the straight scheduling method in the other base station after the handover is performed.

19. A radio communication system, comprising:

a user equipment that performs radio communication over a communication channel formed by carrier aggregation of a plurality of component carriers;

a first base station that provides the user equipment with a service over the communication channel; and

a second base station that is a target of a handover from the first base station by the user equipment, wherein

the first base station includes circuitry configured to

transmit, to the user equipment, scheduling information on each component carrier to the user equipment according to a scheduling information transmission method that is either one of a straight scheduling method and a cross scheduling method,

determine whether a second component carrier is an extension carrier of a first component carrier to be operated according to the cross scheduling method, the second component carrier being equal to the first component carrier,

change the scheduling information transmission method on the first component carrier from the cross scheduling method to the straight scheduling method on the first component carrier before performance of the handover,

transmit, when the second component carrier is the extension carrier of the first component carrier, a command to the user equipment to perform the handover on the first component carrier from the first base station to the second base station according to the cross scheduling method, and

transmit a command to the user equipment to perform the handover on the second component carrier from the first base station to the second base station according to the straight scheduling method.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 23, 2012
From: TAKANO, HIROAKI
To: SONY CORPORATION
Reel/Frame 028837/0027 →
Priority Claims (1)
JP 2010-040464 · Feb 25, 2010 · national
Continuity (1)
Related Publication 20120314606A1 · Dec 13, 2012