Method for turndown of a liquefied natural gas (LNG) plant

Inventors: Sivert Vist (Hundhamaren, NO); Tore Løland (Stavanger, NO); Morten Svenning (Hammerfest, NO); Silja Eriksson Gylseth (Oslo, NO)
Assignee: EQUINOR ENERGY AS
F25J1/0022F25J1/0245F25J1/0247F25J1/0248F25J2210/04F25J2210/62F25J2220/62F25J2245/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,907,896
App. No.
13/580,977
Granted
Feb 2, 2021
Kind
B2
Abstract

A method for turndown of a liquefied natural gas (LNG) plant, the plant including a liquefaction unit arranged in a flow path of the plant, includes removing LNG from a first location in the flow path downstream of the liquefaction unit; vaporizing the removed LNG, or heating the removed LNG so that the removed LNG is transformed to gas phase; and re-admitting the vaporized or transformed LNG to the flow path at a second location upstream of the liquefaction unit. A corresponding LNG plant is also provided.

Claims (20)

1. A method for operation of a liquefied natural gas (LNG) plant, wherein the plant comprises:

an inlet for receiving natural gas;

a CO 2 removal unit;

a drying and mercury-removal unit;

a pre-cooling or refrigeration unit;

a liquefaction unit;

an end flash or N 2 stripping unit; and

an LNG storage tank;

wherein natural gas enters at the inlet, flows along a flow path through the CO 2 removal unit, the drying and mercury-removal unit, the pre-cooling or refrigeration unit, the liquefaction unit and end flash or N 2 stripping unit in turn and is stored as liquefied natural gas in the LNG storage tank and is stored as liquefied natural gas in the storage tank;

the plant further comprising

an LNG pump connected to the end flash or N 2 stripping unit; and

an LNG vaporizer connected to the LNG pump;

the method comprising the steps of:

removing LNG from the end flash or N 2 stripping unit;

passing the removed LNG through the LNG pump, to pump the removed LNG to a pressure of about 5-10 MPa;

passing the pressurized LNG to the LNG vaporizer to vaporize the pressurized LNG so that the pressurized LNG is transformed to gas phase; and

re-admitting the vaporized LNG to the flow path at a point downstream of the inlet and upstream of the liquefaction unit; and

wherein the method is carried out during turndown of the LNG plant, when the LNG storage tank is full or when there is an interruption in supply of natural gas through the inlet, and the method is carried on until the LNG can be loaded from the LNG storage tank, or the supply of natural gas at the inlet is recommenced.

2. The method according to claim 1 , wherein the vaporized LNG is re-admitted at a rate less than the plant's full production rate.

3. The method according to claim 2 , wherein the vaporized LNG is re-admitted at a rate that corresponds to about 30% of the plant's full production rate or the turndown rate of the plant.

Assignments (2)
CHANGE OF NAME Recorded Sep 29, 2020
From: STATOIL PETROLEUM AS
To: EQUINOR ENERGY AS
Reel/Frame 053915/0567 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 6, 2012
From: VIST, SIVERT; LOLAND, TORE; SVENNING, MORTEN; GYLSETH, SILJA ERIKSSON
To: STATOIL PETROLEUM AS
Reel/Frame 029250/0507 →
Priority Claims (1)
NO 20100285 · Feb 26, 2010 · national
Continuity (1)
Related Publication 20130042645A1 · Feb 21, 2013