IP Library Granted Patent US 9,250,075
Granted Patent B2
US 9,250,075 · App. 13/723,928 · Granted Feb 2, 2016

Generating travel time data

Inventors: Charles Linfield Davies (Woodgreen, GB); Peter Robert John Lilley (Hindhead, GB)
G01C21/00G01C21/34
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,250,075
App. No.
13/723,928
Granted
Feb 2, 2016
Kind
B2
Abstract

The generation of travel time data is disclosed in which coordinates are received for a starting location ( 1901 ). A maximum travel time is received ( 1903 ) and processed graph data is read that includes nodes representing pre-filtered map features and edges representing travel times between nodes. A temporary graph is built ( 1907 ) of selected nodes that can be reached via selected edges within the maximum travel time. Candidate destinations are received ( 1908 ) and the travel time to these candidate destinations is tested ( 1909 ) with reference to the temporary graph.

Claims (20)

1. A method of generating travel time data, comprising the steps of:

receiving coordinates for a starting location;

receiving a maximum travel time;

reading processed graph data comprising nodes representing pre-filtered map features and edges representing travel times between said nodes;

building a temporary graph of selected nodes that can be reached via selected edges within said maximum travel time;

receiving candidate destinations; and

testing the travel time to said candidate destinations with reference to said temporary graph,

wherein coordinates of each candidate destination are transformed to a modified destination at the location of a node in said processed graph data,

wherein coordinates of each candidate destination are transformed with reference to a binary space partitioning tree data structure produced by dividing a region of interest repeatedly until each sub-region contains only one of said graph nodes.

2. The method of claim 1 , wherein said edges represent variable travel times between adjacent nodes that are dependent upon a temporal component derived from non-exclusively one or more of the following, comprising: time of day, day of the week, time of the year and special activity periods; and

said temporary graph is built with reference to a time of travel so as to account for said temporal component.

3. The method of claim 1 , wherein coordinates of an actual starting location are transformed to a modified origin at the location of a node in said processed graph data.

4. The method of claim 1 , wherein each candidate destination is transformed upon arrival, in preference to said building step, thereby reducing the building of said temporary graph to a background process.

5. The method of claim 1 , wherein a candidate destination is rejected if it has a location that is displaced from a starting location by a first predetermined distance.

6. The method of claim 1 , wherein a candidate destination is rejected if it has a location that is displaced from a nearest node by a second predetermined distance.

7. The method of claim 1 , wherein said processed graph data is produced by processing map data to remove features that are not travel related.

8. The method of claim 1 , wherein said map data is processed a plurality of times to produce a plurality of processed graph data sets, applicable to respective modes of transport.

9. The method of claim 1 , wherein a travel time for each selected node is calculated by subtracting travel times between nodes from said maximum travel time.

10. The method of claim 1 , wherein said testing step identifies destinations that can be reached within said maximum travel time and returns data that identifies each candidate with an indication of travel time.

11. The method of claim 10 , wherein said identified candidates are ranked in terms of travel time.

Assignments (2)
CHANGE OF NAME Recorded Jan 14, 2025
From: IGEOLISE LIMITED
To: TRAVELTIME TECHNOLOGIES LTD
Reel/Frame 069894/0774 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 19, 2018
From: DAVIES, CHARLES LINFIELD; LILLEY, PETER ROBERT JOHN
To: IGEOLISE LIMITED
Reel/Frame 045264/0846 →
Priority Claims (1)
GB 11 22 383.1 · Dec 23, 2011 · national
Continuity (1)
Related Publication 20130166204A1 · Jun 27, 2013