IP Library › Granted Patent US 9,119,196
Granted Patent B2
US 9,119,196 · App. 13/814,923 · Granted Aug 25, 2015

Base station, terminal, transmission method, and reception method

Inventors: Akihiko Nishio (Kanagawa, JP); Seigo Nakao (Kanagawa, JP); Yasuaki Yuda (Kanagawa, JP); Ayako Horiuchi (Kanagawa, JP); Sujuan Feng (Frankfurt am Main, DE); Michael Einhaus (Darmstadt, DE)
Assignee: Panasonic Intellectual Property Corporation of America
H04W72/042H04L5/0007H04L5/0053H04L5/0055
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,119,196
App. No.
13/814,923
Granted
Aug 25, 2015
Kind
B2
Abstract

Provided are a base station, whereby the erroneous detection of control information can be reduced, thereby preventing the degradation of the system throughput. A base station ( 100 ) maps a downstream allocation control information unit, which is addressed to a terminal ( 200 ), to a first resource region, which can be used for any of a downstream control channel region and a downstream data channel region, or to a second resource region, which can be used only for the downstream control channel, so as to transmit the downstream allocation control information unit. In the base station ( 100 ), a control unit ( 102 ) establishes a scale of the PDCCH region, and a transmission region establishing unit ( 131 ) establishes, on the basis of a scale value established by the control unit ( 102 ), a mapping region to which the DCI is mapped within the R-PDCCH region and the PDCCH region.

Claims (32)

1. A base station apparatus comprising:

a mapper which, in operation, maps downlink control information to both of a first resource region and a second resource region included in a subframe or only to the second resource region, the first resource region being available for a downlink control channel and a downlink data channel, the second resource region being available for the downlink control channel, wherein the mapping section maps the downlink control information only to the second resource region in a special subframe having a gap period for switching between a downlink and an uplink in time division duplex (TDD); and

a transmitter which, in operation, transmits the mapped downlink control information.

2. The base station apparatus according to claim 1 , wherein

the first resource region is an extended Physical Downlink Control Channel (extended PDCCH) that is defined in a Physical Downlink Shared Channel (PDSCH) which follows a Physical Downlink Control Channel (PDCCH) in a time domain; and

the second resource region is the PDCCH.

3. The base station apparatus according to claim 2 , wherein

the extended PDCCH is a region defined in a data region of the subframe.

4. The base station apparatus according to claim 1 , wherein

the mapper switches between mapping the downlink control information to both of the first resource region and the second resource region or only to the second resource region, based on whether a number of OFDM symbols being for use for the downlink control channel is smaller than a specified number or the number of OFDM symbols is equal to or larger than the specified number.

5. The base station apparatus according to claim 1 , wherein

the mapper configures whether to map the downlink control information to both of the first resource region and the second resource region or only to the second resource region per subframe.

6. The base station apparatus according to claim 1 , wherein

the mapper configures whether to map the downlink control information to both of the first resource region and the second resource region or only to the second resource region per subset of subframes.

7. The base station apparatus according to claim 1 , wherein

the transmitter further transmits subframe pattern information indicating the subframe where the downlink control information can be mapped on the first resource region, according to a same period as a measSubframePattern.

8. A communication method comprising:

mapping downlink control information to both of a first resource region and a second resource region included in a subframe or only to the second resource region, the first resource region being available for a downlink control channel and a downlink data channel, the second resource region being available for the downlink control channel, wherein the mapping of the downlink control information is performed only to the second resource region in a special subframe having a gap period for switching between a downlink and an uplink in time division duplex (TDD); and

transmitting the mapped downlink control information.

9. The communication method according to claim 8 , wherein

the first resource region is an extended Physical Downlink Control Channel (extended PDCCH) that is defined in a Physical Downlink Shared Channel (PDSCH) which follows a Physical Downlink Control Channel (PDCCH) in a time domain; and

the second resource region is the PDCCH.

10. The communication method according to claim 9 , wherein

the extended PDCCH is a region defined in a data region of the subframe.

11. The communication method according to claim 8 , wherein

in the mapping of the downlink control information, whether to map the downlink control information to both of the first resource region and the second resource region or only to the second resource region is switched based on whether a number of OFDM symbols being for use for the downlink control channel is smaller than a specified number or the number of OFDM symbols is equal to or larger than the specified number.

12. The communication method according to claim 8 , further comprising:

configuring whether to map the downlink control information to both of the first resource region and the second resource region or only to the second resource region per subframe.

13. The communication method according to claim 8 , further comprising:

configuring whether to map the downlink control information to both of the first resource region and the second resource region or only to the second resource region per subset of subframes.

14. The communication method according to claim 8 , further comprising:

transmitting subframe pattern information indicating the subframe where the downlink control information can be mapped on the first resource region, according to a same period as a measSubframePattern.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 29, 2016
From: PANASONIC INTELLECTUAL PROPERTY CORPORATION OF AMERICA
To: SUN PATENT TRUST
Reel/Frame 038299/0156 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 27, 2014
From: PANASONIC CORPORATION
To: PANASONIC INTELLECTUAL PROPERTY CORPORATION OF AMERICA
Reel/Frame 033033/0163 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 29, 2013
From: NISHIO, AKIHIKO; NAKAO, SEIGO; YUDA, YASUAKI; HORIUCHI, AYAKO; FENG, SUJUAN; EINHAUS, MICHAEL
To: PANASONIC CORPORATION
Reel/Frame 030498/0458 →
Priority Claims (2)
JP 2010-199882 · Sep 7, 2010 · national
JP 2011-153663 · Jul 12, 2011 · national
Continuity (1)
Related Publication 20130136095A1 · May 30, 2013