IP Library Granted Patent US 9,034,621
Granted Patent B2
US 9,034,621 · App. 13/848,112 · Granted May 19, 2015

Method and device for operating a fermentation plant

Inventor: Karlgünter Eggersmann (Marienfeld, DE)
Assignee: ZEROWASTE ENERGY, LLC
C12P5/023C12M21/04C12M47/18Y02E50/343
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,034,621
App. No.
13/848,112
Granted
May 19, 2015
Kind
B2
Abstract

A method for operating a fermentation plant with at least one digester that is supplied with a substrate. The substrate is percolated using a percolate from a percolate container and biogas that is generated via the percolation process in the digester or/and in the percolate container is drawn off. The drawn off biogas is treated in a biogas treatment device and the CO 2 -containing exhaust gas that is generated during the treatment is introduced into the digester using a purge line, for forcing out and drawing off the biogas that was generated in the digester. Alternatively CO 2 -containing biogas that was generated in an additional digester in a different fermentation process can be introduced into the digester for forcing out and drawing off the biogas that was generated in the digester. The CO 2 -containing purge gas is forced to pass through the substrate dislodging any trapped biogas.

Claims (14)

1. A method for operating a fermentation plant having at least a first digester ( 1 ) to which a substrate to be digested ( 1 a ) is supplied and a least one additional digester, the method comprising:

percolating the substrate to be digested ( 1 a ) with a percolate ( 2 a ) from a percolate container ( 2 ),

withdrawing biogas, containing methane and CO 2 , that is generated in the first digester ( 1 ) or/and in the percolate container ( 2 ),

collecting CO 2 -containing biogas that has been generated during a fermentation process in said additional digester, wherein said biogas is collected in an earlier phase of fermentation in said additional digester relative to the phase of fermentation of the first digester ( 1 ) such that said biogas collected from said additional digester exhibits a higher CO 2 content than the biogas present in the first digester ( 1 ),

introducing the biogas collected from the additional digester into the first digester ( 1 ) as CO 2 -containing purge gas using a purge line ( 4 ), whereby the CO 2 -containing purge gas is introduced into a bottom region of the first digester ( 1 ) such that it passes through the substrate ( 1 a ), and dislodges any biogas that is present in the substrate ( 1 a ) into the substrate-free volume ( 1 b ) of the first digester ( 1 ) above the substrate ( 1 a ) for subsequent collection and removal.

2. The method of claim 1 , wherein said CO 2 -containing purge gas collected from said additional digester contains predominantly CO 2 .

3. The method of claim 1 , wherein the CO 2 -containing purge gas is introduced into the first digester ( 1 ) by connecting a purge gas port of said additional digester to said purge gas line ( 4 ) of said first digester ( 1 ).

4. A method for operating a fermentation plant with at least one digester ( 1 ) to which a substrate to be digested ( 1 a ) is supplied and for purging said digester ( 1 ) with predominantly CO 2 -containing exhaust gas comprising:

percolating the substrate ( 1 a ) with a percolate ( 2 a ) from a percolate container ( 2 );

withdrawing biogas containing at least methane and CO 2 gas that is generated in the digester ( 1 ) or/and in the percolate container ( 2 );

obtaining a predominantly CO 2 -containing exhaust gas utilizing at least one method selected from the group of methods consisting of:

(a) treating the withdrawn biogas in a biogas treatment device ( 3 ) wherein predominantly CO 2 -containing exhaust gas is separated from said at least methane and CO 2 -containing biogas that is generated in the digester ( 1 ) or/and in the percolate container ( 2 ) during treatment in the treatment device ( 3 ), whereby the treatment device ( 3 ) is configured for supplying said predominantly CO 2 -containing exhaust gas generated during the treatment process via an exhaust gas line ( 31 ); and

(b) obtaining predominantly CO 2 -containing exhaust gas from an additional digester which supplies the predominantly CO 2 -containing exhaust gas as biogas that was generated during an earlier phase of fermentation in the additional digester relative to the phase of fermentation of the digester ( 1 ) such that said biogas collected from said additional digester exhibits a higher CO 2 content than the biogas present in the digester ( 1 ), whereby the additional digester is configured for supplying said predominantly CO 2 -containing exhaust gas generated in the additional digester to the digester ( 1 ) by connecting a purge gas port of said additional digester to a purge line ( 4 ) of said digester ( 1 ); and

introducing said predominantly CO 2 -containing exhaust gas into the digester ( 1 ) and said substrate to be digested ( 1 a ), as CO 2 -containing purge gas, using said purge line ( 4 ) connected to said treatment device ( 3 ) exhaust gas line ( 31 ) and/or said purge gas port of said additional digester, whereby a port on the digester ( 1 ) is coupled to said purge line ( 4 ) and said port is configured such that during the purging process, said predominantly CO 2 -containing purge gas is introduced under pressure into a bottom region of the digester ( 1 ) and caused to flow through the substrate ( 1 a ) that is located in the digester ( 1 ) and dislodge any biogas present in the substrate ( 1 a ) into the substrate-free volume ( 1 b ) of the digester ( 1 ) above the substrate ( 1 a ) for subsequent collection and removal.

Assignments (6)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 24, 2019
From: ZERO WASTE ENERGY, LLC
To: KOMPOFERM GMBH
Reel/Frame 048124/0816 →
RELEASE OF SECURITY INTEREST Recorded Jan 18, 2019
From: TRUE WEST CAPITAL PARTNERS FUND II, LP
To: ZERO WASTE ENERGY, LLC
Reel/Frame 048063/0417 →
SECURITY INTEREST Recorded Mar 26, 2018
From: ZERO WASTE ENERGY, LLC
To: TRUE WEST CAPITAL PARTNERS FUND II, LP
Reel/Frame 045353/0418 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 25, 2015
From: KOMPOFERM GMBH
To: ZERO WASTE ENERGY, LLC
Reel/Frame 035904/0529 →
SECURITY INTEREST Recorded Dec 16, 2014
From: ZERO WASTE ENERGY, LLC
To: EGGERSMANN ANLAGENBAU KOMPOFERM GMBH
Reel/Frame 034512/0945 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 11, 2013
From: EGGERSMANN, KARLGUNTER
To: KOMPOFERM GMBH
Reel/Frame 030777/0024 →
Continuity (2)
Division 12948147 · Nov 17, 2010
Related Publication 20130302871A1 · Nov 14, 2013