IP Library Granted Patent US 9,293,908
Granted Patent B2
US 9,293,908 · App. 13/860,045 · Granted Mar 22, 2016

Method of measurement for detecting a fault of a three-phase zone

Inventor: Jérôme Jean-Louis Comeil Valire (Nogent S/Marne, FR)
Assignee: ECE
H02H3/08H02H3/28H02H7/222G01R31/008
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,293,908
App. No.
13/860,045
Granted
Mar 22, 2016
Kind
B2
Abstract

Method for protecting an electrical energy distribution box, the electrical energy distribution box comprising a set of distribution bars intended to be connected between a generator and loads, each of the bars being able to transfer at least a part of the electrical energy passing through it to at least one other bar of the set of bars. According to this method, the incoming and outgoing currents of a single distribution bar are measured and a fault in the set of bars is detected on the basis of the currents measured in the said bar.

Claims (11)

1. Method for protecting an electrical energy distribution box, the electrical energy distribution box comprising a set of distribution bars intended to be connected between a generator and loads, each of the bars being able to transfer at least a part of the electrical energy passing through it to at least one other bar of the set of bars, wherein the method comprises measuring the incoming and outgoing currents of a single distribution bar and detecting a fault in any one of the distribution bars of the set of bars on the basis of the currents measured in the said single distribution bar.

2. Method according to claim 1 , wherein the set of distribution bars comprises three distribution bars, and wherein the incoming and outgoing currents are measured on a bar located between the other two bars.

3. Method according to claim 1 , wherein the distribution box has an electrical ground able to transfer at least a part of its electrical energy to the set of distribution bars and in which a ground fault is detected by measuring the incoming and outgoing currents on a single bar of the set of bars.

4. Method according to claim 1 , wherein the distribution box comprises upstream and downstream of each of the distribution bars contactors, and wherein at least one of the said contactors is opened when a fault is detected in the set of bars.

5. Method according to claim 1 , wherein the generator is controlled by a control means, and shutdown of the generator is triggered when a fault is detected in the set of bars.

6. Method according to claim 1 , wherein the distribution bars of the set of bars extend in parallel over their whole length and are separated by one same distance of one to thirty millimeters.

7. System for protecting an electrical energy distribution box the electrical energy distribution box comprising a set of distribution bars comprising distribution bars intended to be connected between a generator and loads, each of the bars of the set being able to transfer at least a part of the electrical energy passing through it to at least one other bar of the set of bars, wherein the system comprises means for measuring current disposed upstream and downstream of a single distribution bar and processing means adapted for comparing the currents measured by the measuring means and to detect a fault in any one of the distribution bars of the set of bars on the basis of the currents measured in the said single distribution bar.

8. System according to claim 7 , wherein the set of distribution bars comprises three distribution bars, and wherein the means for measuring current are disposed upstream and downstream of a bar located between the other two bars.

9. System according to claim 7 , wherein the distribution box has an electrical ground able to transfer at least a part of its electrical energy to the set of distribution bars.

10. System according to claim 7 , further comprising, upstream and downstream of each of the distribution bars, contactors and command means adapted for opening at least one of said contactors.

11. System according to claim 7 , further comprising a control means configured for controlling shutdown of the generator.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 29, 2021
From: SAFRAN ELECTRONICS & DEFENSE COCKPIT SOLUTIONS
To: SAFRAN ELECTRICAL & POWER
Reel/Frame 055074/0024 →
CHANGE OF NAME Recorded Jan 29, 2021
From: ZODIAC AERO ELECTRIC
To: SAFRAN ELECTRONICS & DEFENSE COCKPIT SOLUTIONS
Reel/Frame 055177/0037 →
CHANGE OF NAME Recorded May 17, 2018
From: ECE
To: ZODIAC AERO ELECTRIC
Reel/Frame 046175/0717 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 17, 2013
From: VALIRE, JEROME JEAN-LOUIS CORNEIL
To: ECE
Reel/Frame 031222/0188 →
Priority Claims (1)
FR 12 53267 · Apr 10, 2012 · national
Continuity (1)
Related Publication 20130301166A1 · Nov 14, 2013