IP Library › Granted Patent US 9,594,120
Granted Patent B2
US 9,594,120 · App. 13/870,179 · Granted Mar 14, 2017

Battery monitoring apparatus and wireless field device

Inventor: Atsushi Nonoyama (Musashino, JP)
Assignee: YOKOGAWA ELECTRIC CORPORATION
G01R31/362G01R31/3662
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,594,120
App. No.
13/870,179
Granted
Mar 14, 2017
Kind
B2
Abstract

A battery monitoring apparatus is built in a device having a primary battery. The battery monitoring apparatus includes a voltage measuring module configured to obtain an open circuit voltage of the primary battery and an output voltage of the primary battery at the time when a load current flows, a current measuring module configured to obtain the load current, a first resistance value calculating module configured to obtain a first internal resistance of the primary battery based on the open circuit voltage, the load current and the output voltage, a second resistance value calculating module configured to obtain a second internal resistance of the primary battery at which the device can operate normally based on the open circuit voltage, the load current and the minimum drive voltage, and an alarm outputting module configured to output a battery life alarm when the first internal resistance is larger than the second internal resistance.

Claims (18)

1. A battery monitoring apparatus to be built in a device in which a primary battery is used as a driving power source, comprising:

a voltage measuring module configured to obtain an open circuit voltage of the primary battery and an output voltage of the primary battery at the time when a load current flows;

a current measuring module configured to obtain the load current of the primary battery;

a first resistance value calculating module configured to obtain a first internal resistance of the primary battery on the basis of the open circuit voltage, the load current and the output voltage;

a second resistance value calculating module configured to obtain a second internal resistance of the primary battery at which the device can operate normally on the basis of the open circuit voltage, the load current and a minimum drive voltage inherent in the device; and

an alarm outputting module configured to output a battery life alarm when the first internal resistance is larger than the second internal resistance,

wherein the second resistance value calculating module obtains the corresponding second internal resistance based on the open circuit voltage, by referring to a correspondence table of the open circuit voltage of the primary battery and the second internal resistance of the primary battery on the basis of a simulation performed in consideration of wireless communication of the device.

2. The battery monitoring apparatus according to claim 1 , wherein the device is a wireless field device of a process control system.

3. The battery monitoring apparatus according to claim 1 , wherein the first internal resistance is obtained by the following equation:

R 0=( V 1− V 2)/ I 1,

wherein V 1 is the open circuit voltage, I 1 is the load current, V 2 is the output voltage and R 0 is the first internal resistance.

4. The battery monitoring apparatus according to claim 1 , wherein the second internal resistance is obtained by the following equation:

Rno =( V 1− V min)/ I 1

wherein V 1 is the open circuit voltage, I 1 is the load current, Vmin is the minimum drive voltage and Rno is the second internal resistance.

5. The battery monitoring apparatus according to claim 1 , wherein the load current is calculated on the basis of the output voltage and a value of a resistor through which the load current flows.

6. A wireless field device of a process control system, comprising:

a primary battery as a driving power source; and

the battery monitoring apparatus according to claim 1 , configured to monitor the primary battery.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 25, 2013
From: NONOYAMA, ATSUSHI
To: YOKOGAWA ELECTRIC CORPORATION
Reel/Frame 030285/0657 →
Priority Claims (1)
JP 2012-099626 · Apr 25, 2012 · national
Continuity (1)
Related Publication 20130289908A1 · Oct 31, 2013