IP Library Granted Patent US 10,208,577
Granted Patent B2
US 10,208,577 · App. 14/049,877 · Granted Feb 19, 2019

Method for efficient dynamic gridding

Inventors: Hussein Hoteit (Katy, TX); Adwait Chawathe (Sugar Land, TX)
Assignee: CHEVRON U.S.A. INC.
E21B43/16E21B43/00E21B49/00G01V99/005G01V2210/66
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,208,577
App. No.
14/049,877
Granted
Feb 19, 2019
Kind
B2
Abstract

A method, system and computer readable medium is presented for use in enhancing oil recovery in a subsurface reservoir comprising. The method, system and computer readable medium defines a plurality of grid levels on a geological model of a subsurface reservoir. Connectivities and transmissibilities are calculated between neighboring cells in the same grid and between connecting cells between different grid levels. Gas and/or fluid dynamics are simulated using dynamic grid refinement where the connectivities and transmissibilities are updated at each time step based on the previously calculated connectivities and transmissibilities.

Claims (26)

1. A method for enhancing resource recovery in a subsurface reservoir comprising:

(a) receiving, at a computer, a geological model of the subsurface reservoir;

(b) defining a first grid having a first plurality of cells, wherein the first plurality of cells have heterogeneous rock properties;

(c) defining a second grid having a second plurality of cells, wherein the second plurality of cells are finer than the first plurality of cells, and wherein the second plurality of cells have heterogeneous rock properties;

(d) calculating connectivities and transmissibilities of neighboring cells in the first plurality of cells from the geological model, and storing the calculated connectivities and transmissibilities of the neighboring cells in the first plurality of cells in a database;

(e) calculating connectivities and transmissibilities of neighboring cells in the second plurality of cells from the geological model, and storing the calculated connectivities and transmissibilities of the neighboring cells of the second plurality of cells in the database;

(f) calculating connectivities and transmissibilities of connecting cells between the first plurality of cells and the second plurality of cells, and storing the calculated connectivities and transmissibilities of the connecting cells between the first plurality of cells and the second plurality of cells in the database;

(g) performing a simulation of a fluid and/or gas flowing in the subsurface reservoir using dynamic grid refinement using a dynamic multilevel grid, wherein the dynamic multilevel grid is comprised of at least a portion of the first plurality of cells and at least a portion of the second plurality of cells and wherein the dynamic multilevel grid is updated dynamically such that the dynamic multilevel grid is refined at a displacement front of the fluid and/or gas flowing in the subsurface reservoir and wherein the connectivities and transmissibilities are updated during the simulation based on the calculated connectivities and transmissibilities that are stored in the database;

(h) using the simulation to select one or more new wells and an associated location of each new well for recovering the resource from the subsurface reservoir;

drilling each of the one or more new wells at the associated location from the simulation for recovering the resource from the subsurface reservoir; and

(j) recovering the resource from the subsurface reservoir using the one or more new wells from the simulation.

2. The method of claim 1 , wherein reservoir related input used for defining the first grid or the second grid comprises one or more of initial grid sizes, number of grids, rock model data, heterogeneity data for one or more grids, size of grid, displacement fluid and/or gas fronts to be tracked, thresholds, time step length, and total time.

3. The method of claim 1 , further comprising defining one or more additional grids which overlay the first grid.

4. The method of claim 3 , wherein the connecting cells connectivities and transmissibilities are calculated and stored in the database between all grids.

5. The method of claim 1 , wherein the dynamic multilevel grid is a Cartesian, perpendicular bisector, or corner-point-geometry grid.

6. The method of claim 1 , wherein each cell is assigned a parameter including one or more of porosity, permeability, saturation, composition and pressure.

7. The method of claim 1 , wherein the simulated fluid and/or gas comprises one or more of water, a surfactant, CO 2 , steam, and polymer.

8. The method of claim 1 , wherein a cell from the first grid has different rock properties from an equivalently positioned cell or cells of the second grid.

9. The method of claim 1 , wherein simulating the fluid and/or gas includes simulating sequential injection of different types of fluid and/or gas into the reservoir.

10. The method of claim 9 , wherein the finer of the two grids is used at intersections between different types of fluid and/or gas.

11. The method of claim 1 , wherein grid cells which are active when simulating a fluid and/or gas flowing in the reservoir are consecutively numbered.

12. The method of claim 1 , further comprising predicting production rates of one or more of oil, gas, and water.

13. The method of claim 1 , further comprising tracking one or more gas or liquid fronts.

14. The method of claim 13 , wherein tracking the front comprises tracking saturation and/or composition.

15. The method of claim 1 , wherein the connectivities and the transmissibilities are calculated based on the heterogeneous rock properties of each cell.

16. The method of claim 1 , wherein the dynamic multilevel grid is updated dynamically such that the dynamic multilevel grid is coarsened behind the displacement front of the fluid and/or gas flowing in the subsurface reservoir.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 24, 2013
From: HOTEIT, HUSSEIN; CHAWATHE, ADWAIT
To: CHEVRON U.S.A. INC.
Reel/Frame 031466/0467 →
Continuity (1)
Related Publication 20150100293A1 · Apr 9, 2015
Cited By (1)
US 12,724,946