IP Library › Granted Patent US 9,920,936
Granted Patent B2
US 9,920,936 · App. 14/051,598 · Granted Mar 20, 2018

Air conditioning apparatus

Inventors: Yoshiro Aoyagi (Tokyo, JP); Taro Hattori (Tokyo, JP); Koji Matsuzawa (Tokyo, JP)
Assignee: Mitsubishi Electric Corporation
F24D3/18F24D19/1039F24D19/1072F24F3/06F24F5/0003F24F5/0096F24D17/02F24D2200/12F24D2220/042
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,920,936
App. No.
14/051,598
Granted
Mar 20, 2018
Kind
B2
Abstract

An object is to enable the dealer or user of an air conditioning apparatus to recognize that the heat dissipation amount of a heat exchange device is less than the heat dissipation amount expected of the air conditioning apparatus. A control device detects a hot water outflow temperature being a temperature of a fluid heated by a heat pump device, and a return temperature being a temperature of the fluid before being heated by the heat pump device, and checks whether or not a temperature difference between the detected hot water outflow temperature and the detected return temperature is smaller than a predetermined first value. If the control device judges that the temperature difference is smaller than the first value, it displays insufficiency of the heat dissipation amount of a heat exchange device, on a display of a remote controller.

Claims (26)

1. An air conditioning apparatus adapted to increase a room temperature by supplying a fluid heated by a heat pump device to a heat exchange device installed in a room, comprising:

a hot water outflow temperature detection part which detects a hot water outflow temperature being a temperature of the fluid after being heated by the heat pump device;

a return temperature detection part which detects a return temperature being a temperature of the fluid before being heated by the heat pump device;

a temperature difference checking part which checks whether or not a temperature difference between the hot water outflow temperature detected by the hot water outflow temperature detection part and the return temperature detected by the return temperature detection part is smaller than a predetermined first threshold;

a room temperature detection part which detects a room temperature being a temperature of the room where the heat exchange device is installed;

a room temperature checking part which checks whether or not a post-temperature being a room temperature detected by the room temperature detection part at a lapse of a predetermined period of time since a predetermined timing, is higher than a pre-temperature being a room temperature detected by the room temperature detection part at the predetermined timing, by not less than a predetermined second threshold; and

a notification part which determines whether heat dissipation amount is insufficient based on both (i) the temperature difference checking part judges that the temperature difference is smaller than the first threshold and (ii) the room temperature checking part judges that the post-temperature is not higher than the pre-temperature by not less than the second threshold, and only when both (i) and (ii) exist, the notification part notifies that the heat exchange device has a heat dissipation amount that is insufficient.

2. The air conditioning apparatus according to claim 1 ,

wherein the heat pump device is capable of not only heating the fluid but also cooling the fluid,

the air conditioning apparatus further comprising:

an operation control part which conducts a test operation including: executing a cooling operation of decreasing the room temperature by cooling the fluid with the heat pump device and supplying the fluid cooled to the heat exchange device; and thereafter executing a heating operation of increasing the room temperature by heating the fluid with the heat pump device and supplying the fluid heated to the heat exchange device,

wherein the temperature difference checking part checks whether or not the temperature difference is smaller than the first threshold while the operation control part executes the heating operation in the test operation.

3. The air conditioning apparatus according to claim 1 ,

wherein the heat pump device is capable of not only heating the fluid but also cooling the fluid,

the air conditioning apparatus further comprising:

an operation control part which conducts a test operation including: executing cooling operation of decreasing the room temperature by cooling the fluid with the heat pump device and supplying the fluid cooled to the heat exchange device; and thereafter executing a heating operation of increasing the room temperature by heating the fluid with the heat pump device and supplying the fluid heated to the heat exchange device,

wherein the temperature difference checking part checks whether or not the temperature difference is smaller than the first threshold while the operation control part executes the heating operation in the test operation, and

wherein the room temperature checking part checks whether or not the post-temperature being the room temperature detected by the room temperature detection part at the lapse of the predetermined period of time since the heating operation is started, is higher than the pre-temperature being the room temperature detected by the room temperature detection part when the heating operation is started, by not less than the predetermined second threshold.

4. The air conditioning apparatus according to claim 1 ,

wherein the notification part notifies information indicating that the heat dissipation amount of the heat exchange device is insufficient, by displaying the information on at least either one of a remote controller of the air conditioning apparatus and a computer connected to the air conditioning apparatus.

5. The air conditioning apparatus according to claim 1 ,

wherein the heat pump device is configured to heat the fluid and cool the fluid, further comprising:

an operation control part which conducts a test operation that checks whether the heat dissipation amount of the heat exchange device is sufficient, the operation control part is configured to, as the test operation:

execute a cooling operation of decreasing the room temperature by cooling the fluid with the heat pump device and supplying the fluid cooled to the heat exchange device; and

then execute a heating operation of increasing the room temperature, which was decreased, by heating the fluid with the heat pump device and supplying the fluid heated to the heat exchange device; and

check, while the operation control part executes the heating operation in the test operation, by the temperature difference checking part, whether or not the temperature difference between the hot water outflow temperature and the return temperature is smaller than the first threshold.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 11, 2013
From: AOYAGI, YOSHIRO; HATTORI, TARO; MATSUZAWA, KOJI
To: MITSUBISHI ELECTRIC CORPORATION
Reel/Frame 031387/0375 →
Priority Claims (1)
JP 2012-280510 · Dec 25, 2012 · national
Continuity (1)
Related Publication 20140174117A1 · Jun 26, 2014