IP Library Granted Patent US 9,519,014
Granted Patent B2
US 9,519,014 · App. 14/099,351 · Granted Dec 13, 2016

Systems and methods for calculating power transmission line capacity

Inventors: Robert Aaserude (Walnut Creek, CA); Ryan Bliss (Salt Lake City, UT)
Assignee: Dynamic Engineers, Inc.
G01R27/02H02J3/00H02J2003/007Y02E60/76Y04S40/22
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,519,014
App. No.
14/099,351
Granted
Dec 13, 2016
Kind
B2
Abstract

The present disclosure provides a methodology that incorporates real-time measurement of conductor temperatures and ground clearances using a transmission line monitor, coupled with information technology and data analytics, to allow utility operators to manage their transmission systems using a dynamic line rating process. Dynamic line ratings may incorporate real-time or near-real-time data of transmission line conditions in lieu of conservative assumptions, in order to more accurately assess actual transmission line performance such that more of the power conveying capacity of the existing transmission infrastructure can be accessed with continued compliance with safety requirements applicable to the transmission line system.

Claims (33)

1. An apparatus for determining a current rating for an electrical transmission line, comprising:

at least one ground clearance monitor located on a power transmission line;

at least one line temperature monitor located on the power transmission line;

a central server computer system comprising:

a receiver configured to receive actual line clearance measurements and actual line temperature measurements from the monitors located on the power transmission line; and

a processor coupled with the receiver and configured to calculate a dynamic ampacity for the transmission line based at least in part on the line clearance, line temperature, and conductor characteristics of one or more conductors of the transmission line; and

a user system capable of displaying the dynamic ampacity for the transmission line resulting in an adjusted load-temperature relationship for the power transmission line.

2. The apparatus of claim 1 , wherein the dynamic ampacity for the transmission line is calculated using a least squares regression analysis of actual conductor temperature and line clearance measurement data pairs.

3. The apparatus of claim 2 , wherein the actual conductor temperature and line clearance measurement data pairs are received from a transmission line monitor located on the transmission line.

4. The apparatus of claim 2 , wherein the processor is further configured to calculate a relationship between actual conductor temperature and line clearance.

5. The apparatus of claim 4 , wherein the processor is further configured to calculate an effective temperature for a measured value of line clearance, and wherein the dynamic ampacity for the transmission line is based at least in part of the calculated effective temperature.

6. The apparatus of claim 1 , wherein said at least one ground clearance monitor comprises a LIDAR.

7. The apparatus of claim 1 , wherein the receiver is configured to periodically receive line clearance measurements and line temperature measurements from a plurality of transmission line monitors.

8. The apparatus of claim 7 , wherein the processor is further configured to periodically update the dynamic ampacity based on the received measurements.

9. The apparatus of claim 1 , wherein the processor is further configured to calculate an amount of additional capacity available for the transmission line.

10. The apparatus of claim 9 , wherein the processor is further configured to forecast an available ampacity for the transmission line for a future time period based on an expected temperature of the transmission line at the future time period.

11. A method for determining a current rating for an electrical transmission line, comprising:

providing at least one ground clearance monitor and at least one line temperature monitor on said power transmission line;

providing a central server computer system comprising:

receiving line clearance measurements and line temperature measurements for a transmission line; and

calculating a dynamic ampacity for the transmission line based at least in part on the line clearance, line temperature, and conductor characteristics of one or more conductors of the transmission line; and

providing said calculated dynamic ampacity for the transmission line on a user system display;

adjusting a load-temperature relationship from said power transmission line; and

managing power transmission of said power transmission line.

12. The method of claim 11 , wherein the dynamic ampacity for the transmission line is calculated using a least squares regression analysis of actual conductor temperature and line clearance measurement data pairs.

13. The method of claim 12 , wherein the actual conductor temperature and line clearance measurement data pairs are received from a transmission line monitor located on the transmission line.

14. The method of claim 12 , further comprising calculating a relationship between actual conductor temperature and line clearance.

15. The method of claim 14 , further comprising calculating an effective temperature for a measured value of line clearance, and wherein the dynamic ampacity for the transmission line is based at least in part of the calculated effective temperature.

16. The method of claim 11 , wherein said at least one ground clearance monitor comprises a LIDAR.

17. The method of claim 11 , wherein receiving the receive line clearance measurements and line temperature measurements comprises receiving the measurement periodically from a plurality of transmission line monitors.

18. The method of claim 17 , further comprising periodically updating the dynamic ampacity based on the received measurements.

19. The method of claim 11 , further comprising calculating an amount of additional capacity available for the transmission line.

20. The method of claim 11 , further comprising forecasting an available ampacity for the transmission line for a future time period based on an expected temperature of the transmission line at the future time period.

Assignments (5)
SECURITY INTEREST Recorded Apr 3, 2026
From: LINDSEY MANUFACTURING CO.; LINDSEY FIRESENSE, LLC
To: MONROE CAPITAL MANAGEMENT ADVISORS, LLC, AS COLLATERAL AGENT
Reel/Frame 074274/0460 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 2, 2022
From: DYNAMIC ENGINEERS, INC.
To: LINDSEY MANUFACTURING CO.
Reel/Frame 061632/0995 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 11, 2014
From: AASERUDE, ROBERT; BLISS, RYAN
To: MWH
Reel/Frame 032195/0637 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 11, 2014
From: MWH AMERICAS, INC
To: DYNAMIC ENGINEERS, INC.
Reel/Frame 032195/0811 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 11, 2014
From: AASERUDE, ROBERT; BLISS, RYAN
To: MWH AMERICAS, INC
Reel/Frame 032195/0937 →
Continuity (2)
Provisional Application 61734191 · Dec 6, 2012
Related Publication 20140180616A1 · Jun 26, 2014