IP Library › Granted Patent US 9,168,576
Granted Patent B2
US 9,168,576 · App. 14/113,948 · Granted Oct 27, 2015

Tower production method

Inventor: Cevdet Unan (Ankara, TR)
Assignee: Uztek Endustri Tesisleri Insaat Imalat Ve Montaj Sanayi Ve Ticaret Limited Sirketi
B21C47/02B21C37/122B21C37/124B21C37/126B21C37/15B21C37/185Y10T29/49631Y10T29/49826
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,168,576
App. No.
14/113,948
Granted
Oct 27, 2015
Kind
B2
Abstract

A tower (C) production method is developed with the present invention, comprising a first production stage including the steps of unrolling and bringing into a planar state a sheet metal (B) wound around a coil (A); bending the planar sheet metal (B) at the lateral direction at varying bending radii (d); and winding the bent sheet metal (B′) into a conical coil (A′), as well as a final production stage yielding the tower and including the steps of feeding the sheet metal (B′) unwound from the conical coil (A′) to at least one winding machine ( 8 ), and bending and winding the bent sheet metal (B′) in the winding machine around a central bending axis (T) parallel to one surface (B 1 ) thereof so that a defined initial winding radius and the angle between a longer edge (B 3 ) thereof and the axis (T) are kept constant and the longer edge (B 3 ) of the sheet metal is joined over itself.

Claims (18)

1. A tower production method, characterized by comprising a first production stage, including the steps of:

unrolling and bringing into a planar state a sheet metal (B) wound around a coil (A),

bending the planar sheet metal (B) at the lateral direction at varying bending radii (d), creating a bent sheet metal (B′) and

winding the bent sheet metal (B′) in the form of a conical coil (A′);

transporting the conical coil (A′) to a site of final production, after the sheet metal (B) is first bent and then wound in the first production stage in the form of a conical coil (A′);

and a final production stage, including the steps of:

feeding the bent sheet metal (B′) unwound from the conical coil (A′) to at least one winding machine ( 8 ),

producing a tower (C) by bending and winding the bent sheet metal (B′) in the winding machine ( 8 ) around a central bending axis (T) substantially parallel to a wider surface (B 1 ) thereof of the sheet metal so that a defined initial predetermined starting winding radius and the angle between a longer edge (B 3 ) thereof of the bent sheet metal (B′) and the central bending axis (T) are kept substantially constant and a longer edge (B 3 ) of the bent sheet metal (B′) is joined over itself to produce a tower (C) with the other longer edge (B 3 ) of the bent sheet metal (B′).

2. The tower (C) production method according to claim 1 , characterized in that the first production stage comprises the step of joining one sheet metal (B) to another sheet metal (B), so that the shorter edges (B 2 ) thereof extending along the width (w) of the sheet metals (B) are welded to each other end-to-end.

3. The tower (C) production method according to claim 1 , characterized in that the first production stage comprises the step of cutting at least one longer edge (B 3 ) of the bent sheet metal (B′) linearly tangentially to said longer edge (B 3 ) of the bent sheet metal (B′) to smooth said longer edge (B 3 ).

4. The tower (C) production method according to claim 1 , characterized in that the first production stage comprises the step of producing weld pools on at least one longer edge (B 3 ) of the sheet metal (B).

5. The tower (C) production method according to claim 1 , characterized in that the first production stage comprises the step of sand blasting the bent sheet metal (B′) after the sheet metal (B) is subjected to the bending operation.

6. The tower (C) production method according to claim 5 , characterized in that the first production stage comprises the step of painting the bent sheet metal (B′) following the sand blasting operation.

7. The tower (C) production method according to claim 1 , characterized in that the first production stage comprises the step of winding the bent sheet metal (B′) around an accumulator ( 7 ) before the bent sheet metal (B′) is wound into a conical coil (A′).

8. The tower (C) production method according to claim 1 , characterized in that the position of the bent sheet metal (B′) with respect to the winding machine ( 8 ) is changed according to different bending radii, in the step of feeding the bent sheet metal (B′) to the winding machine ( 8 ) in the final production stage.

9. The tower (C) production method according to claim 1 , characterized in that the final production stage comprises the step of joining one bent sheet metal (B′) to another bent sheet metal (B′), so that the shorter edges (B 2 ) of the bent sheet metals (B′) are welded to each other end-to-end.

10. The tower (C) production method according to claim 9 , characterized by comprising a step of joining together bent sheet metals (B′) with different thicknesses by means of welding them end-to-end.

11. The tower (C) production method according to claim 1 , characterized in that the sheet metal (B) is processed substantially vertically with the wider surface thereof being vertical to the ground before bending in the first production stage and then the bent sheet metal (B′) is tilted following the bending operation.

Assignments (2)
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE NAME MISSPELLED, SHOULD BE: UZTEK ENDUSTRI TESISLERI INSAAT IMALAT VE MONTAJ SANAYI VE TICARET LIMITED SIRKETI PREVIOUSLY RECORDED ON REEL 031479 FRAME 0254. ASSIGNOR(S) HEREBY CONFIRMS THE UZTEK ENDUSTRI INSAAT IMALAR VE MONTAJ SANAYI VE TICARET LIMITED SIRKETI. Recorded Mar 5, 2014
From: UNAN, CEVDET
To: UZTEK ENDUSTRI TESISLERI INSAAT IMALAT VE MONTAJ SANAYI VE TICARET LIMITED SIRKETI
Reel/Frame 032386/0432 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 25, 2013
From: UNAN, CEVDET
To: UZTEK ENDUSTRI INSAAT IMALAR VE MONTAJ SANAYI VE TICARET LIMITED SIRKETI
Reel/Frame 031479/0254 →
Priority Claims (1)
TR a 2011 04141 · Apr 27, 2011 · national
Continuity (1)
Related Publication 20140047696A1 · Feb 20, 2014