Control system for matching the output of a steam turbine to a changed load

Inventor: Andreas Dengel (Neunkirchen, DE)
Assignee: Ulrich DREIZLER
F01K3/006F01K3/06F01K3/12F01K7/22F01K7/345F01K7/40F01K13/02F28D20/00F28D20/02F28D2020/0047Y02E60/142
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,212,568
App. No.
14/115,435
Granted
Dec 15, 2015
Kind
B2
Abstract

The invention relates to a control system for matching the output of a steam turbine ( 2 ) to a changed load, in particular for the short-term matching of the output of a power plant steam turbine ( 2 ) to changed network loads within the context of primary control. The control system according to the invention is characterized by a heat store ( 33 ) which, when there is an increased volume of steam tapped off from the steam turbine ( 2 ) under a correspondingly reduced load, extracts heat from the steam and which, when there is a reduced quantity of steam tapped off from the steam turbine under a correspondingly increased load, gives up heat to a steam/feed water circuit supplying the steam turbine ( 2 ).

Claims (11)

1. Control system for matching the output of a steam turbine to a changed load, the control system comprising:

a heat reservoir

that extracts and absorbs heat from tapped steam from a line when an increased amount of steam is tapped from the steam turbine in accordance with a reduced load, wherein the line feeds the tapped steam to a pre-heating segment of a steam-feed water circuit, and the steam/feed water circuit supplies the steam turbine,

that gives off heat to the pre-heating segment of the steam/feed water circuit when a reduced amount of steam is tapped from the steam turbine in accordance with an increased load, and

that is a latent heat reservoir that absorbs or gives off heat at a constant temperature.

2. Control system according to claim 1 , wherein the heat reservoir is provided for absorbing heat and giving off heat, in each instance, while keeping the total heat being transferred to the feed water in the pre-heating segment constant.

3. Control system according to claim 1 , wherein the tapped steam is steam tapped in the high-pressure region of the steam turbine.

4. Control system according to claim 1 , wherein the heat reservoir is provided to give off heat to the steam/feed water circuit in the high-pressure region of the steam/feed water circuit.

5. Control system according to claim 1 , wherein the heat reservoir is provided with absorption of heat from a further heat source, instead of from tapped steam.

6. Control system according to claim 1 , wherein multiple heat reservoirs that absorb or give off heat at different temperatures are provided.

7. Control system according to claim 1 , wherein the heat reservoir has molten salt as the storage substance.

Assignments (2)
CHANGE OF NAME Recorded Mar 16, 2023
From: STEAG NEW ENERGIES GMBH
To: IQONY ENERGIES GMBH
Reel/Frame 062997/0732 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 6, 2013
From: DENGEL, ANDREAS
To: STEAG NEW ENERGIES GMBH
Reel/Frame 031553/0443 →
Priority Claims (1)
DE 10 2011 100 517 · May 5, 2011 · national
Continuity (1)
Related Publication 20140090378A1 · Apr 3, 2014