Abstract

Optimizing a multiple machine production line, in which operation of at least some of the machines depends on others. A productivity system examines performance indicators of a set of machines, which are disposed to cooperate in a production line, and sets control variables for each of those machines, with the effect of optimizing the production line. The productivity system receives a set of KPIs for each machine, and provides a set of control variables for each machine. The productivity system determines the control variables for each machine so as to optimize the production line.

Claims (25)

1 . A method of optimizing a multiple machine line, comprising:

collecting one or more key performance indicators for one or more elements on a production line;

storing said one or more key performance indicators in a buffer;

using a computer to analyze said key performance indicators;

outputting control variables to one or more of the elements on said production line, to increase the efficiency of said production line.

2 . The method of claim 1 , wherein:

said key performance indicators include one or more of whether one or more of each elements is active, whether any element is starved, whether each element is full, a current run rate or cycle time, information about element status or operability, wait time for operation, and information relating to a given unit being processed

3 . The method of claim 2 , wherein:

the efficiency of said production line is increased by increasing finished goods produced per unit time.

4 . The method of claim 2 , wherein:

the efficiency of said production line is increased by decreasing the amount of down time for one or more elements in the production line

5 . The method of claim 2 , wherein:

the efficiency of said production line is increased by decreasing the mean time between failures on the production line.

6 . The method of claim 2 , wherein:

the efficiency of said production line is increased by increasing the overall average speed of said production line.

7 . The method of claim 1 , wherein:

one or more of said key performance indicators indicate whether any element is in one or more of the following states: faulted, starved, saturated, operable, and active.

8 . The method of claim 1 , wherein:

one or more of said key performance indicators indicate whether any element is partially or wholly inoperable.

9 . The method of claim 1 , wherein:

said computer includes a storage medium.

10 . The method of claim 1 , wherein:

said computer includes non-transitory machine-readable medium.

11 . The method of claim 10 , wherein:

said non-transitory machine-readable medium comprises one or more of magnetic storage media, optical storage media, magneto-optical storage media, read only memory, random access memory, erasable programmable memory, and flash memory.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 27, 2015
From: J&L GROUP INTERNATIONAL, LLC
To: ALLIANCE MACHINE SYSTEMS INTERNATIONAL, LLC
Reel/Frame 036440/0350 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 11, 2014
From: BATRIN, MARIUS D.; WILKINSON, RICHARD W.
To: J&L GROUP INTERNATIONAL, LLC
Reel/Frame 032194/0721 →