IP Library Granted Patent US 10,174,599
Granted Patent B2
US 10,174,599 · App. 14/666,519 · Granted Jan 8, 2019

Split stream oilfield pumping systems

Inventors: Rod Shampine (Houston, TX); Paul Dwyer (St. John's, CA); Ronnie Stover (Houston, TX); Mike Lloyd (Katy, TX); Jean-Louis Pessin (Paris, FR); Edward Kent Leugemors (Needville, TX); Larry D. Welch (Missouri City, TX); Joe Hubenschmidt (Sugar Land, TX); Philippe Gambier (Houston, TX); William Troy Huey (Fulshear, TX); Thomas Allan (Paris, FR)
Assignee: Schlumberger Technology Corporation
E21B43/25E21B43/16E21B43/26E21B43/267
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,174,599
App. No.
14/666,519
Granted
Jan 8, 2019
Kind
B2
Abstract

A method of pumping an oilfield fluid from a well surface to a wellbore is provided that includes providing a clean stream; operating one or more clean pumps to pump the clean stream from the well surface to the wellbore; providing a dirty stream including a solid material disposed in a fluid carrier; and operating one or more dirty pumps to pump the dirty stream from the well surface to the wellbore, wherein the clean stream and the dirty stream together form said oilfield fluid.

Claims (29)

1. A method of pumping an oilfield fluid from a well surface to a wellbore comprising:

operating at least one pump to pump a first stream comprising water directly from at least one water tank to a common manifold positioned at the well surface;

operating at least one other pump to pump a second stream comprising fiber and a fluid carrier to the common manifold positioned at the well surface;

combining the first stream and the second stream in the common manifold to form the oilfield fluid, and

introducing the oilfield fluid to the wellbore.

2. The method of claim 1 , wherein the at least one pump is a same type of pump as the at least one other pump.

3. The method of claim 2 , wherein the at least one pump and the at least one other pump are each a plunger pump.

4. The method of claim 1 , wherein the at least one pump is a different type of pump from the at least one other pump.

5. The method of claim 4 , wherein the at least one pump is a multistage centrifugal pump and the at least one other pump is a plunger pump.

6. The method of claim 5 , wherein the at least one pump is a progressing cavity pump and the at least one other pump is a plunger pump.

7. The method of claim 1 , wherein more pumps are operated than other pumps.

8. The method of claim 1 , wherein the oilfield fluid is a fracturing fluid.

9. The method of claim 1 , wherein the second stream further comprises a solid material selected from the group consisting of a particle, a material having a manufactured shape, and combinations thereof.

10. The method of claim 9 , wherein the first stream comprises at least a concentration of solids that is lower than a concentration of solids in the second stream.

11. A system for pumping an oilfield fluid from a well surface to a wellbore, said system comprising, at the well surface:

a water source comprising a water tank at the well surface for supplying water to at least one of the first stream and second stream;

a first stream comprising water from the water source;

a second stream comprising a fiber;

a common manifold that is connected to the first stream and the second stream, said common manifold combining the first stream and the second stream to form the oilfield fluid; and

at least one pump at the well surface for pumping the first stream to the common manifold, wherein said at least one pump is directly connected to the water tank at one end and to the common manifold at another end.

12. The system of claim 11 , wherein the at least one pump is selected from a group comprising a multistage centrifugal pump, a progressing cavity pump, and a plunger pumps.

13. The system of claim 11 , further comprising a gel maker receiving water from the water source and adapted to mix the water and a gelling agent.

14. The system of claim 13 , further comprising a blender at the well surface that receives a mixture of the water and the gelling agent from the gel maker and further combines the mixture with the fiber to form the second stream.

15. The system of claim 11 , further comprising at least one other pump at the well surface for pumping the second stream to the common manifold, wherein said at least one other pump is connected to the blender at one end and to the common manifold at another end.

16. The system of claim 15 , wherein the at least one other pump is a plunger pump.

17. The system of claim 11 , wherein the common manifold is further connected to the wellbore for introducing the oilfield fluid into the wellbore.

18. The system of claim 11 , wherein the second stream further comprises at least one of a foam stabilizer, a pH changer, a corrosion preventer, a scale inhibitor, and a detergent.

19. The system of claim 11 , wherein the second stream further comprises a solid material selected from the group consisting of a particle, a material having a manufactured shape, and combinations thereof.

20. The system of claim 19 , wherein the first stream comprises at least a concentration of solids that is lower than a concentration of solids in the second stream.

Assignments (4)
CHANGE OF NAME Recorded Nov 4, 2024
From: LIBERTY OILFIELD SERVICES LLC
To: LIBERTY ENERGY SERVICES LLC
Reel/Frame 069293/0102 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 17, 2024
From: SCHLUMBERGER TECHNOLOGY CORPORATION
To: LIBERTY OILFIELD SERVICES LLC
Reel/Frame 068928/0611 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 16, 2024
From: SHAMPINE, ROD; DWYER, PAUL; STOVER, RONNIE; LLOYD, MIKE; PESSIN, JEAN-LOUIS; LEUGEMORS, EDWARD; WELCH, LARRY D.; HUBENSCHMIDT, JOE; GAMBIER, PHILIPPE; HUEY, WILLIAM TROY; ALLAN, TOM
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 068919/0113 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 16, 2024
From: SCHLUMBERGER TECHNOLOGY CORPORATION
To: LIBERTY OILFIELD SERVICES LLC
Reel/Frame 068919/0202 →
Continuity (7)
Continuation 14079794 · Nov 14, 2013
Continuation 13711219 · Dec 11, 2012
Continuation 13235699 · Sep 19, 2011
Continuation 12958716 · Dec 2, 2010
Continuation 11754776 · May 29, 2007
Provisional Application 60803798 · Jun 2, 2006
Related Publication 20150204173A1 · Jul 23, 2015
Cited By (21)
US 12,276,577 US 12,281,964 US 12,286,872 US 12,286,874 US 12,305,495 US 12,326,075 US 12,338,772 US 12,378,864 US 12,385,379 US 12,404,856 US 12,408,291 US 12,428,943 US 12,467,348 US 12,497,879 US 12,510,028 US 12,510,070 US 12,516,632 US 12,534,992 US 12,584,394 US 12,631,102 US 12,662,923