IP Library Granted Patent US 9,608,563
Granted Patent B2
US 9,608,563 · App. 14/722,686 · Granted Mar 28, 2017

Method for detecting the degree of soiling of PV modules

Inventors: Agustin Javier Carretero Batista (Berlin, DE); Hendrik Hoffmann (Zeuthen, DE)
Assignee: SKYTRON ENERGY GMBH
H02S50/10G01N27/00G01R21/00G01R21/06H02S50/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,608,563
App. No.
14/722,686
Granted
Mar 28, 2017
Kind
B2
Abstract

A method for detecting the degree of soiling of PV modules of a string includes the following steps: determination of the deviations of the string power output values from a calculated reference value over the last year; calculation of a historical trend line from the deviations; determination of a maximum difference between the trend line and the deviations; calculation of final deviations of the power output values through subtraction of the maximum difference from the trend line; and determination of the degree of soiling through subtraction of the final deviations from the deviations.

Claims (17)

1. A method for detecting the degree of soiling of PV modules of a string, with the following steps:

determination of the deviations of the string power output values from a calculated reference value over the last year;

calculation of a historical trend line from the deviations;

determination of a maximum difference between the trend line and the deviations;

calculation of final deviations of the string power output values through subtraction of the maximum difference from the trend line; and

determination of the degree of soiling through subtraction of the final deviations from the deviations.

2. The method as set forth in claim 1 , wherein the method is based on daily values.

3. The method as set forth in claim 1 , wherein an irradiation sensor is used for the calculation of the string power output values.

4. The method as set forth in claim 3 , wherein a temporal mismatch of the string power output values as a result of alignment errors of the irradiation sensor is determined and considered.

5. The method as set forth in claim 3 , wherein measurement errors as a result of the ageing of the irradiation sensor are determined by comparing all previously observed cloud-free days and considered.

6. The method as set forth in claim 1 , wherein string power output values from a time interval around a maximum elevation angle of the sun are used.

7. The method as set forth in claim 1 , wherein the string power output values are discarded if an output power of an inverter of the string exceeds a threshold, the threshold being greater than 95 percent and less than 100 percent of a rated output power of the inverter.

8. The method as set forth in claim 1 , wherein the string power output values are discarded if an average measured radiation deviates from a simulated radiation by a threshold value, the threshold lying between 5 percent and 25 percent.

9. The method as set forth in claim 1 , wherein the string power output values are discarded if a deviation between two temporally successive measured values of the radiation exceeds a threshold, the threshold lying between 100 watts per square meter and 300 W per square meter.

10. The method as set forth in claim 1 , wherein the string power output values are discarded if an output power of an inverter of the string has been limited.

11. The method as set forth in claim 1 , wherein an entire operating time of the PV modules is observed.

12. The method as set forth in claim 1 , wherein the degree of soiling of at least one string is determined.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 13, 2015
From: HOFFMANN, HENDRIK; CARRETERO BATISTA, AGUSTIN JAVIER
To: SKYTRON ENERGY GMBH
Reel/Frame 036320/0854 →
Priority Claims (1)
DE 10 2014 107 417 · May 27, 2014 · national
Continuity (1)
Related Publication 20150346123A1 · Dec 3, 2015